Foreign Suitors for Iraqi Oilfield Contracts
2s of March 2001
Discussions. PSC.
Blocks 6&7 Collecting data
sala uP Haltays Discussions. PSC.
Block 6 Collected data.
Belgium Petrorina Abdab TechnicaV/economie sudies (China's CNPC awarded PSC),
Block 2 Collecied data.
Canada Ranger Block 6, other Signed MOU with Baghdad,
Bow Canada——Khurmala Joint proposal wiCzech Republics Strojexport
Hama ont proposal w/Czech Republics Strojexport
Alberta Energy Unidentified None
CanOay Ratawi Discussions. PSC.
Block 5 Collecied data.
Chauveo Res. Ayn Zalah ‘Advanced talks by ate 1996. Service contact for advanced oil
recovery (ga injection projet) in tus aging field
Fcondido Ravan Discneions. PSC.
Block 5 Collecting data.
Talisman Hamrin, E Baghdad Service contract negotiations October 1999.
ire Nanin Discussions. Service const.
PanCanodian Unidentified None
China cre: AAbdab Production Sharing Contact (PSC) signed June 1997,
Halfaya Bid for $4 ha, 23-year PSC
Lshais & Subba Discussions. Service contrat.
Block 5 Collected data, discussions
NNovineo Ahdab PSC sigoed June 1997 (CNPC consortium parte)
Rafidain Discussions. PSC.
Sinochem Rafidain Discussions. PSC.
Carch Repeblic Strojexport Hann Joint project with Bow Canada. Sent team to lag in Sept 1997,
Khurrala Joint project with Bow Canada
Finland Neste Oy Unidentieg None!
France Total El Aquitaine Majnoon PSC "agreed in principle” January 1997.
Forasol SA" Saddam Feasibility study presented to Baghdad in 1997, update in 1998.
IBEX Hamsin Technical discussions.
Perenzo Ratdain Discussions. PSC.
Total Ef Aquitine Nabe Une PSC “agreed in principle” January 1997.
Germany Deminex Block 1 Collected data.
Preussag luda TechnicaVeconomie sndies (China's CNPC later awarded PSC).
Block 2 Collected data
Slavnett 1 Romaylab | Subeontrator to Lukeil consortium,
Grecee Ket Gharat Discussions. PSC.
Hungary Hanpewro Block Collected data
India oncic Tuba ‘Advanced contract talks in October 1999 (ONGC clea least four
‘ween Tuba inthe 19805). PSC
Haltya Discussions. PSC.
Block & Collected data,
Reliance Tuba Discussions
Indonesia Penamina Tuba Finalized discussions for » PSC in late 1997
lock 3 Collected data
Ireland Bota lock 4 Discussions
aly gin Nastya PSC initialed Ape 97. $2 ba, 23-year project (w/partner Repsol)
“Turkey gas pipeline Diseussions.
Block Collected daa, uiscussions
Saunprogets —Lahais Subba Discussions. Service contract
35AS0713
DoCo44-0007