PLANT COST
1 EXCAVATOR
Unit
Rate
Quantity
Factor (x)
day
600.00
2.00
150
day
day
70.00
130.00
5.00
2.00
150
150
Total Material
LABOUR:
2 Unskilled
3 Operator
Total Labour
Total Material
Total Labour
Total Cost
Profit & Attendance 15%
Grand Total
870.14
41.63
36,223.93
Updated:2015
Basic
4.00
Day
/m2
Amount
24.00
24.00
0.47
0.87
/m2
/m2
3
3
7.00
5.20
12.20
24.00
12.20
36.20
5.43
41.63