ELECTRICAL WORK ACTIVITY

Preparation of Drive current list for whole plant at 8.7 KA & 14.5 KA
load.

Preparation of Temporary & pending work list.

Preparation of ABB handover document and analysis the DC voltage


&MOM with m/s ABB as per technical PO.

Prepare spare list as per short & long term requirement.

Preparation of excess material list which is available at site.

Preparation of as built drawing & handover document for plant.

Proper Material handling in appropriate place at site.