Project
Shell Project No: HP-3000-QAT
Project Document Number: T- 4.318.708
2MH127
Tag/Item Number(s):
N/A
Unit(s):
ASU
PCWBS:
LINDE ENGINEERING
Page 2 of 9
5887
18.02.09
SB
EO
AG
RFC
12.02.09
SB
EO
AG
RFC
28.12.08
SB
EO
AG
IFR
24.12.08
SB
EO
AG
CCI
14.12.08
SB
EO
AG
ICC
08.11.08
SB
EO
AG
IFR
25.10.08
SB
EO
AG
IIR
Date
Description
GAMA
Rev.
No.
Project
Rev
No.
Status
Document Title:
Contractor
LOC470
GAM
ITP
QAC
GTL
041
Org.
Code
Doc.
Type
Disc.
Code
Geogr.
Area
Seq.
No
Rev.
No
Vendor Code
Rev No: A
X. CONTRACTOR QC
C. COMPANY
I: INSPECTION / TEST
R: DOCUMENT ISSUED/REPORT REVIEW
S: SURVEILANCE
H: HOLD POINT (Notification Required and Presence Mandatory). W: WITNESS (Notification Required but Presence not Mandatory)
Item
1.0
1.1
Activity
Test Frequency
METHOD STATEMENTS/PROCEDURES
Method Statements /
Prior to start of
Procedures
activity
Preparation
Reference Document
Acceptance Criteria
Responsible Party
Verifying Documents
Subcontractor Method
Statements / Procedure
Project
Requirements
QA/QC
R R
Manufacturers
Technical data
sheet, certificates
QC Civil
Inspector
GAM-QCR-QACGTL-164
R R
Manufacturers
recommendation.
QC Civil
Inspector
Visual confirmation
S S
QC Civil
Inspector
GAM-QCR-QACGTL-164
S S
2.0
MATERIALS CERTIFICATES
2.1
100%
2.2
100%
T.4.234.582 &
As per manufacturers
recommendation
3.0
INSPECTIONS
100%
T.4.234.582 &
As per manufacturers
recommendation
3.1
Environmental
Conditions
1. Ambient temp.
Manufacturers
data sheet
3.2
Identification of repair
100%
T.4.234.582
T.4.234.582
QCI
GAM-QCR-QACGTL-166
W S
3.3
100%
T.4.234.582 - Procedure
for Building works &
Project Specification
Site Engineer
GAM-QCR-QACGTL-166
W S
T-4.318.708 Rev. A
Page 4
X. CONTRACTOR QC
C. COMPANY
I: INSPECTION / TEST
R: DOCUMENT ISSUED/REPORT REVIEW
S: SURVEILANCE
H: HOLD POINT (Notification Required and Presence Mandatory). W: WITNESS (Notification Required but Presence not Mandatory)
Item
Activity
3.4
3.5
Release to painting
3.6
In process inspection
of Painting system
3.7
Inspection of
intermediate coats &
minimum time between
the applications of
different coats.
T-4.318.708 Rev. A
Test Frequency
100%
100%
100%
a) Visual
Inspection
d) Adhesion
check
Reference Document
Acceptance Criteria
T.4.234.582 &
Manufacturers
recommendation
T.4.234.582 &
Manufacturers
recommendation
Manufacturers
recommendation
T.4.234.582 &
Manufacturers
recommendation
T.4.234.582 &
Manufacturers
recommendation
Responsible Party
Verifying Documents
QC Civil
Inspector
GAM-QCR-QACGTL-164
QC Civil
Inspector
GAM-QCR-QACGTL-164
W S
Manufacturers
recommendation
QC Civil
Inspector
GAM-QCR-QACGTL-164
W S
Manufacturers
recommendation
GAM-QCR-QACGTL-164
Page 5
X. CONTRACTOR QC
C. COMPANY
I: INSPECTION / TEST
R: DOCUMENT ISSUED/REPORT REVIEW
S: SURVEILANCE
H: HOLD POINT (Notification Required and Presence Mandatory). W: WITNESS (Notification Required but Presence not Mandatory)
Item
Activity
Test Frequency
100%
3.8
DFT Checking
3.9
Inspection of repair /
touch up of paintings
/coatings.
100%
3.10
100%
T-4.318.708 Rev. A
Reference Document
T.4.234.582 &
Manufacturers
recommendation
Acceptance Criteria
Responsible Party
Verifying Documents
W S
Manufacturers
recommendation
GAM-QCR-QACGTL-164
Manufacturers
recommendation
GAM.-QCR-QACGTL-164
W W
----
Visual confirmation
W W
Page 6
X. CONTRACTOR QC
C. COMPANY
I: INSPECTION / TEST
R: DOCUMENT ISSUED/REPORT REVIEW
S: SURVEILANCE
H: HOLD POINT (Notification Required and Presence Mandatory). W: WITNESS (Notification Required but Presence not Mandatory)
Item
Activity
3.11
T-4.318.708 Rev. A
Test Frequency
100%
Reference Document
T.13.377.450Construction waste
Management Procedure
Acceptance Criteria
Responsible Party
Verifying Documents
S S
Site Engineer
Visual
Page 7
Q
Q A
A T
T A
A R
R
Subcontract Ref.:
Item Description:
Item Location / Area:
Ref. DWG / Documents:
Report No :
Working Conditions
Internal /
External
Relative Humidity %
Ambient Temp. (C0)
Inspection Date:
Test Code No.:
ITP No.:
PAINT APPLICATION
From: ______________ hrs. To: _______________ hrs.
Painting Manufacturer:
Application
Methods
Area
Covered
M2
Product/Coat
Mix
Ratio
Remarks:
Paint:
ORGANIZATIONS
Accepted By
GAMA REP.
LINDE REP.
GAM-QCR-QAC-GTL-164, Rev-0
Colour
DATE
Primer
Coat
Status
NAME
I /II / III
Coat
Remarks
Status
SIGNATURE
GAM-ITP-QAC-GTL-
Rev.
Date :
Location Bldg/Area:
Drawing No:
Item
Details of Activity
Remarks
Signature
Date
GAM-QCR-QAC-GTL- 166
LINDE