Planning &

Pre-Design
Phase

Identify
Business
Objectives
(Scope)

Assemble
Project Team

Concurrent Facility & IT, Design & Engineering,


Construction Documentation

Construction
Phase

Purchase Long Lead Items

Establish
Design Criteria
(Availability &
Density)

Determine
Space, Cost,
& Timeline
Estimates

Evaluate ROI
in Achieving
Objectives

Statement of
Project Scope,
Schedule, &
Budget

Site Search,
Scoring &
Selection

Determine
IT & Facility
Requirements

Design &
Engineering
Phase

Conceptual
Designs

Typically 6 to 9 Months from the Design


Phase to the Maintenance Phase

Construction
Permits, Bids &
Contracts
IT Work

PTS Data Center Solutions, Inc.

Startup,
Commissioning
& Testing

568 Commerce Street

Facility & IT
Acceptance

Franklin Lakes, NJ 07417

(201) 337-3833

Maintenance
Phase

www.PTSdcs.com

Ongoing
Operations &
Maintenance