Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
OFERTA REGISTRADA
INDIVIDUAL O AGRUPADA
PROMOTOR
APELLIDO
PATERNO
MATER
NO
SECTOR
NOMBRE(S)
CENTRAL
R
PROTOTIPO
UF
M
E
TX X
P
DX
MX
No. VIVS
A
R
A
B) CONSTRUCCIN EN TERRENO PROPIO, INDIVIDUAL DISPERSA O AMPLIACIN REPARACION
O MEJORA
C
I
x
CONST IND. DISPERSA
REPARACION
AMPLIACION
N
No. NIVELES
MEJORA
No. NIVELES
DERECHOHABIENTE
APELLIDO PATERNO
MATERNO
NOMBRE(S)
CONTRUCTOR
N. REG.
N. REG.
(*) En ampliacin, reparacin o mejora slo si involucra la afectacin o ejecucin de elementos estructurales en la vivienda.
ESTADO
CODIGO POSTAL:
DELEGACION O MUNICIPIO:
IMPORTE
PORCENTAJE
URBANIZACIN INTERNA
0.00
0.00
II
INFRAESTRUCTURA INTERNA
0.00
0.00
$0.00
0.00
EDIFICACIN
1. PERMISOS Y LICENCIAS
0.00
0.00
665.63
0.18
3. CIMENTACIN
81,917.84
22.06
4. ESTRUCTURA DE CONCRETO
47,548.79
12.81
5. ALBAILERIA
71,492.07
19.26
44,252.22
11.92
7. INSTALACIN HIDROSANITARIA
41,993.49
11.31
8. INSTALACINES ELECTRICA
21,849.35
5.89
9. INSTALACIONES ESPECIALES
6,529.95
1.76
4,918.98
1.32
9,360.88
2.52
12. CARPINTERIA
2,393.42
0.64
24,994.85
6.73
3,907.85
1.05
0.00
0.00
0.00
0.00
17. OTROS
0.00
0.00
$361,825.32
97.46
6,981.50
1.88
2,453.65
0.66
$371,260.47
100.00
SUBTOTAL
TOTAL
ELABORA:
ACEPTA:
UNIDAD CANTIDAD
P.U.
COSTO
URBANIZACION INTERNA
NO APLICA
SUBTOTAL DE PARTIDA
II
INFRAESTRUCTURA INTERNA
NO APLICA
SUBTOTAL DE PARTIDA
SUBTOTAL I Y II
III
EDIFICACION
1
PERMISOS Y LICENCIAS
0.00
0.00
PRELIMINARES
M2
100.40
6.63
665.63
SUBTOTAL DE PRELIMINARES
665.63
CIMENTACION
3.1
M3
51.89
24.79
1,286.57
3.2
M3
70.05
71.49
5,007.87
M2
172.98
10.66
1,843.76
M3
139.58
212.37
29,641.98
3.5
M3
8.41
139.08
1,170.04
3.6
M3
5.92
57.95
342.83
3.7
TON
0.349
17060.57
5,949.87
3.8
TON
0.056
23685.50
1,326.39
3.9
M2
100.4
40.72
4,087.94
M2
27.24
201.54
5,489.85
3.3
3.10
3.11
M3
14.5
1572.87
22,806.67
3.12
M3
1.79
94.27
168.93
3.13
M2
105
8.00
840.00
3.14
M2
100.4
19.47
1,955.15
81,917.84
SUBTOTAL DE CIMENTACION
ESTRUCTURA DE CONCRETO
4.1
M2
75.74
153.09
11,595.19
4.2
M2
25.72
122.63
3,154.27
4.3
TON
0.087
23685.50
2,072.01
4.4
TON
0.668
18352.36
12,266.72
4.5
TON
0.120
17079.35
2,043.37
4.6
M3
9.5
1572.87
14,942.30
4.7
M2
75.74
19.47
1,474.93
47,548.79
ALBAILERIA
5.1
78
210.29
16,402.39
5.2
M2
165.5
221.29
36,622.99
5.3
M2
106.3
128.63
13,673.39
ML
56.91
50.14
2,853.40
5.5
PZA
1939.90
1,939.90
71,492.07
ACABADOS INTERIORES
6.1
M2
74
238.37
17,639.60
6.2
M2
20
242.28
4,845.69
6.3
M2
68.87
85.32
5,876.23
6.4
M2
130.95
75.98
9,949.03
6.5
ML
108.65
43.91
4,771.28
6.6
M2
1.5
244.48
366.72
6.7
M2
20.00
40.18
803.67
44,252.22
INSTALACION HIDROSANITARIA
7.1
SAL
2013.09
12,078.55
7.2
SAL
961.55
5,769.30
7.3
JGO
3208.90
3,208.90
7.4
PZA
573.28
573.28
7.5
PZA
499.50
499.50
PZA
1497.36
1,497.36
7.7
PZA
1895.01
1,895.01
7.8
0.00
0.00
7.9
JGO
833.35
833.35
7.10
PZA
3528.05
3,528.05
7.11
PZA
1124.89
3,374.66
7.12
ML
18
90.13
1,622.35
7.13
PZA
679.88
679.88
7.14
ML
12
132.69
1,592.29
7.15
ML
24
142.68
3,424.28
7.16
PZA
179.82
359.65
7.17
PZA
1057.07
1,057.07
41,993.49
INSTALACION ELECTRICA
8.1
SAL
13
508.26
6,607.43
8.2
SAL
14
504.23
7,059.29
8.3
SAL
504.23
3,529.64
8.4
SAL
304.63
609.26
8.5
PZA
1449.86
1,449.86
8.6
PZA
654.98
654.98
8.7
PZA
96.55
289.64
8.8
SAL
374.09
374.09
LOTE
1275.15
1,275.15
21,849.35
8.9
INSTALACIONES ESPECIALES
9.2
SAL
1632.49
6,529.95
10
6,529.95
ACABADOS EN AZOTEA
10.1
M3
1.71
370.85
633.60
10.2
M2
34.17
72.91
2,491.20
10.3
38.3
46.85
1,794.18
4,918.98
11
11.1
IMPERMEABILIZACION EN AZOTEA
IMPERMEABILIZACION DE AZOTEA CON
IMPERMEABILIZANTE PREFABRICADO DE 3.5 MM
APLICADO CON SOPLETE. INCLUYE: MATERIALES, MANO
DE OBRA Y DESPERDICIOS.
M2
87.23
107.31
9,360.88
12
12.1
CARPINTERIA
PUERTA DE BAO DE 0.75 X 2.10 M CON BASTIDOR DE
MADERA DE PINO DE 38 X 25 MM A CADA 30 CM EN
AMBOS SENTIDOS FORRADA CON TRIPLAY DE CAOBILLA
DE 6 MM AMBAS CARAS ACABADO BARNIZADO Y
ENTINTADO CON CHAPA
PZA
2393.42
2,393.42
2,393.42
SUBTOTAL DE CARPINTERIA
13
9,360.88
HERRERIA Y VENTANERIA
13.1
PZA
13.2
PZA
13.3
1824.13
0.00
4782.48
9,564.95
PZA
2083.18
4,166.37
PZA
6105.31
6,105.31
13.5
PZA
3704.55
3,704.55
PZA
1453.67
1,453.67
PZA
9315.00
0.00
PZA
3105.00
0.00
24,994.85
14
LIMPIEZAS
14.1
14.2
M2
M2
75.74
172.8
4.63
14.53
350.37
2,510.42
14.3
M2
75.74
13.82
1,047.06
3,907.85
SUBTOTAL DE LIMPIEZAS
361,825.32
SUBTOTAL EDIFICACIN
15 FIANZAS
15.1 FIANZAS Y ENDOSOS
LOTE
6981.50
6,981.50
6,981.50
LOTE
2453.65
2,453.65
2,453.65
SUBTOTAL DE FIANZAS
16 SEGUROS
16.1 SEGURO
SUBTOTAL DE SEGUROS
371,260.47
ELABORA
ACEPTA
DERECHOHABIENTE
1134.71
789.1