Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
CADANGAN KERJA
0.167 hactre
Provide One (1) no. of On-site Detention Pond (OSD) for Each Lot
Region = Region 1, West Coast
% of Impervious area = 75%
Terrain = Mild
By using Table B1:-
78.746 (l/s)/ha
0.167 x
SSR =
=
448.541 m3/ha
0.167 x
78.746 =
=
13.151 l/s
0.0132 m3/s
73.119 (l/s)/ha
0.167 x
SSR =
=
439.597 m3/ha
0.167 x
Inlet flow =
=
220 (l/s)/ha
0.167 x
73.119 =
=
439.60 =
220 =
=
12.211 l/s
0.0122 m3/s
73.413 m3
36.740 l/s
0.0367 m3/s
171 mm diameter
70 mm diameter
1 - OSD
8.5 m
5.0 m
1.8 m
Length
Width
Depth
APPENDIX C
CADANGAN KERJA
76.5 m3
>
73.41
171 mm dia.
Spillway /Overflow
70 mm dia.
Outlet pipe
Outlet discharge;
From Chapter 20.6.1, Orifice method;
From Equation 20.2,
Orifice dia =
Qorifice
70
Ao =
Qorifice
mm dia. =
Cd =
Trial dimension:
0.52
post dev.-OSD(1)
0.00385 m
Ho =
0.23
0.0043
m3/s
Cd Ao Sqrt (2gHo)
0.070 m dia.
(orifice coeff. 0.42 - 0.62)
(area of orifice, m2)
(effective head, m)
14 x
=
2 - OSD
0.060 m3/s
0.0043
APPENDIX C
CADANGAN KERJA
3 - OSD
APPENDIX C
CADANGAN KERJA
0.054 hactre
Provide One (1) no. of On-site Detention Pond (OSD) for Each Lot
Region = Region 1, West Coast
% of Impervious area = 75%
Terrain = Mild
By using Table B1:-
PSD =
=
78.746 (l/s)/ha
0.054 x
SSR =
=
448.541 m3/ha
0.054 x
78.746 =
=
448.541 =
73.119 (l/s)/ha
0.054 x
SSR =
=
439.597 m3/ha
0.054 x
Inlet flow =
=
220 (l/s)/ha
0.054 x
73.119 =
=
439.60 =
220 =
=
171 mm diameter
70 mm diameter
4 - OSD
5.0 m
3.5 m
1.5 m
APPENDIX C
CADANGAN KERJA
m3
OK
26.25 m3
1.8 m
171 mm dia.
Spillway /Overflow
70 mm dia.
Outlet pipe
Outlet discharge;
From Chapter 20.6.1, Orifice method;
From Equation 20.2,
Orifice dia =
Qorifice
70
Cd =
Trial dimension:
Ao =
Qorifice
0.060
m3/s
5 - OSD
post dev.-OSD(2)
Cd Ao
mm dia. =
0.52
0.00385 m
Ho =
0.23
0.0043
m3/s
8 x
=
0.034 m3/s
APPENDIX C
CADANGAN KERJA
6 - OSD
APPENDIX C
CADANGAN KERJA
Lot area =
0.1093
PSD =
=
78.746
0.109
SSR =
=
448.541
0.109
3.948 l/s
0.0039 m3/s
23.738 m3
11.880 l/s
0.0119 m3/s
PSD =
=
73.119
0.109
SSR =
=
439.597
0.109
Inlet flow =
=
220
0.109
Length
Width
Depth
7 - OSD
APPENDIX C
CADANGAN KERJA
>
23.74 m3
OK
Inlet pipe or
Incoming drain
7.5
1.5 m
171 mm dia.
Spillway /Overflow
70 mm dia.
Outlet pipe
Outlet discharge;
From Chapter 20.6.1, Orifice method;
Cd Ao Sqrt (2gHo)
0.070 m dia.
Orifice dia =
Trial dimension:
(area of orifice, m )
2
(effective head, m)
Qorifice
0.0043
0.034
m3/s
m3/s
8 - OSD
post dev.-OSD(2)
APPENDIX C
CADANGAN KERJA
TOTAL
9 - OSD
post dev.-OSD(1)+(2)+(3)
APPENDIX C
(SURAU)
78.746 =
=
m3/ha
8.607 l/s
0.0086 m3/s
2 (Kuala Lumpur):(l/s)/ha
x
73.119 =
=
7.992 l/s
0.0080 m3/s
m3/ha
x
439.60 =
48.048 m3
(l/s)/ha
x
220 =
=
24.046 l/s
0.0240 m3/s
48.048 m3
171 mm diameter
70 mm diameter
7.5 m
4.5 m
1.5 m
Length
Width
Depth
10 - OSD
APPENDIX C
50.63 m3
>
48.05 m3
OK
Inlet pipe or
Incoming drain
1.5 m
Outlet pipe
post dev.-OSD(2)
mm dia. =
0.52
0.00385 m
Ho =
0.23
0.0043
m3/s
Cd Ao Sqrt (2gHo)
1
=
0.070 m dia.
(orifice coeff. 0.42 - 0.62)
(area of orifice, m2)
(effective head, m)
0.0043
0.004 m3/s
11 - OSD
0.004 m3/s
APPENDIX C
post dev.-OSD(1)+(2)+(3)
0.098 m3/s
12 - OSD