Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
ZTE university
Training goals
To master different types of handover
and their signaling flows;
To master handover statistical signaling
point and MR tasks;
To know common handover problems
and the handling procedures.
Contents
Overview of handover
Flow of handover signaling
Handover statistics
Handover problem analysis
Aims of handovers
Why there are handovers?
Handover classification
Intra-cell
Inter-MSC
Handover
classification
Inter-BSC
Intra-BSC
Contents
Overview of handover
Flow of handover signaling
Handover statistics
Handover problem analysis
Intra-cell handover
Air
BTS
BSC
TC
A ir
A
BTS
BSC
TC
BTS
O ld C e ll / B T S
N e w C e ll / B T S
Inter-BSC handover
N e w C e ll / B T S
A ir
B SC
BTS
TC
M SC
BTS
O ld C e ll / B T S
B SC
TC
VLR
Inter-MSC handover
N e w C e ll / B T S
A ir
BSC
BTS
BTS
O ld C e ll / B T S
B SC
TC
TC
M SC
M SC
VLR
VLR
BSS-B/MS
MSC-A
A-HO-REQUIRED
MSC-B
MAP-Prep-Handover req.
VLR-B
MAP-Allocate-Handover-Number req.
MAP-Send-Handover-Report req.
MAP-Send-Handover-Report resp.
A-HO-REQUEST
MAP-Prep-Handover resp.
A-HO-REQUEST-ACK
IAM
A-HO-COMMAND
A-CLR-CMD/COM
ACM
MAP-Process-Access-Sig req.
A-HO-DETECT
MAP-Send-End-Signal req.
A-HO-COMPLETE
ANSWER
End of call
RELEASE
MAP-Send-End-Signal resp.
BSS-A/MS
MSC-A
MSC-B
MAP-Prep-Sub-Handover req.
VLR-B
A-HO-REQUIRED
A-HO-REQUEST
A-HO-REQUEST-ACK
MAP-Prep-Sub-Handover resp.
A-HO-COMMAND
MAP-Send-End-Signal resp.
A-CLR-CMD/COM
A-HO-DETECT
A-HO-COMPLETE
Release
MSC-B
VLR-B
VLR-B
A-HO-REQUIRED
MAP-Prep-Sub-Handover req.
MAP-Prepare-Handover req.
MAP-Allocate-Handover-Number req.
MAP-Prepare-Handover resp.
MAP-Send-Handover-Report req.
IAM
MAP-Send-Handover-Rep. resp. (1)
ACM
MAP-Prep-Sub-Ho resp.
A-HO-COMMAND
A-HO-DETECT
MAP-Process-Access-Signalling req.
A-HO-COMPLETE
MAP-Send-End-Signal req.
Answer
Release
MAP-Send-End-Signal resp.
A-CLR-CMD/COM
(end of call)
Release
MAP-Send-End-Signal resp.
Inter-BSC handover
within MSC
BSC reports CGI and handover cause of original cell and target cell to
MSC through HO-Request;
After MSC finds target cell LAC, it sends HO-Request to the BSC
which the target cell belongs to;
Target BSC activates channel in target cell, and executes the
following flow.
MSC sends Prepare-HO message to the target MSCB according to the route address;
According to the Prepare-HO message, target MSCB requests for Handover number from VLR-B, then sends
HO-Request message to BSC-B;
After the target BSC-B receives HO-Request ACK, it
sends Prepare-HO ACK message to the original
MSC, and executes the following flow.
InterInterBSC
BSC
handove
handove
rr
IntraIntraBSC
BSC
handove
handove
rr
MSC
UL MR
Intra-MSC
handover
Confirmation of
adjacent cell CGI
Execution of
handover decision
Selection of
target cell
External cell?
No
Channel activation
Yes
Target MSC
HO request
Process of MR
Target BSC
HO request
BA2 sheet
BSC
HO request
BCCH
frequency
point, BSIC
and level
values of
the six
adjacent
cells (with
strongest
level) and
serving cell;
BTS
List of cells
under one LAC
T3103
T8
T7
Contents
Overview of handover
Flow of handover signaling
Handover statistics
Handover problem analysis
Information contained in MR
UL MR
1. DL DTX performance
2. UL receive level/quality
3. BS Power
4. MS power level
5. TA
6. DL dynamic power control
DL MR
1.
UL DTX performance
2.
DL receive level/quality
3.
Adjacent cell level
4.
UL dynamic power control
MR cycle
26 multiframes of 4
TCHs
480ms
12TCH
1SACCH
12TCH
1 idle
Indicator
definition
C900060098
C900060102
C900060120
C900060097
C900060094
C900060097
C900060213
C900060214
C900060215
C900060099
C900060101
Execution of queuing
C900060100
C900060119
C900060216
C900060095
C900060093
Common
handover
measurement
Measurement
of adjacent cell
handover
Subcell
statistical
measurement
Contents
Overview of handover
Flow of handover signaling
Handover statistics
Handover problem analysis
Possible influences
Handover
nonoccurance
Handover failure
Frequent handover
Handover hysteresis
Traffic statistics
analysis
Customer complaints
Abnormal
Abnormalnumber
numberof
ofhandover
handovertimes
times
Call
Calldrop
drop
Bad
Badcoverage
coverage
DT/CQT tests
Poor
Poorspeech
speechquality
quality
Handover
Handoverproblem
problem
Meters at A interface
Slow handover
No handover
Handover failure
Frequent handover
Interference checking
DT analysis
Signaling analysis: Um interface Abis interface A
interface;
Hardware checking: like DCU, transceiver, clock generator,
RF connection lines between boards;
Antenna system checking
Coverage:
Interference:
Non-adjacent
cell
adjacent cell N1
Serving cell
Non-adjacent
cell
adjacent cell N2
Skip-zone
coverage leads to
isolated island.
Non-adjacent
Adjacent cell N3
cell
BTS software/hardware
Transmission fault
Unstable transmission
Too high transmission error rate
A interface malfunction
malfunction description:
Performance indicators at OMCR show that handover
success rate of Cell 2 (3carriers) in the flood prevention
center is lower, and number of handover cause of DL
interference is higher.
Problem description:
Problem analysis
From inspection of the calls with Assignment Failure
problem, its discovered that the problem is caused by intracell handover (assignment flow is adopted in intra-cell
handover), as shown in the figure:
Problem checking
Exchange BCCH frequency point with that of TCH;
Through observation of signaling statistics, its discovered
that the original BCCH carrier still suffers from problem, which
the original TCH carrier is still in normal condition;
Eliminate frequency interference;
Confirm that the problem is caused by high DL error rate due
to malfunction of BCCH carrier.
Problem handling
Change the carrier with fault, number of times of handover
caused by DL interference reduces greatly, and the cells
handover success rate increases a lot.
Problem description:
Problem description
Problem analysis
Problem analysis
Problem description
Problem analysis
Observe settings of other suppliers OMCR parameters, we
discover that each adjacent cell has its own property;
The max transmission power of the cell with problem is set
as 5dBm.
Problem handling
The problem is solved after the value is changed to 33dBm.
Handover success rates of ZTE and other suppliers
equipment are all improve to normal level.
Problem description
During DT at a BTS, we find slow handover problem is
common (>10S), which affects speech quality and even causes
call drops.
Problem: level of cell 2 is higher than that of cell 3 by 20dB,
total handover time is 15s.
Before
adjustment
After adjustment
Level threshold
(HOMARGINRXLEV)
30
28
Quality threshold
(HOMARGINRXQUAL)
30
26
Result