OBRAS PRELIMINARES
LIMPIEZA DE TERRENO MANUAL
01.00.00
02.01.00
DESCRIP.
LARGO
ANCHO
# VECES
M2
MURO
236.36
1.00
1.00
TOTAL (m2)
236.36
236.36
DESCRIP.
LARGO
ANCHO
# VECES
M2
MURO
236.36
1.00
1.00
TOTAL (m2)
236.36
236.36
TRAZO Y REPLANTEO
02.01.00
02.02.00
MOVIMIENTO DE TIERRAS
02.02.01
ancho (m)
Long. (m)
altura (m)
# VECES
PARC. (m3)
0.60
236.36
1.80
1
Sub Total (m3)
255.27
255.27
# VECES
PARC. (m2)
141.82
141.82
02.02.01
MURO
DESCRIP.
MURO
LARGO
236.36
ANCHO
0.60
alt. (m)
02.02.03
DESCRIP.
muro
Anch0 (m)
0.6
Long. (m)
236.36
alt. (m)
0.6
# VECES
1
TOTAL (m3)
PARC. (m3)
85.09
# VECES
1
TOTAL (m3)
PARC. (m3)
28.36
85.09
02.02.04
DESCRIP.
muro
Anch0 (m)
0.6
Long. (m)
236.36
alt. (m)
0.2
28.36
02.02.05
DESCRIP.
MURO
Anch0 (m)
Long. (m)
alt. (m)
Coef.
PARC. (m3)
0.60
236.36
0.80
1.25
TOTAL (m3)
141.82
141.82
02.03.00
02.03.01
1)
02.04.00
02.04.01
02.04.01.01
SS.HH:
DESCRIP.
MURO
Ancho (m)
Long. (m)
Alto (m)
# VECES
PARC. (m3)
0.60
236.36
0.60
1
Total (m3)
85.09
85.09
Ancho (m)
Long. (m)
Alto (m)
# VECES
PARC. (m3)
0.25
236.36
0.40
23.64
Total (m3)
23.64
ESTRIBOS
Long. (m)
# Piezas
# Veces
PARC. (ml)
1/2"
236.36
4.00
Factor
1.02
1.00
Sub Total (ml)
Sub Total (Kg)
945.44
945.44
964.35
DESCRIP.
Eje 1
Eje 2
Eje 3
1/4"
1/4"
1/4"
Long. (m)
1.30
1.30
1.30
# Piezas
165
144
144
# Veces
1
1
1
PARC. (ml)
214.5
187.2
187.2
Factor
0.25
588.90
147.23
1111.57
PLANILLA DE METRADOS
02.04.02
02.04.02.01
02.04.02.02
02.04.02.03
COLUMNAS
CONCRETO F'c = 210 Kg/cm2
DESCRIP.
AREA (M2)
ALTO Prom.(m)
# Veces
PARC. (m3)
C1
0.0625
3.2
94
18.80
C2
C3
0.154
3.2
3.2
1
1
0.49
0.69
C4
C5
0.124
3.2
3.2
2
1
0.79
0.44
TOTAL (m3)
21.21
0.22
0.14
ENCOFRADO Y DESENCOFRADO
DESCRIP.
PERIM (M2)
ALTO Prom.(m)
# Veces
PARC. (m2)
C1
C2
C3
C4
C5
C6
1
1.721
2.217
1.5
1.591
1.8
2.3
2.3
2.3
2.3
2.3
2.3
94
1
1
2
1
1
216.20
3.96
5.10
6.90
3.66
4.14
TOTAL (m2)
239.96
MURO
DESCRIP.
Acero longitudinal
Long. (m)
# Piezas
# Veces
PARC. (ml)
Factor
PARC. (Kg)
C1
C2
C3
C4
C5
C6
Estribos
1/2"
1/2"
1/2"
1/2"
1/2"
1/2"
3.20
3.20
3.20
3.20
3.20
3.20
4
4
4
4
4
4
94
1
1
2
1
1
1203.2
12.8
12.8
25.6
12.8
12.8
1.02
1.02
0.58
1.02
0.58
0.58
1227.26
13.06
7.42
26.11
7.42
7.42
C1
C2
C3
C4
C5
C6
1/4"
1/4"
1/4"
1/4"
1/4"
1/4"
1
1.721
2.217
1.5
1.591
1.591
19
19
19
19
19
19
94
1
1
2
1
1
1786
32.699
42.123
57
30.229
30.229
0.25
0.25
0.25
0.25
0.25
0.25
446.50
8.17
10.53
14.25
7.56
7.56
Total (Kg)
1783.27
1.308
0.7
1
0.8
23.5
PLANILLA DE METRADOS
02.04.03
02.04.03.01
VIGAS
CONCRETO F'c = 210 Kg/cm2
DESCRIP.
V- Principal
02.04.03.02
b (m)
t (m)
LONG. (m)
0.25
0.25
236.36
Perm. (m)
0.75
LONG. (m)
# Veces
1
TOTAL (m3)
PARC. (m3)
14.77
14.77
ENCOFRADO Y DESENCOFRADO
2)
DESCRIP.
V- Principal
02.04.03.03
# Caras
2
236.36
# Veces
1
TOTAL (m2)
PARC. (m2)
354.54
354.54
Desc.
Long. (m)
N piezas
N
Vigas
Longit.
Estribos
1/2"
1/4"
236.36
1.00
4
19
1
209.06
Factor
Total (kg)
1.02
0.25
TOTAL (Kg)
964.35
993.04
1957.38
Area (CAD)
MUROS Y TABIQUES DE
ALBAILERIA
6.28
Long. (m)
Alto (m)
# VECES
PARC. (m2)
72
452.16
452.16
02.06.00
02.06.01
TIPO
1.00
2.00
UNIDAD
1
2
PARC
1.00
2.00
Sub Total
3.00