Sei sulla pagina 1di 8

REVIEW OF PROJECT WORK

EC1

DAY

04-01-15

BATCH No

TITLE OF PROJECT

SPONTANEOUS BRAKING & ACCELERATION CONTROL

A VERY LOW POWER CMOS MIXED SIGNAL IC FOR IMPLANTABLE PACEMAKER


APPLICATION

VOICE CONTROLLED ROBOT WITH WIRELESS VIDEO TRANSMISSION

LOW COST VEIN AUTHENTICATION SYSTEM

RF BASED SMART SHOPPING TROLLEY

VOICE CONTROLLED WHEEL CHAIR FOR DISABLED PEOPLE

DESIGN OF WIRELESS ANTI-SPOOFING DEVICE FOR MEASURING BLOOD


OXYGEN CONCENTRATION & HEART RATE

HOME AUTOMATION USING ZIGBEE (GSM INCLUDED FOR SECURITY)

FEC BASED LOSS RECOVERY FOR IMAGE TRANSMISSION

10
1/11/2015

11

VOICE SOURCE LOCALIZATION FOR AUTOMATIC CAMERA POINTING SYSTEM

12

MICROCONTROLLER BASED AUTOMATIC RAILWAY GATE CONTROL

13
14

MOUSE CONTROL BASED ON COLOUR TRACKING USING MICROCONTROLLER

GUIDE
AMJAD KHAN

NTABLE PACEMAKER

ANSMISSION

MOHAMMED ZAKIR
SHAMNA.N.V
ABDULLAH GUBBI
NISHANT. N

PLE

URING BLOOD
SECURITY)

HASIBUR RAHMAN
ASIA HAZRRENA
MHD. HUSSAIN
SHOAIB KAMAL

A POINTING SYSTEM

NAZMUL ARAFIN

CONTROL

BINIYA K BINOY

MICROCONTROLLER LITTI MATHEW

REVIEW OF PROJECT WORK


EC1
DAY

BATCH No
1

TITLE OF PROJECT
CONTROLLING OF VALVE USING ROBOT

05-01-15

BIO-METRIC ATM MACHINE WITH OTP

CAR EVENT DATA RECORDER

5
6

ADAPTIVE HEAD LIGHT SYSTEM

HEAT CONTROL USING PLC SCADA

AUTOMATIC RATION DISPENSING SYSTEM

HIGH SPEED LOW POWER CAM WITH PARITY BIT AND POWER GATED ML
SENSING

10

WOMEN'S NEW SHIELD-COGNITIVE WATCH

11

2D PCA (PRINCIPLE COMPONENT ANALYSIS

12

INVISIBLE EYE-AN ADVANCED SECURITY SOLUTION FOR AGRICULTURAL


APPLICATION

13

AUTOMOBILE FUEL PUMP CONTROL AND MANAGEMENT USING


EMBEDDED SYSTEM

14

RADIO CONTROLLED QUAD COPTER WITH STEREO CAMERA AND SELF


BALANCING SYSTEM

15

ANALYSIS OF THE SKIN BURN USING IMAGE PROCESSING

1/12/2015

GUIDE
MHD. RAFEEQ

SHAMNA N.V
PRAKASH SHETTY

Dr. JOSE ALEX MATHEW


CHANDANA B.R
RUMIYA MARIYAM
BUSHRA
CHANDANA B.R
LITTY MATHEW
SHRUTHI
JITHENDRA N.K
MHD SAIFUDHEEN
TENSON JOSE

PA COLLEGE OF ENGINEERING
8EC 1
PROJECT WORK REVIEW
BATCHES

1 ST
REVIEW

2 ND
REVIEW

3 RD
REVIEW

1-7

2/4/2015

18-02-15

3/4/2015

8 - 14

2/11/2015

25-02-15

3/11/2015

NOTE:
* EVERY STUDENT HAVE TO CARRY LOG BOOK, WITH THE DETAILS PERTAINING TO THE PROJECT P
DATE
* SIGNATURES FROM THE RESPECTIVE PROJCET GUIDE AND THE HOD SHOULD BE TAKEN IN THE L
BEFORE ENTERING A PERTICULAR PROJECT SESSION
* INTERNAL MARKS WILL BE BASED ON THE PERFORMANCE IN THE REVIEW.
* REVIEW WILL BE HELD AS PER THE DATES DURING 2 TO 4 PM.

PA COLLEGE OF ENGINEERING
8EC 2
PROJECT WORK REVIEW
BATCHES

1 ST
REVIEW

2 ND
REVIEW

3 RD
REVIEW

1-7

2/5/2015

19-02-15

3/5/2015

8 - 15

2/12/2015

26-02-15

3/12/2015

EERING

VIEW
4 TH REVIEW

5TH REVIEW

3/18/2015

4/1/2015

3/25/2015

4/8/2015

PERTAINING TO THE PROJECT PROGRESS TILL

OD SHOULD BE TAKEN IN THE LOG BOOK

E REVIEW.

EERING

VIEW
4 TH REVIEW

5TH REVIEW

3/19/2015

4/9/2015

4/2/2015

4/23/2015

Potrebbero piacerti anche