QUOTATION FOR SOIL INVESTIGATION OF COUNCIL BUILDING IN KILOMBERO DISTRICT

ITEM

DESCRIPTION

UNIT QTY

1.0 PRELIMINARIES
1.1 Allow for mobilization and demobilization of all plants,
equipment, tools and workmen to and from the zone.

RATE (TZS)

Lumpsum

6,000,000.00

1,050,000.00

AMOUNT (TZS)

8,730,000.00

See Break-down below


(i) Transport
Transport to and from site; truck hire costs and other alike
charges within site (TZS 6,000,000.00)
(ii) Allowances
3 - Drillers/Excavation at 75,000/= x 14 days =1,050,000/=
1 -Site Supervisor at 120,000/= x 14 days = 1,680,000/=

1
1,680,000.00
BILL NO. 1 TOTAL CARRIED TO SUMMARY

2.0 FIELD WORK - BUILDING AND ROAD WORKS


2.1 Drilling through Soils from 0 - 10m
2.2 Trial pits from 0 - 10m
2.3 Collection of disturbed samples
2.4 Collection of Undisturbed Sample (U4) @ 2.0m depth
2.5 SPT (Standard Penetration Tests) @ 1.5m

3.0 LABORATORY WORKS


3.1 Soil Classification Tests
(a) Sieve analysis
(b) Water content (wc)
(d) Atteberg limit
3.2 Strength and Deformation Tests
(a) Bulk density
(b) Triaxial compression test
(c) Consolidation test

4
5

4.0 TECHNICAL REPORT


BILL NO. 4 TOTAL CARRIED TO SUMMARY
BILLS SUMMARY
BILL No. 1
BILL No. 2
BILL No. 3
BILL No. 4

m
m
No

150,000.00
150,000.00
75,000.00

4,500,000.00
900,000.00
1,125,000.00

No
15
150,000.00
No
20
75,000.00
BILL NO.2 TOTAL CARRIED TO SUMMARY

2,250,000.00
1,500,000.00
10,275,000.00

No
No
No

30
6
15

8,730,000.00

45,000.00
45,000.00
45,000.00

675,000.00
675,000.00
540,000.00

No
12
45,000.00
No
12
95,000.00
No
12
95,000.00
BILL NO. 3 TOTAL CARRIED TO SUMMARY

540,000.00
1,140,000.00
1,140,000.00
4,710,000.00

LS

15
15
12

6,500,000.00

TOTAL (VAT EXCLUSIVE)

6,500,000.00
6,500,000.00
8,730,000.00
10,275,000.00
4,710,000.00
6,500,000.00
30,215,000.00

Mode of Payments
30% Advance Payment

###

50% On Submission of Draft report

###

20% On submission of Final report

###

Grand Total

###