Disouq Field - Daily Production Report

TO : E- Gas Vice Chairman for Production & Development (Fax 2405581)


TO : E gas vice chairman for operations
TO : SUCO MD's.
CC : EGPC vice chairman for Production
CC : RWE Production General manager
From : SUCO Operation General Manager
Subject : Daily Production report.
Date:
18/8/2014
( From 06:00 AM on 17/08/2014 to 06:00 AM on 18/08/2014

1 - WELLS DATA :
No.of Wells available/on line

06 / 06

RPF
Wells
Flowing HRS
WHP (barg)
Annulus Pres. (barg)
FLT ( C )
Well production (MMscfd)
Well Gas choke opening (1/64")

CTP

NWK 1-1

NWK 1-2

NWK 1-3

NWK 1-4

NSG 1-1

NSG 1-2

24
150
54
56
17.652
24

24
150
152
48
12.658
15

24
170
40
58
22.78
26

24
188
50
49
12.921
18

20
226
25
34
16.925
42

20
224
N/A
34
15.698
28

2 - Sales Gas :

RPF

CTP

Sales Gas ( Flow Computer)

1701752

1015778.472

TOTAL
2717530.47

SCM

Sales Gas ( Flow Computer)

60.097

35.8719

95.969

MMSCF

Molecular Weight
Specific Gravity
G.Calorific Value
N.Calorific Value
HC Dew Point @ 58 bar
Water Dew Point
Delivery Pressure
Delivery Temp.

16.526
0.5706
1014.47
914
18
-8
56
34

0.5707
1027.19
927
-17
N/A
57
23

3 - Gas Consumption:
Total gas consumption

N/A

BTU/SCF
BTU/SCF
o
C
o
C
Bar
o
C

SCF

4- Gas Analysis:

Comp.
Feed RPF
Feed CTP
Export RPF
Export CTP

N2
0.0250
N/A
0.0660
0.1351

H2O
NIL
N/A
NIL
NIL

Feed / Export Pressure, Barg


Feed / Export Temp,C

CO2
0.8940
N/A
0.8120
0.3867

C1
97.8230
N/A
98.0830
97.9010

RPF

CTP

88/56
44/34

73/57
28/23

RPF

CTP

C2
0.8500
N/A
0.7500
1.0703

C3
0.1840
N/A
0.1080
0.2480

Tank(104)

T-401 A

iC4
0.0670
N/A
0.0410
0.0913

nC4
0.0320
N/A
0.0200
0.0590

iC5
0.0150
N/A
0.0130
0.0322

nC5
0.0090
N/A
0.0080
0.0230

5- Condensate
1- Movement :
71
0
1219
1290

Produced Condensate
Transferred Condensate
Opening Cond. Stock
Closing Cond. Stock

STB
STB
STB
STB

2- Tank Status:

RPF
Tank (101A) Tank (101B)
696
523

Opening stock, bbls


Closing stock, bbls
Water stock in tank, bbls

CTP
T-401 B

725

565

29

129

163

3- Analyses :

RPF
Tank- A
Tank- B
Tank- C
6- Outstanding Items:

CTP

RVP, PSI

Sp.Gr.

API

RVP, PSI

Sp.Gr.

API

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

Equipment out standing

Status

Remarks:* WATER DISPOSAL:

Transferred 45 m3 disposal water from RPF to GVOS thru truck

* CTP TOTAL S/D:

Faced many wells SD's and CTP GPSD'S due to power failure resulted from trip of AGGREKO Genenrator
Also,had GPSD due to malfunctioned response of LIT 4301 (FG K.O.D) and activation of high level alarm 5605 (MEG reboiler )
Plan today to continue review loops check and function test of transmitters.
.

DSQ Fields Gen. Mgr.

Bahaa El-Deen Kamel


Operations Gen. Mgr.