Sei sulla pagina 1di 1

Bar Bending Schedule OF Box Culvert

B = 3.05 m
H = 4.57 m
L =
Cover =

40

e
g

5.00 m

5000

mm

c
H

j
B
h

c
L

Top slab

Out side wall


Bottom slab

Bar
mark

Part
Top slab

Shape
Bar Dia
of Bar

Space
mm

Length
of bars
(m)

Row

Concrete
Length
(mm)

No. of
bars

Wt/ mtr Total


of bars weight
(Kg) (Kg)

Top steel

20

mm@

152

mm c/c

3.88

4.92

32

2.469 390

Bottom steel

20

mm@

203

mm c/c

3.88

4.92

24

2.469 300

Distribution

12

mm@

203

mm c/c

4.92

3.73

36

0.889 120

Thickness T =

381

Clear Length

3050

mm

Bottom slab

mm

Total Length

3812

mm

Top steel

20

mm@

203

mm c/c

3.882

4.92

24

2.469 300

Bottom steel

20

mm@

152

mm c/c

3.882

4.92

32

2.469 390

Distribution

12

mm@

152

mm c/c

4.92

3.73

50

0.889 170

Thickness T =

381

Clear Length

3050

mm

Out side wall

mm

Total Length

3812

mm

Out side steel

20

mm@

152

mm c/c

3.882

4.92

64

2.469 780

In side steel

20

mm@

203

mm c/c

3.882

4.92

48

2.469 590

Distribution

12

mm@

203

mm c/c

4.92

3.73

72

0.889 240

Thickness T =

381

Clear Height

4570

mm

5332

mm

mm

Total Height

Top Corner

12

mm@

152

mm c/c

2.587

4.92

32

0.889 140

Bottom Corner

12

mm@

152

mm c/c

2.587

4.92

32

0.889 140

Hunch

12

mm@

152

mm c/c

1.77

4.92

32

0.889 140

Total steel Required

3700 Kg
3.7 Tons