Sei sulla pagina 1di 2

PCC/MCC FEEDER OPERATION CHECK LIST

Date:

Name of equipment

Equipment KKS Code

Upstream/Downstream Breaker KKS Code


No.

CHECKING LIST:S.no
1
2
3
4
5

Activity Description

Result

Remarks

Proper approach and house keeping


Ensure no PTW is pending on the equipment
Ensure no person is working on the
equipment
Ensure Equipment is not charged
Status of Upstream/Downstream Breaker . .Both
Upstream/Downstream breakers should be in OFF
Condition.

7
8
9
10

11
12
13

14
15
16
17
18.
19.

Measure the individual phase-earth insulation


resistance (with 500V/ insulation tester). All the
three reading shall be > 1.5 M.
Availability of Main power supply and control
supply
Ensure all logics and protections are in service
Remove permit and DO NOT OPERATE
board from the feeder.
Put LOCAL/OFF/REMOTE selector switch in
LOCAL or REMOTE position. As per operation
requirement
Rack in the breaker/ Feeder
Switch ON control power MCB
Ensure After switching ON DC control supply
ensure Relay is in healthy condition and Breaker
Spring is charged
Ensure OFF indication on feeder is glowing.
Give Clearance for Switch ON the feeder from
DCS/LOCAL for Upstream breaker.
After Switch ON Upstream breaker. Check the
Voltage in various phases and record
Check the noise or any other abnormality
Give Clearance for Switch ON the feeder from
DCS/LOCAL for breaker.
After Switch ON breaker. Check the Voltage
1

in various phases and record


Check the noise or any other abnormality

20.

Feeder Charging Time :


Parameter after Charging:S.No

Time

Voltage
R-Y

Y-B

Current (Amps)
R-B

Remarks
B

REMARKS: Entry of unauthorized person should be prohibited and caution board should be
placed.

Witnessed By

KSK Engineer

KPS Engineer

Potrebbero piacerti anche