Sei sulla pagina 1di 5

Job Number

Job Title
Software Consultants (Pty) Ltd
Internet: http://www.prokon.com
E-Mail : mail@prokon.com

Client
Calcs by

Sheet

KTP/26/14
THE CREEK
M/s KTP CONSULTANTS PTE LTD
Checked by
HT/LT
T&T

Continuous Beam: 19A-RB1-2

Job Number
Job Title

Date

Software Consultants (Pty) Ltd


Internet: http://www.prokon.com
E-Mail : mail@prokon.com

FEB 2015

(Code of Practice : CP65 - 1999)

3/3/2015 11:15:13 AM

C01

Client
Calcs by

35

Fy (MPa)

460

Fyv (MPa)

460

% Redistribution

Downward/Optimized redistr.

Cover to centre top steel(mm)

35

Cover to centre bot.steel(mm)

35

Dead Load Factor

1.4

Live Load Factor

1.6

Density of concrete (kN/m3)

24

% Live load permanent

(Creep coefficient)

Ecs (Free shrinkage strain)

300E-6

Sec
No.

Bw
(mm)

D
(mm)

200

450

Bf-top
(mm)

Hf-top
(mm)

Span
No

Section
Length(m)

Sec No
Left

Sec No
Right

3.8

Column Below
D(mm)

B(mm)

Case
D,L

Span

Wleft
(kN/m)

Wright
(kN/m)

15

15

15

Span

M left
(kNm)

M right
(kNm)

H(m)

a
(m)

450

200

Fcu (MPa)

Code
C,F

Date

Sections

Input Tables

Sup
No.

Sheet

KTP/26/14
THE CREEK
M/s KTP CONSULTANTS PTE LTD
Checked by
HT/LT
T&T

SECTION 1

Beam Elevation
SPAN 1

Live

Dead+
Own W

Bf-bot
(mm)

Code
F,P

b
(m)

Hf-bot
(mm)

Y-offset
(mm)

Web
offset

Flange
offset

Code
F,P

Column above
D(mm)

B(mm)

P
(kN)

a
(m)

15

18

1.9

1.9

H(m)

M
(kNm)

a
(m)

Load
Description

SPAN 2

3.00

3.00

17.16

18.00

FEB 2015

Job Number
Job Title
Software Consultants (Pty) Ltd
Internet: http://www.prokon.com
E-Mail : mail@prokon.com

Client
Calcs by

Sheet

KTP/26/14
THE CREEK
M/s KTP CONSULTANTS PTE LTD
Checked by
HT/LT
T&T

Job Number
Job Title

Date

Software Consultants (Pty) Ltd


Internet: http://www.prokon.com
E-Mail : mail@prokon.com

FEB 2015

Deflection, Shear, Moment and Steel diagrams. Spans 1,2

9.50

9.00

8.50

8.00

7.50

7.00

6.50

6.00

5.50

5.00

4.50

4.00

3.50

Def max = 4.375mm @ 2.75m


3.00

2.50

2.00

1.50

1.00

Calcs by

Sheet

Date

1.00
2.00
3.00

Title :
19A-RB1-2
Data File : C:\Users\T&TECLLP\Desktop\TOH TUCK\ROOF STY\19A-RB1-2.C01
Date/Time : 3/3/2015
Code of Practice : CP65 - 1999
=====================================================================
BENDING MOMENTS & REINFORCEMENT

4.00

SPAN 1

4.00
6.00
8.00
10.0
12.0
14.0

100

SHEAR: X-X

V max = -104.5kN @ 6.00m

9.50

9.00

8.50

8.00

7.50

7.00

6.50

6.00

5.50

5.00

4.50

4.00

3.50

3.00

2.50

2.00

1.50

1.00

.500

50.0

-50.0
-100
MOMENTS: X-X

M max = -107.9kNm @ 6.00m

-100

9.50

9.00

8.50

8.00

7.50

7.00

6.50

6.00

5.50

5.00

4.50

4.00

3.50

3.00

2.50

2.00

1.50

1.00

-50.0
.500

Position(m) Min.Moment(kNm) Max.Moment(kNm) As-top(mm2) As-bot(mm2)

9.50

9.00

8.50

8.00

7.50

7.00

6.50

6.00

5.50

5.00

Def max = 15.67mm @ 2.50m


4.50

4.00

3.50

3.00

2.50

2.00

1.50

1.00

.500

Long-term Deflections (All spans loaded - using entered reinforcement)


2.00

50.0

0.000
0.250
0.500
0.750
1.000
1.250
1.500
1.750
2.000
2.250
2.500
2.750
3.000
3.250
3.500
3.750
4.000
4.250
4.500
4.750
5.000
5.250
5.500
5.750
6.000

0.00
9.18
17.28
24.32
30.28
35.16
38.98
41.72
43.39
43.99
43.52
41.97
39.35
35.66
30.89
25.06
18.15
10.16
1.11
-9.02
-20.22
-37.64
-59.25
-82.66
-107.88

0.00
16.70
31.60
44.70
55.99
65.49
73.18
79.07
83.16
85.45
85.94
84.63
81.51
76.59
69.87
61.35
51.03
38.91
24.98
9.26
-8.27
-27.60
-45.83
-60.25
-75.74

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
57.15
128.13
238.58
379.03
543.50
732.74

0.00
105.85
200.28
283.29
356.88
421.90
475.71
517.64
547.13
563.78
567.34
557.75
535.17
499.90
452.44
393.40
323.48
246.60
158.35
58.67
0.00
0.00
0.00
0.00
0.00

SPAN 2
Shear Steel: X-X

Asv max = .2657mm/mm @ 5.00m

Position(m) Min.Moment(kNm) Max.Moment(kNm) As-top(mm2) As-bot(mm2)

.250
.200
.150

Bending Steel: X-X

9.50

9.00

8.50

8.00

7.50

7.00

6.50

6.00

5.50

5.00

4.50

4.00

3.50

3.00

2.50

2.00

1.50

1.00

.500

.100
.050

As max = -732.7mm2 @ 6.00m

-600

200
400

9.50

9.00

8.50

8.00

7.50

7.00

6.50

6.00

5.50

5.00

4.50

4.00

3.50

3.00

2.50

2.00

1.50

1.00

.500

-400
-200

FEB 2015

=====================================================================
C O N T I N U O U S B E A M
Ver W2.6.05 - 09 May 2014

Elastic Deflections (Alternate spans loaded)


.500

Client

KTP/26/14
THE CREEK
M/s KTP CONSULTANTS PTE LTD
Checked by
HT/LT
T&T

0.000
0.250
0.500
0.750
1.000
1.250
1.500
1.750
1.900
2.150
2.400
2.650
2.900
3.150
3.400
3.650

-107.88
-84.24
-65.06
-50.99
-38.00
-26.09
-15.24
-5.47
-0.12
3.43
5.91
7.32
7.66
6.93
5.12
2.24

-75.74
-54.22
-34.49
-16.57
-0.45
13.86
26.38
37.09
42.66
42.99
41.52
38.25
33.18
26.30
17.63
7.15

732.74
554.93
418.90
323.23
240.87
165.35
96.62
34.68
0.79
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
87.86
167.19
235.10
270.36
272.47
263.15
242.42
210.28
166.71
111.72
45.32

Job Number
Job Title
Software Consultants (Pty) Ltd
Internet: http://www.prokon.com
E-Mail : mail@prokon.com

3.800

Client
Calcs by

0.00

KTP/26/14
THE CREEK
M/s KTP CONSULTANTS PTE LTD
Checked by
HT/LT
T&T
0.00
0.00

Sheet

Job Number
Job Title

Date

FEB 2015

Software Consultants (Pty) Ltd


Internet: http://www.prokon.com
E-Mail : mail@prokon.com

Client
Calcs by

Sheet

KTP/26/14
THE CREEK
M/s KTP CONSULTANTS PTE LTD
Checked by
HT/LT
T&T

Date

0.00
COLUMN REACTIONS

--------------------------------------------------------------------Support

Dead Load(kN)

Live Load(kN)

Dead + Live(kN)

Ultimate(kN)

SHEAR FORCES & REINFORCEMENT


1
2
3

SPAN 1
Position(m)
0.000
0.250
0.500
0.750
1.000
1.250
1.500
1.750
2.000
2.250
2.500
2.750
3.000
3.250
3.500
3.750
4.000
4.250
4.500
4.750
5.000
5.250
5.500
5.750
6.000

Minimum
Shear(kN)
38.86
34.57
30.28
25.99
21.70
17.41
13.12
8.83
4.54
0.25
-4.04
-10.77
-17.98
-25.19
-32.39
-39.60
-46.80
-54.01
-61.22
-68.42
-75.63
-82.83
-90.04
-97.25
-104.45

Maximum
Shear(kN)
70.41
63.20
55.99
48.79
41.58
34.38
27.17
19.96
12.76
5.55
-1.65
-8.33
-12.62
-16.91
-21.20
-25.49
-29.78
-34.07
-38.36
-42.65
-46.94
-51.23
-55.52
-59.81
-64.10

Shear
Asv/Sv
Capacity(kN) (mm2/mm)
392.83
103.58
60.68
45.41
44.32
46.86
48.77
50.17
51.10
51.61
51.72
51.43
50.73
49.59
47.97
45.78
42.89
39.18
33.80
31.20
31.50
42.88
75.06
169.28
392.83

0.00
0.00
0.00
0.02
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.02
0.09
0.17
0.22
0.27
0.24
0.09
0.00
0.00

Asv/Sv(nom)
(mm2/mm)
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20

SPAN 2
Position(m)
0.000
0.250
0.500
0.750
1.000
1.250
1.500
1.750
1.900
1.900
2.150
2.400
2.650
2.900
3.150
3.400
3.650
3.800

40.77
120.70
24.69

7.13
21.01
4.25

47.90
141.72
28.95

70.41
202.61
49.83

--------------------------------------------------------------------COLUMN MOMENTS (Ultimate limit state)


Columns below
Support
No.
1
2
3

Bending Moment(kNm)
Min.
Max.
0.00
0.00
0.00

0.00
0.00
0.00

Shear Force (kN)


Min.
Max.
0.00
0.00
0.00

0.00
0.00
0.00

Columns above
Support
No.
1
2
3

Bending Moment(kNm)
Min.
Max.
0.00
0.00
0.00

0.00
0.00
0.00

Shear Force (kN)


Min.
Max.
0.00
0.00
0.00

0.00
0.00
0.00

--------------------------------------------------------------------ELASTIC DEFLECTIONS (Alternate spans loaded - positive downward)


Modulus of elasticity: Ec = 20 + fcu/5 = 27.0 Gpa
SPAN 1

Minimum
Shear(kN)
66.97
62.68
58.39
54.10
49.81
45.52
41.23
36.94
34.37
4.93
-2.27
-9.48
-16.69
-23.89
-31.10
-38.30
-45.51
-49.83

Maximum
Shear(kN)
98.15
90.95
83.74
76.54
69.33
62.12
54.92
47.71
43.39
16.37
12.08
7.79
3.50
-0.79
-5.08
-9.37
-13.66
-16.24

Shear
Asv/Sv
Capacity(kN) (mm2/mm)
392.83
170.46
77.60
47.45
38.87
34.29
34.42
38.56
40.40
40.40
40.51
40.04
38.96
37.15
43.91
64.74
172.63
392.83

0.00
0.00
0.04
0.18
0.18
0.17
0.12
0.06
0.02
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Asv/Sv(nom)
(mm2/mm)
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20

---------------------------------------------------------------------

Position(m)
0.000
0.250
0.500
0.750
1.000
1.250
1.500
1.750
2.000
2.250
2.500
2.750
3.000
3.000
3.250
3.500
3.750
4.000
4.250
4.500
4.750

Min.Deflection(mm)
0.00
0.52
1.02
1.48
1.91
2.30
2.64
2.93
3.15
3.32
3.42
3.44
3.38
3.38
3.23
3.02
2.74
2.43
2.08
1.72
1.35

Max.Deflection(mm)
0.00
0.65
1.27
1.86
2.40
2.89
3.32
3.69
3.98
4.20
4.34
4.38
4.32
4.32
4.16
3.91
3.58
3.20
2.77
2.33
1.87

FEB 2015

Job Number

Sheet

KTP/26/14
THE CREEK
Client
M/s KTP CONSULTANTS PTE LTD
Calcs by
Checked by
HT/LT
T&T
1.00
1.42
0.68
0.99
0.39
0.60
0.16
0.26
0.00
0.00

Job Number

Job Title
Software Consultants (Pty) Ltd
Internet: http://www.prokon.com
E-Mail : mail@prokon.com

5.000
5.250
5.500
5.750
6.000

Job Title

Date

FEB 2015

Software Consultants (Pty) Ltd


Internet: http://www.prokon.com
E-Mail : mail@prokon.com

4.750
5.000
5.250
5.500
5.750
6.000

Client
Calcs by

0.48
0.34
0.22
0.11
0.04
-0.00

KTP/26/14
THE CREEK
M/s KTP CONSULTANTS PTE LTD
Checked by
HT/LT
T&T
5.38
0.87
4.19
0.68
3.03
0.50
1.92
0.32
0.90
0.15
0.00
0.00

Sheet

Date

6.73
5.21
3.74
2.35
1.09
-0.00

SPAN 2
SPAN 2
Position(m)

Min.Deflection(mm)

Max.Deflection(mm)
Position(m)

0.000
0.250
0.500
0.750
1.000
1.250
1.500
1.750
1.900
1.900
2.150
2.400
2.650
2.900
3.150
3.400
3.650
3.800

0.00
-0.17
-0.26
-0.28
-0.25
-0.18
-0.09
-0.00
0.04
0.04
0.10
0.13
0.15
0.14
0.12
0.08
0.03
0.00

0.00
-0.08
-0.08
-0.03
0.06
0.18
0.29
0.40
0.44
0.44
0.49
0.49
0.46
0.40
0.31
0.20
0.08
0.00

0.000
0.250
0.500
0.750
1.000
1.250
1.500
1.750
1.900
1.900
2.150
2.400
2.650
2.900
3.150
3.400
3.650
3.800

DS(mm)

DL(mm)

DI(mm)

DT(mm)

0.00
-0.06
-0.08
-0.08
-0.06
-0.02
0.03
0.08
0.11
0.11
0.16
0.19
0.19
0.18
0.14
0.09
0.04
-0.00

0.00
-0.13
-0.13
-0.05
0.09
0.26
0.44
0.61
0.70
0.70
0.80
0.85
0.83
0.74
0.59
0.39
0.15
-0.00

0.00
-0.01
-0.01
0.00
0.02
0.05
0.08
0.10
0.12
0.12
0.13
0.14
0.14
0.12
0.10
0.06
0.02
-0.00

0.00
-0.20
-0.23
-0.13
0.05
0.28
0.54
0.79
0.93
0.93
1.09
1.17
1.16
1.04
0.83
0.55
0.21
-0.00

--------------------------------------------------------------------LONGTERM DEFLECTIONS (All spans loaded - positive downward)


Symbols: DS
DL
DI
DT

:
:
:
:

Shrinkage deflection.
Long-term deflection under permanent load.
Instantaneous deflection under short-term load.
Total long-term deflection.

SPAN 1
Position(m)
0.000
0.250
0.500
0.750
1.000
1.250
1.500
1.750
2.000
2.250
2.500
2.750
3.000
3.000
3.250
3.500
3.750
4.000
4.250
4.500

DS(mm)

DL(mm)

DI(mm)

DT(mm)

0.00
0.21
0.42
0.62
0.81
0.98
1.12
1.24
1.32
1.38
1.41
1.41
1.38
1.38
1.32
1.23
1.11
0.96
0.80
0.64

0.00
1.97
3.90
5.74
7.42
8.90
10.13
11.10
11.77
12.16
12.30
12.20
11.89
11.89
11.38
10.68
9.81
8.81
7.72
6.56

0.00
0.32
0.64
0.94
1.21
1.44
1.64
1.79
1.89
1.95
1.96
1.95
1.90
1.90
1.81
1.71
1.57
1.42
1.24
1.06

0.00
2.50
4.96
7.30
9.44
11.32
12.89
14.12
14.98
15.49
15.67
15.56
15.16
15.16
14.51
13.61
12.49
11.19
9.76
8.26

--------------------------------------------------------------------QUANTITIES
Section
1

Area(m)
0.090

Total weight of beam = 21.17 kN


=====================================================================

FEB 2015

Job Number
Job Title
Software Consultants (Pty) Ltd
Internet: http://www.prokon.com
E-Mail : mail@prokon.com

Client
Calcs by

Sheet

KTP/26/14
THE CREEK
M/s KTP CONSULTANTS PTE LTD
Checked by
HT/LT
T&T

Date

COLUMN REACTIONS
Support
1
2
3

Dead Load(kN)
40.77
120.70
24.69

Live Load(kN)
7.13
21.01
4.25

Dead + Live(kN)

Ultimate(kN)

47.90
141.72
28.95

70.41
202.61
49.83

--------------------------------------------------------------------COLUMN MOMENTS (Ultimate limit state)


Columns below
Support
No.
1
2
3

Bending Moment(kNm)
Min.
Max.
0.00
0.00
0.00

0.00
0.00
0.00

Shear Force (kN)


Min.
Max.
0.00
0.00
0.00

0.00
0.00
0.00

Columns above
Support
No.
1
2
3

Bending Moment(kNm)
Min.
Max.
0.00
0.00
0.00

0.00
0.00
0.00

Shear Force (kN)


Min.
Max.
0.00
0.00
0.00

0.00
0.00
0.00

---------------------------------------------------------------------

FEB 2015