Item
S. No.
1
Land
Land
At Grade= 9 No.s
Unit
Qty.
Rate
(Rs . Cr)
Amount
(Rs.Cr.)
1000M2
150000
0.5
75.00
75.00
RKM
60.382
7.20
434.75
RM
no
Each
100 M2
1583
2
2
9000
0.14
15.00
2.89
0.30
221.62
30.00
5.78
27.00
719.15
Each
each
6
6
5.00
1.00
30.00
6.00
36.00
Route. Km.
Km.
Km.
61.77
3.3
6.0
3.58
2.82
2.82
221.14
9.31
16.92
247.36
5.00
5.00
2.2
2.3
2.4
2.5
8
8.1
8.2
Bridge Extension
Construction of new ROB
Provision of Box under ROB ( 25 MX 12 M)
Structure replacement / new
Sub Total (2)
Station Buildings
Civil Works
E & M works
Sub Total (3)
P-Way
Ballasted track for At-grade
Ballasted track for stabling siding
Ballasted track for Goods shed & sidings
Sub total (4)
Construction of new goods shed at Boisar
Sub total (5)
Traction & power supply incl. OHE, ASS etc.
Section
Power augmentation at three sub station
General Services
Sub total (6)
Signalling and Telecom.
Sig. & Telecom.
Sub Total (7)
Utilities
OHE modifications
Modification of Signal and Telecommnications
8.3
3
3.1
3.2
4
4.1
4.2
4.3
5
6
6.1
6.2
6.3
7
7.1
9
9.1
9.2
10
5.00
LS
R.Km.
each
LS
61.77
3.00
9.42
15.00
581.87
45.00
25.00
651.87
Route. Km.
61.77
3.50
216.20
216.20
LS
LS
20.00
20.00
LS
5.00
R. Km.
61.77
1.80
50.00
6.00
56.00
2087.77
41.76
111.19
156.19
125.27
2254.79
Each
216
4.00
864.00
3118.79
3193.79
159.69
3353.48