Sei sulla pagina 1di 1

ENGINEERING PRACTICE LABORATORY

Window corner side broken glass not changed


Wooden cupboard door damage below work table)
Welding booth exhaust facility available

THERMAL LABORATORY -1

Trench closing, building side window rain water coming


All engines beds painting work
Computerized ic engine exhaust pipe line to out side
Hydraulic load diesel engine exhaust pipe line to out side
Morse test engine cylinder bore, piston change new
Computerized ic engine switch box need for computer
Lab entrance door need
Hydraulic load diesel engine dynamometer water leakage
Electrical loading petrol engine need exhaust facility, petrol tank, loading
devices

CNC LAB

Trench closing

SOM LAB
Single phase switch box need for utm machine old lab) (permanent)near by
machine

MT-1 LAB
Wall painting work
Lathe belt 2 nos

FM LAB
Verturi meter switch box broken
Form fitting 2 nos(new lab)
Front door above opening so if closed work

Potrebbero piacerti anche