Sei sulla pagina 1di 7

M/s. GREENESOL POWER SYSTEMS PVT.LTD.

,
BANGALORE

Date: 1/3/2011
Time: 11:28 AM

CT & PT SIZING CALCULATION

OWNER

M/s. SIMHAPURI ENERGRY PVT LTD

OWNER ENGINEER
EPC CONTRACTOR
ORGINATOR EPC
Project
SYSTEM DETAILS
Generator Rating
Generator Voltage

M/s. DEVELOPMENT CONSULTNATS PVT LTD

Ref.No.

2001/CTPT/01

Revision

07

Date

03.01.11

M/s. MADHUCON PROJECTS LTD


M/s. M.N. DASTUR & COMPANY (P) LTD
2 X 150 MW THERMAL POWER PLANT (PHASE -II)
150
:15.75KV

Generator PF
Generator FLC

0.8
KW

150000

3VCosF
Generator FLC
After 15% of Over ucrrent

6873.419114
7904.431981

(1.732*15.75*0.8)

150000

6873.419114

21.8232

Amps
Amps

Hence the Selected CT ratio will be 8000/5 Amps.


References :
1. AE Meter Catalogue
2. GE Manual
3. Auto synchroniser - Woodward manual
4. Single Line Diagram No. 2001010101, Revision-05
1. Generator Control Panel (GCP)
Sl.
No.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17

Description
Digital Ammeter
Digital Voltmeter
Digital Frequency Meter
Digital MW Meter
Digital MVA Meter
Digital MVAR Meter
Digital PF Meter
Double Voltmeter
Double Frequency Meter
MW Transducer
Multi Transducer
Synchroscope
Autosynchroniser
Check Synchronising Relay
No Volt Relays
PT Fuse failure relay
Cable Burden
Total Burden

CT Circuit (CT4 ) Neutral side Metering core.


Burden in VA
Qty
Total Burden in VA
1
1/phase
1
1
1
1
1
1
1
1
1
1
1
1
1
1
2
2
1
3
3
0.2955
2
0.591
10.591

PT Circuit (PT3: Core-1) Metering core


Burden in VA
Qty
Total Burden in VA
2
1
2
1
1
1
3
1
3
3
1
3
3
1
3
1
1
1
2
1
2
2
1
2
1
2
2
1
3
3
6
1
6
1
1
1
2.5
1
2.5
3
2
6
6.5
1
6.5
0.435
2
0.87
44.87

CT Circuit (CT:5 & 6) Phase side Metering Core


Burden in VA
Qty
Total Burden in VA
1
1
1
1
1
1
5
2
10
0.2955
2
0.591
12.591

PT Circuit (PT1&2: Core-1)


Burden in VA
Qty
Total Burden in VA
2
1
2
1
1
1
10
2
20
6.5
1
6.5
0.435
2
0.87
30.37

CT:(3.1-3.3 ) CT7:( 7.1-7.3 )Protection Core


Burden in VA
Qty
Total Burden in VA
3
1
3
0.2955
2
0.591

PT Circuit (PT3 : Core-2) Protection Core


Burden in VA
Qty
Total Burden in VA
3
1
3
6.5
1
6.5
0.435
2
0.87

2. AVR Panel
Sl.
Description
No.
1
2
3
4
5
6
7

Voltmeter
Ammeter
PF Meter
AVR Droop Ckt.
AVR Cards
PT Fuse failure relay
Cable Burden
Total Burden

3. Generator Relay Panel (GRP)


Sl.
Description
No.
1 Multifunctional Relay-1 (G60)
2 PT Fuse failure
3 Cable Burden

Page 1 of 7

M/s. GREENESOL POWER SYSTEMS PVT.LTD.,


BANGALORE

CT & PT SIZING CALCULATION

OWNER

M/s. SIMHAPURI ENERGRY PVT LTD

OWNER ENGINEER
EPC CONTRACTOR
ORGINATOR EPC
Total Burden

M/s. DEVELOPMENT CONSULTNATS PVT LTD

Date: 1/3/2011
Time: 11:28 AM
Ref.No.

2001/CTPT/01

Revision

07

Date

03.01.11

M/s. MADHUCON PROJECTS LTD


M/s. M.N. DASTUR & COMPANY (P) LTD

Sl.
Description
No.
1 Multifunctional Relay-2 (G60)
2 PT Fuse failure
3 Cable Burden
Total Burden
4. GT-Transformer Relay Panel (TRP)
Sl.
Description
No.
1 Multifunctional Relay-2 (T60)
2 Cable Burden
Total Burden
Sl.
Description
No.
1 Multifunctional Relay-1 (T60)
2 Cable Burden
Total Burden
5. TVM (MAIN & CHECK)
Sl.
Description
No.
1 Trivector Meter (Main & Check)
2 Cable Burden
Total Burden

3.591

10.37

CT :(2.1-2.3 ) CT8:( 8.1-8.3 ) Protection Core


Burden in VA
Qty
Total Burden in VA
3
1
3
0.2955
2
0.591
3.591

PT Circuit (PT3 : Core-2) Protection Core


Burden in VA
Qty
Total Burden in VA
3
1
3
6.5
1
6.5
0.435
2
0.87
10.37

CT:(19.1-19.3 ) Protection Core


Burden in VA
Qty
Total Burden in VA
3
1
3
0.2955
2
0.591
3.591

PT Circuit (PT : From GCB) Protection Core


Burden in VA
Qty
Total Burden in VA
3
1
3
0.435
2
0.87
3.87

CT :(20.1-20.3 ) Protection Core


Burden in VA
Qty
Total Burden in VA
3
1
3
0.2955
2
0.591
3.591

PT Circuit (PT : From GCB) Protection Core


Burden in VA
Qty
Total Burden in VA
3
1
3
0.435
2
0.87
3.87

CT Circuit (CT) - TVM


Qty
Total Burden in VA
1
1
2
0.591
1.591

PT Circuit (PT) - Metering core


Burden in VA
Qty
Total Burden in VA
3
1
3
0.435
2
0.87
3.87

Burden in VA
1
0.2955

Total Burden on Netural side CT4: (GCP METERING - Metering core)

10.591 VA

Total Burden on Netural side CT3: (GE-G60-1 - Protection core)

:PS Core Vk>=500V


Imag<30mA@Vk/2

Total Burden on Netural side CT2: (GE-G60-2 - Protection core)

:PS Core Vk>=500V


Imag<30mA@Vk/2

Total Burden on Netural side CT1: (Over all Differentaila - Protection core)

:PS Core Vk>=500V


Imag<30mA@Vk/2

Total Burden on Phase side CT5: (AVR Metering - Metering core)

12.591 VA

Total Burden on Phase side CT6: (AVR Sensing - Metering core)

12.591 VA

Total Burden on Phase side CT7: (GE-G60-1 - Protection core)

:PS Core Vk>=500V


Imag<30mA@Vk/2

Total Burden on Phase side CT8: (GE-G60-2 - Protection core)

:PS Core Vk>=500V


Imag<30mA@Vk/2

Total Burden on Phase side CT19: (GE-T60-2 - Protection core)

:PS Core Vk>=500V


Imag<30mA@Vk/2

Total Burden on Phase side CT20: (GE-T60-1 - Protection core)

:PS Core Vk>=500V


Imag<30mA@Vk/2

Hence, the selected CT & PT's are as below

Page 2 of 7

M/s. GREENESOL POWER SYSTEMS PVT.LTD.,


BANGALORE

CT & PT SIZING CALCULATION

OWNER

M/s. SIMHAPURI ENERGRY PVT LTD

OWNER ENGINEER
EPC CONTRACTOR
ORGINATOR EPC
Neutral Side CT's.
CT Ratio
:
Metering core :

M/s. DEVELOPMENT CONSULTNATS PVT LTD


M/s. MADHUCON PROJECTS LTD
M/s. M.N. DASTUR & COMPANY (P) LTD
8000/5A
(CT-4-Neutral side) GCP
CL : 0.2S,30 VA

CT Ratio
:
Protection core :

8000/5A
(CT-2-Neutral side) GE-60-2
CL : PS, Vk>=500V,Imag<30mA@vK/2

CT Ratio
:
Protection core

8000/5A
(CT-1-Neutral side) 87O Over All Differentail
CL : PS, Vk>=500V,Imag<30mA@vK/2

CT Ratio
:
Protection core

8000/5A
(CT-3-Neutral side) GE-60-1
CL : PS, Vk>=500V,Imag<30mA@vK/2

Phase Side CT's.


CT Ratio
:
Metering core

8000/5A
(CT-5-Phase side) AVR
CL : 0.2,30 VA

CT Ratio
:
Metering core :

8000/5A
(CT-6-Phase side) AVR Sensing
CL : 0.2,30 VA

CT Ratio
:
Protection core

8000/5A
(CT-7-Phase side) GE-60-1
CL : PS, Vk>=500V,Imag<30mA@vK/2

CT Ratio
:
Protection core

8000/5A
(CT-8-Phase side) GE-60-2
CL : PS, Vk>=500V,Imag<30mA@vK/2

CT Ratio
:
Protection core

8000/5A
(CT-19-Phase side) GE-T60-2
CL : PS, Vk>=500V,Imag<30mA@vK/2

CT Ratio
:
Protection core

8000/5A
(CT-20-Phase side) GE-T60-1
CL : PS, Vk>=500V,Imag<30mA@vK/2

PT's
PT Ratio
:
Metering core :
Protection core :

15.75kV/3 / 110V/3 / 110V/3


Core1 : CL : 0.2, 50VA To AVR Sensing
Core2 : CL : 3P, 100VA Spare Core

PT-1

PT Ratio
:
Metering core :
Protection core :

15.75kV/3 / 110V/3 / 110V/3


Core1 : CL : 0.2, 50 VA To AVR Metering
Core2 : CL : 3P, 100VA To GE-60-1

PT-2

PT Ratio
:
Metering core :
Protection core :

15.75kV/3 / 110V/3 / 110V/3


Core1 : CL : 0.2, 50 VA To GCPMetering
Core2 : CL : 3P, 100VA To GE-60-2

PT-3

Cable Burden
Cable lead resistance per km (2.5Sq mm)
Cable length between relay to Field
Cable burden

8.7 ohm/ km
50 meters Considered
I2*R
0.435 VA

Cable lead resistance per km (4.0 Sq MM)


5.91 ohm/ km
Cable length between relay to Field
50 meters Considered
I2*R
0.02955
VA
Cable burden

Page 3 of 7

Date: 1/3/2011
Time: 11:28 AM
Ref.No.

2001/CTPT/01

Revision

07

Date

03.01.11

M/s. GREENESOL POWER SYSTEMS PVT.LTD.,


BANGALORE

CT KNEE POINT VOLTAGE CALCULATIONS


FOR 8000A
OWNER

M/s. SIMHAPURI ENERGRY PVT LTD

OWNER ENGINEER
EPC CONTRACTOR
ORGINATOR EPC
ENGINEER
Project

M/s. DEVELOPMENT CONSULTNATS PVT LTD

Date: 1/3/2011
Time: 11:28 AM
Ref.No.

2001/CTPT/02

Revision

07

Date

03.01.11

M/s. MADHUCON PROJECTS LTD


M/s. M.N. DASTUR & COMPANY (P) LTD
2 X 150 MW THERMAL POWER PLANT (PHASE -II)

SYSTEM DETAILS
Generator Rating
Generator Voltage

:
:

Generator PF

0.8 Amps

Generator FLC

6873 Amps

Sub transient reactance


CT winding resistance
Primary CT current
Secondary CT current

150 MW
15.75 KV

Xd"

Rct

13.9 %
5 Ohms

8000 Amps

5 Amps

0.139 p.u.
considered

considered
100 meter 5.91 Ohms / KM

Resistance of conn. Leads


or Cable resistance

RL

0.591 ohms

Internal resistance of Relay

Rp

0.05 ohms

CT Knee point voltage

Vkp

If

MW/(root3xkVxPFxXd")

150MW/(root3x15.75kVx0.8x0.139)

=
If(sec) =
=

CT Knee point voltage

Vkp

=
=

2.If(sec).(Rct+RL+Rp)

49.45 KA
If(pri)/CT ratio
30.91 Amps
2x30.906x (5+0.591+0.05)
348.7 Volts

Page 4 of 7

at 90 Deg.C

M/s. GREENESOL POWER SYSTEMS PVT.LTD.,


BANGALORE

Date: 1/3/2011
Time: 11:28 AM

CT & PT SIZING CALCULATION


FOR 1500A
OWNER

M/s. SIMHAPURI ENERGRY PVT LTD

OWNER ENGINEER
EPC CONTRACTOR
ORGINATOR EPC
ENGINEER

M/s. DEVELOPMENT CONSULTNATS PVT LTD

Project

2 X 150 MW THERMAL POWER PLANT (PHASE -II)

Ref.No.

2001/CTPT/03

Revision

07

Date

03.01.11

M/s. MADHUCON PROJECTS LTD


M/s. M.N. DASTUR & COMPANY (P) LTD

SYSTEM DETAILS
UAT Rating
UAT Primary Voltage

31.5 MVA
15.75 KV

UAT primary rated


current

Generator FLC
After 15% of Over ucrrent

KVA

31500

3V
1154.734411
1327.944573

(1.732*15.75)

31500

1154.734411

27.279

Amps
Amps

Hence the Selected CT ratio 1500/1 Amps is suitable for the application.
References :
1. AE Meter Catalogue
2. GE Manual
3. Single Line Diagram No. 2001010101, Revision-04
1. UAT Protection & Relay Panel
CT Circuit (CT 11.1-11.3 &16.1-16.32 )
Burden in VA
Qty
Total Burden in VA
1
1/phase
1
1
1
1
1
3
3
0.2955
2
0.591
5.591

PT From GCB - Protection Core


Burden in VA
Qty
Total Burden in VA
1
1
1
1
1
1
0.435
2
0.87
2.87

Sl.
Description
No.
1 Multifunctional Relay-1 (T60)
2 Cable Burden
Total Burden

CT:(9.1-9.3 & 14.1-14.3 ) Protection Core


Burden in VA
Qty
Total Burden in VA
3
1
3
0.2955
2
0.591
3.591

PT From GCB - Protection Core


Burden in VA
Qty
Total Burden in VA
3
1
3
0.435
2
0.87
3.87

Sl.
Description
No.
1
Multifunctional Relay-2 (T60)
2 Cable Burden
Total Burden

CT:(10.1-10.3 & 15.1-15.3 ) Protection Core


Burden in VA
Qty
Total Burden in VA
3
1
3
0.2955
2
0.591
3.591

PT From GCB - Protection Core


Burden in VA
Qty
Total Burden in VA
3
1
3
0.435
2
0.87
3.87

3. TVM
Sl.
Description
No.
1 Trivector Meter (Main & Check)
2 Cable Burden
Total Burden

CT:(12.1-12.3 & 17.1-17.3 ) Metering Core


Burden in VA
Qty
Total Burden in VA
1
1
1
0.2955
2
0.591
1.591

PT From GCB - Protection Core


Burden in VA
Qty
Total Burden in VA
3
1
3
0.435
2
0.87
3.87

Sl.
No.
1
2
3
4

Description
Digital Ammeter
MW Transducer
Digital MW Meter
Cable Burden
Total Burden

2. Relay Panel (GRP)

Total Burden on UAT Primary side CT9&CT14 : (GE-T60-1 - Protection core)

:PS Core Vk>=500V


Imag<30mA@Vk/2

Total Burden on UAT Primary side CT10&CT15: (GE-T60-2 - Protection core)

:PS Core Vk>=500V


Imag<30mA@Vk/2

Total Burden on UAT Primary side CT11&CT16: (UAT METERING - Metering core)
5.87 VA
Total Burden on UAT Primary side CT12&CT17: (Metering core for TVM)

Page 5 of 7

1VA

M/s. GREENESOL POWER SYSTEMS PVT.LTD.,


BANGALORE
CT & PT SIZING CALCULATION
FOR 1500A
OWNER

M/s. SIMHAPURI ENERGRY PVT LTD

OWNER ENGINEER
EPC CONTRACTOR
ORGINATOR EPC
ENGINEER

M/s. DEVELOPMENT CONSULTNATS PVT LTD


M/s. MADHUCON PROJECTS LTD
M/s. M.N. DASTUR & COMPANY (P) LTD

Total Burden on UAT Primary side CT13&CT18: (Over all DifferentailProtection)

:PS Core Vk>=500V


Imag<30mA@Vk/2

Hence, the selected CT & PT's are as below


CT Ratio :
Protection core :

1500/1A
(CT-9-UAT Primary side) UAT-TRP-T60-1
CL : PS, Vk>=500V,Imag<30mA@vK/2

CT Ratio :
Protection core :

1500/1A
(CT-10-UAT Primary side) UAT-TRP-T60-2
CL : PS, Vk>=500V,Imag<30mA@vK/2

CT Ratio :
Metering core :

1500/1A
(CT-11-UAT Primary side) UAT-Metering
CL : 0.2S,30 VA

CT Ratio :
Metering core :

1500/1A
(CT-12-UAT Primary side) UAT-Metering (TVM)
CL : 0.2S,30 VA

CT Ratio :
Protection core :

1500/1A
(CT-13- 87O Over All Differentail-UAT Primary side)
CL : PS, Vk>=500V,Imag<30mA@vK/2

PT's
PT Ratio :
Metering core :
Metering core :

15.75kV/3 / 110V/3 / 110V/3


Core1 : CL : 0.2, 30VA To UAT Metering
Core2 : CL : 0.2, 30VA To Synch

PT From GCB

Cable Burden
Cable lead resistance per km (2.5Sq mm)
Cable length between relay to Field
Cable burden

8.7 ohm/ km
50 meters
Considered
0.435 VA

I2*R

Cable lead resistance per km (4.0 Sq MM)


Cable length between relay to Field
Cable burden

5.91 ohm/ km
50 meters
Considered
I2*R
0.02955
VA

Page 6 of 7

Date: 1/3/2011
Time: 11:28 AM
Ref.No.

2001/CTPT/03

Revision

07

Date

03.01.11

M/s. GREENESOL POWER SYSTEMS PVT.LTD.,


BANGALORE

CT KNEE POINT VOLTAGE CALCULATIONS


FOR 1500A
OWNER

M/s. SIMHAPURI ENERGRY PVT LTD

OWNER ENGINEER
EPC CONTRACTOR
ORGINATOR EPC
ENGINEER
Project

M/s. DEVELOPMENT CONSULTNATS PVT LTD

Date: 1/3/2011
Time: 11:28 AM
Ref.No.

2001/CTPT/04

Revision

07

Date

03.01.11

M/s. MADHUCON PROJECTS LTD


M/s. M.N. DASTUR & COMPANY (P) LTD
2 X 150 MW THERMAL POWER PLANT (PHASE -II)

SYSTEM DETAILS
Transformer Rating
Transformer HV Voltage

:
:

Primary Rated Current

Sub transient reactance


CT winding resistance
Primary CT current
Secondary CT current

31.5 MVA
15.75 KV
1154 Amps

Xd"

Rct

12.5 %
5 Ohms

1500 Amps

1 Amps

0.125 p.u.
considered

considered
100 meter 5.91 Ohms / KM

Resistance of conn. Leads


or Cable resistance

RL

0.591 ohms

Internal resistance of Relay

Rp

0.05 ohms

CT Knee point voltage

Vkp

If

MVA/(root3xkVxXd")

31.5MVA/(root3x15.75kVx0.125)

=
If(sec) =
=

CT Knee point voltage

Vkp

=
=

2.If(sec).(Rct+RL+Rp)

9.238 KA
If(pri)/CT ratio
6.159 Amps
2x30.906x (5+0.591+0.05)
69.48 Volts

Page 7 of 7

at 90 Deg.C

Potrebbero piacerti anche