Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
Calculated by
AA
Checked and Approved by
MN
Client
Floor title
93
40
cm
-130
t.m
Instantanuous deflections
DL
8.9 mm
93
t.m
LL
5 years or more
-130
-130
0.97
20 %
80 %
Midspan
2.7 mm
MOMENT
(ton.m)
cm
cm
Bottom Reinforcement
32 @
12.5 +
32 @
Top Reinforcement
32 @
25 +
32 @
cm2
13 Asbot =
25 Astop =
Support
128.6
64.3
cm
32 @ 12.5 +
32 @
25 +
cm
cm2
32 @ 12.5 Asbot = 128.6
32 @
25 Astop =
64.3
cm2
Concrete cover
80
cm2
Section depth
d
f'c
76
32
cm2
Mpa
8.5.1
Ec
265.8721
ton/cm2
8.5.2
Es
n
2000
8
ton/cm2
Es/Ec
9.5.2.3 fr
'
35.0725
0.042307
0.021154
kg/cm2
Modulus of rupture
0.62f'c
Ig
At midspan
k
j
Icr
9.5.2.3 Mcr
9.5.2.3 Ie
Ie,average
Additional deflection
DL,long term
LL,long term Sustained
Total deflection
1706667
4700f'c
0.540695
0.819768
cm4
At support
0.42703
0.85766
[(n)2+2..n]-.n
1-k/3
2104100
14.96427
1373072 cm4
14.9643 t.m
n.As.(1-k).j.d2
(fr.Ig)/yt
2102444
1373580 cm4
Icr+(Mcr/Ma)3.(Ig-Icr)
1738012
cm4
mm
0.515396 + LL,Long term intermittent
22.7
mm
.(Ig/Ie).DL
8.494486
2.121 mm
Deflection
-2.7 (mm)
DL
-8.9
LL
Long term
-22.7
1.16
4
2.4
1.124
6.25
Frosch w
0.03
ton/cm2
cm
mm
M/(As.j.d)
dc-db/2
1+0.031.dc (cm)
380.(280/fs)-2.5.cc
2(fs/Es)..(dc2+(s/2)2)