Sei sulla pagina 1di 43

=*=*=*=*=*=*=*=*=*=*=*=*=*=*=*=*=*=*

=*=*=*=*=*=*=*=*=*=*=*=*=*=*=*=*=*=*

D E S I G N

O F

C A P A C I T Y -

R. C. C.

S. R.

300.00

K. L.

metres.

S T A G I N G

20.00

S. B. C.

93.00 K.N./sqm.

=*=*=*=*=*=*=*=*=*=*=*=*=*=*=*=*=*=*
=*=*=*=*=*=*=*=*=*=*=*=*=*=*=*=*=*=*

NOTATIONS AND DIMENSIONS


========================
CAPACITY OF THE SERVICE RESERVOIR - C
=
300
INNER DIA OF CYLINDRICAL WALL - D
=
9.000
HEIGHT OF CYLINDRICAL WALL - H
=
4.250
RISE OF TOP DOME
- H1 =
1.450
RISE OF BOTTOM DOME
- H2 =
0.650
HEIGHT OF CONE WALL - H3 =
1.250
THICKNESS OF TOP DOME
- T1 =
0.150
THICKNESS OF BOTTOM DOME - T2 =
0.200
THICKNESS OF CYLINDRICAL WALL AT TOP - T3 =
0.250
THICKNESS OF CYLINDRICAL WALL AT BOT.- T4 =
0.250
THICKNESS OF CONICAL WALL AT TOP - T5 =
0.250
THICKNESS OF CONICAL WALL AT BOTTOM - T6 =
0.250
BREADTH OF TOP RING BEAM - B1 =
0.300
DEPTH OF TOP RING BEAM - D1 =
0.300
BREADTH OF MIDDLE RING BEAM - B2 =
0.900
DEPTH OF MIDDLE RING BEAM - D2 =
0.225
BREADTH OF BOTTOM RING BEAM - B3 =
0.450
DEPTH OF BOTTOM RING BEAM - D3 =
1.050
BREADTH OF FOUNDATION RING BEAM - B4 =
0.450
DEPTH OF FOUNDATION RING BEAM - D4 =
0.900
BREADTH OF BRACES - B5 =
0.300
DEPTH OF BRACES - D5 =
0.600
FREEBOARD
- Fb =
0.300
NUMBER OF COLUMNS - N
=
8
NUMBER OF BRACES - M
=
5
LIVE LOAD ON TOP DOME - L
=
4000
GRADE OF CONCRETE - M
=
25
GRADE OF STEEL
- St. =HYSD
HORIZONTAL PROJECTION OF CONE WALL - Hc =
1.250
DIA OF COLUMN CENTRE - Do =
6.050
HEIGHT OF DEAD STORAGE
- Dst =
0.150
SAFE BEARING CAPACITY OF SOIL
- SBC =
93
STAGING OF S.R.
- STA = 20.000
DEPTH OF FOUNDATION - Df =
2.000
DIAMETER OF COLUMN PROVIDED - Dc =
0.450
SIESMIC ZONE No. - Zn =
2
OUTER RADIUS OF RAFT a =
5.325
INNER RADIUS OF RAFT b =
0.725
OVERALL THICKNESS OF FOUNDATION SLAB - DS =
0.600
THICKNESS OF FOUNDATION SLAB AT END
- DSe =
0.300
THICKNESS OF PCC BELOW FOUNDATION SLAB(M-10)=
0.100
******************

K. L.
m.
m.
m.
m.
m.
m.
m.
m.
m.
m.
m.
m.
m.
m.
m.
m.
m.
m.
m.
m.
m.
m.
N/sqm.
m.
m.
m.
K.N./sqm.
m.
m.
m.
m.
m.
m.
m.
m.

CAPACITY CALCULATIONS
=====================
INNER DIAMETER OF CYLINDRICAL WALL -

9.000 m.

DIA OF CONE WALL AT BOTTOM EDGE Dcn =


9.000 1.250 * 2
DIA OF BOTTOM DOME Db =
6.050 0.450
HORIZONTAL PROJECTION OF CONE WALL - Hc =

6.500 m.

HEIGHT OF CONE WALL -

31.36 /8/

PI /4 * (

1.250 m.

H3

1.250 m.

H2

0.650 m.

RADIUS OF BOTTOM DOME


0.65 )+(
0.65 /2)

R2

6.356 m.

- C

0.4225 * (

6.356

VOLUME OF BOTTOM DOME


-(
0.65 /3))

81

42.25

5.600 m.

RISE OF BOTTOM DOME

REQUIRED CAPACITY OF THE TANK


PI*

300 KL.

8.149 KL.

VOLUME OF CONE WALL =


58.5 ) *
1.250 / 3

59.478 KL.

WATER COLUMN IN DEAD STORAGE

0.150 m.

VOLUME IN DEAD STORAGE


PI*(DST^2*(Tan(xo)+(1/Tan(x2)) )/2*Do + PI*Do*B3*DST

1.933 KL.

WATER COLUMN REQUIRED IN CYLINDRICAL PORTION


59.478 +
8.149 +
1.933 )/( PI / 4

=
*

3.939 m.
81 )

FREEBOARD

0.300 m.

DEPTH OF TOP RING BEAM CONSIDERED FOR PROVIDING FREEBOARD

0.000 m.

TOTAL HEIGHT OF VERTICAL WALL REQUIRED


3.939 +
0.300 0.000

4.239 m.

4.250 m.

NET VOLUME ACTUALLY PROVIDED


0.300 ) + 59.478 8.149

=
-

300.68 KL.
1.933

GROSS VOLUME PROVIDED INCLUDING FREEBOARD AND DEAD STORAGE


300.68 + ( PI / 4 *
81 *
0.3 ) +
1.933

321.70 KL.

300

PROVIDE HEIGHT OF VERTICAL WALL


PI/
4 *

81 * (

4.250

*********************

DESIGN OF TOP DOME


==================
GRADE OF CONCRETE :- M- 25
INNER DIA OF CYLINDRICAL WALL - (D)

9.000 metres

RISE OF DOME - (h1)

1.450 metres

RADIUS OF DOME - (R1)

7.708 metres

ASSUME TH.OF DOME - (t1)

0.150 metres

ANGLE (x1)=SIN^-1(D/2R1) = 0.623412 radians


(x1) = 35.71889 degrees
LIVE LOAD - (L)
UNIT WEIGHT OF WATER - (Ww)
UNIT WEIGHT OF CONCRETE - (Wc)

=
=
=

4000 Newtons/sqm.
9800 N/cum.
25000 N/cum.

U.D.L.PER sqm.OF SURFACE AREA DUE TO SELF WT. =


U.D.L.PER sqm DUE TO SELF WT.& LIVE LOAD

Less than 51.8 Degrees


so O.K.

(25000*t) =

3750 N/sqm.

(w1) = (25000*t1+L) =

7750 N/sqm.

MAXIMUM MERIDIONAL STRESS, i.e. AT SPRINGINGS


(1-0.811891 )/(0.340832 ) *
7750 *
7708 /
150
MAXIMUM HOOP STRESS i.e. AT THE TOP OF THE DOME
7750 *
7708 /
150 /2
HOOP TENSION AT EDGES AS PER CONTINUITY ANALYSIS

=
=
=

0.2198 N/sqmm.
(COMP) SAFE
0.1991 N/sqmm.
(COMP) SAFE
41384 N/m.

HOOP STRESS = 0.2759 N/sqmm.


41384 /
150 / 1000
(TENSILE) SAFE
LENGTH IN WHICH THIS HOOP STRESS WILL PERSIST =
820 mm.
0.76 * (
7.708 *
0.15 )^ 0.5 * 1000
AREA OF STEEL REQUIRED
=
226 sqmm.
41384 *
0.82 /
150
MIN AREA OF STEEL REQUIRED
@ 0.2286 % OF AREA
=342.8571 sqmm/m.
0.228571 *
150 * 1000 / 100
USING
8 mm. DIA BARS SPACING OF SQUARE MESH REQUIRED
=
147 mm. c/c.
say
140 mm. c/c.
PROVIDE 8 mm. BARS @
140 mm c/c BOTH WAYS IN THE FORM OF MESH.
AND HOOP BARS AT EDGES OF TOP DOME 8 mm. DIA- 5
NOS. IN
A LENGTH
OF
1200 mm.

AS PER CONTINUITY ANALYSIS, MOMENT AT EDGES OF DOME

FROM BENDING MOMENT POINT OF VIEW REQDUIRED t1


2906 *
1000 /
1000 * 6 /
1.8 )^ 0.5
AREA OF STEEL REQUIRED TO RESIST THIS BENDING MOMENT
2906000 /
150 /
0.872 / (
150 30

=
=
-

-2906 N-m/m.
98 mm.
O.K.
192 sqmm./m.
8 / 2 )

USING

8 mm. BARS SPACING REQUIRED


PI / 4 * 1000 *
64 /
192
DEVELOPMENT LENGTH REQUIRED = 26
x
DIA OF BAR

262 mm. c/c.

208 mm.

EXTEND THE VERTICAL BARS OF THE WALL IN THE DOME FOR A DISTANCE
AT A SPACING OF
190 mm. c/c. RADIALLY.

1200 mm.

DESIGN OF TOP RING BEAM


========================
GRADE OF CONCRETE :- M- 25
MAX MERIDIONAL STRESS IN TOP DOME i.e. AT SPRINGINGS

THICKNESS OF DOME

0.150 mm.

32970 N/m.

26768 N/m.

MERIDIONAL THRUST PER m. LENGTH OF DOME AT ITS BASE


0.2198 *
150 * 1000
HORIZONTAL COMPONENT PER m. LENGTH
32970 * Cos(x.1)
HOOP TENSION TRYING TO RUPTURE THE BEAM
26768 *
9 / 2
AREA OF STEEL REQUIRED
120456 /
150
USING 16 mm. DIA BARS , NOS. OF BARS
REQUIRED
803 / ( PI / 4 *
16 *
16 )
SAY
4

* ( PI / 4

( 120456 /
PROVIDE RING BEAM
HOOP

TENSION
PROVIDE

IN

120456 / (

RING
8
300

AREA OF STEEL PROVIDED


16 *
16 )
AREA OF CONCRETE REQUIRED
1.3 ) - (11 - 1)*
804
0.300 m. WIDE
x
0.300

BEAM AS PER
mm. DIA

CONTINUITY

STIRRUPS

ANALYSIS

=
=
=
=
=
>
=

0.2198 N/sqmm.

120456 N.
803 sqmm.
3.99 Nos.
4 Nos.
804 sqmm.
803 SO O.K.
84618 sqmm.

m. DEEP
=
<

24697 N.
120456 SO SAFE

300 mm. c/c.

STRESS IN CONCRETE OF RING BEAM


=
1.229 N/sqmm.
*
300 +
804 *
10 ) (TENSILE) SAFE
DESIGN OF TANK WALL
===================

GRADE OF CONCRETE :- M- 25
INNER DIA OF CYLINDRICAL WALL

9.000 m.

COLUMN

4.250 m.

AS PER CONTINUITY

AREA OF HOOP RINGS REQUIRED


273400 /
150

HEIGHT OF WATER
MAXIMUM HOOP TENSION AT THE BASE

273400 N/m.
1823 sqmm./m.

TAKING MAXIMUM ALLOWABLE TENSILE STRESS IN CONCRETE

THICKNESS REQUIRED TO RESIST HOOP TENSION


273400 /
1.300 - ( 11 - 1 ) *
1823 ) ) / 1000
AS PER CONTINUITY MAXIMUM B.M. AT THE BOTTOM OF THE WALL

THICKNESS REQUIRED FROM BENDING MOMENT POINT OF VIEW


( 6 * 9617000 /
1.800 /
1000 )^ 0.5
PROVIDE THICKNESS OF THE WALL AT THE BASE

1.300 N/sqmm.
192 mm.

PROVIDE THICKNESS OF THE WALL AT THE

TOP

-9617 N-m.
179 mm.

0.250 m.

0.250 m.

CALCULATION OF HOOP REINFORCEMENT AT DIFFERENT HEIGHTS IN WALL


=================================================================================
:
WALL
HOOP
TOTAL AREA OF STEEL REQD. DIA OF
SPACING
DEPTH OF WALL
:THICKNESS FORCE
------------------------- HOOP BARS PROVIDED
BELOW TOP
:AT LOWER
TO
MINIMUM MAXIMUM PROVIDED
:
END
RESIST TEMPERA OF TWO
FROM
TO :
HOOP
-TURE
VALUES
:
FORCE
STEEL
(m)
(m) :
mm.
N/m.
sqmm.
sqmm.
sqmm.
mm.
mm c/c.
--------------------------------------------------------------------------------4.250
3.370
250
273400
1823
571
1823
16
110
3.370

2.490

250

148617

991

571

991

12

110

2.490

1.545

250

109809

732

571

732

10

105

1.545

0.600

250

68135

454

571

571

10

135

0.600
0.000
250
68973
460
571
571
10
135
=================================================================================
HOOP FORCES AT TOP & BOTTOM ENDS HAVE BEEN WORKED OUT FROM CONTINUITY ANALYSIS.
CALCULATION OF VERTICAL REINFORCEMENT AT DIFFERENT HEIGHTS IN WALL
=================================================================================
DEPTH OF WALL
:
WALL
MINIMUM BENDING STEEL
SPACING PROVIDED AREA OF
BELOW TOP
:THICKNESS TEMPERA MOMENT
REQD.
------------------ STEEL
:AT BOTTOM -TURE
TO
OUTER
INNER PROVIDED
FROM
TO :
STEEL
RESIST
-----------------:
REQD.
B.M.
8
8
(m)
(m) :
mm. sqmm.
N-m.
sqmm.
mm.
mm. sqmm.
--------------------------------------------------------------------------------4.25
2.55
250
514
-9617
348
190
190
529
2.55

1.50

250

514

190

190

529

1.50
0.00
250
514
2901
105
190
190
529
=================================================================================
273400 /

MAXIMUM HOOP STRESS IN THE WALL =


1.019 N/sqmm.
{ ( 1000 *
250 ) + (11 - 1) - PI / 4 * 1000 *
16 *
16 /
110 } <
1.300 SO SAFE

MAXIMUM BENDING STRESS IN THE WALL =


9617000
/
250
/
250
/
<

0.923 N/sqmm.
1000
1.800 SO SAFE

*********************

DESIGN OF CONE TOP CUM BALCONY


==============================
GRADE OF CONCRETE :- M- 25
ASSUME BREADTH OF BALCONY SLAB - B2
ASSUME DEPTH OF BALCONY SLAB - D2
ASSUME DEPTH OF BALCONY SLAB AT THE TAPERED END
AVERAGE DEPTH OF BALCONY SLAB - D2av
(
0.225 +
0.225 ) / 2

=
=
=
=

0.900
0.225
0.225
0.225

m.
m.
m.
m.

LOADS UPTO TOP OF CONE


======================
DEAD LOAD OF TOP DOME
=
263342 N.
2 * PI * R1 * H1 * t1 * 25000
LIVE LOAD ON TOP DOME
=
280899 N.
2 * PI * R1 * H1 * L
DEAD LOAD OF TOP RING BEAM
=
65738 N.
PI * ( D + B1 ) * B1 * D1 * 25000
DEAD LOAD OF CYLINDRICAL WALL
=
771899 N.
PI*{(D+T3)*T3*H + (D+2*t3+2/3*(t4-t3))*(H-Ho)*(t4-t3)/2}*25000
DEAD LOAD OF BALCONY SLAB
=
165405 N.
PI * ( D + 2*t4 + B2 ) * B2 * D2av * 25000
LIVE LOAD ON BALCONY SLAB
=
164777 N.
PI/4*{ (D+2*t4+2*B2)^2 - (D+2*t4)^2 } *
5000 + PI*(D+2*t4+2*B2)*500
CONCRETE IN TRIANGULAR PART BETWEEN WALL,RING BEAM & CONE
=
20617 N.
PI * ( D + 4/3*t4 ) * ( t4*D2/2 ) * 25000
--------TOTAL ----> 1732677 N.
LOAD PER UNIT LENGTH AT CENTRE OF THE CONE WALL
1732677 / (
9.000 +
0.250 ) / PI
MERIDIONAL THRUST IN CONE PER UNIT LENGTH
59625 / Cos(xo)
HORIZONTAL COMPONENT OF THRUST IN CONE PER m. LENGTH
59625 * Tan(xo)
HORIZONTAL FORCE DUE TO WATER PRESSURE
9800 * (
0.225 0.250 * Sin(xo) *
4.250
HOOP TENSION IN RING BEAM

59625 N/m.

84323 N/m.

59625 N/m.

2008 N.

285053 N.

59625 +
2008 )*(
9.000 +
0.250 ) / 2
HOOP TENSION IN RING BEAM AS PER CONTINUITY ANALYSIS

AREA OF STEEL REQUIRED


285053 /
150
IF USING 16 mm. DIA BARS NOS. OF BARS REQD.
1900 /
201
HOWEVER PROVIDE
10 NOS
16 mm. DIA HOOP BARS

285053

AREA OF STEEL PROVIDED


10 *
201
AREA OF CONCRETE REQUIRED
1.3 )-(
11
- 1 )
*
2011
AVERAGE DEPTH OF RING BEAM REQUIRED
199162 /
0.900 / 1000000
AVERAGE DEPTH OF RING BEAM PROVIDED

221454 N.

1900 sqmm.

9.45 Nos.

2011 sqmm.

199162 sqmm.

0.221 m.

0.225 m.

HOOP STRESS ON EQUIVALENT AREA OF CONCRETE SECTION


=
285053 / (
0.900 *
0.225 *1000000 + 10 *
2011 )<

1.281 N/sqmm.
1.300

CHECK AS BALCONY SLAB


=====================
GRADE OF CONCRETE :- M- 25

0.225

CANTILEVER PROJECTION OF BALCONY SLAB

0.900 m.

DEPTH OF BALCONY SLAB

0.225 m.

DEPTH AT FREE END

0.225 m.

AVERAGE DEPTH

0.225 m.

DEAD LOAD OF BALCONY SLAB


0.225 * 25000
LIVE LOAD ON THE BALCONY SLAB

5625 N/sqm.

5000 N/sqm.

LOAD AT THE EDGE DUE TO RAILING

500 N/m.

=
*
=

4753 N-m.
0.900
58 mm.

225 mm.

8 mm.

BENDING MOMENT AT THE EDGE OF THE CONICAL DOME


*
25000 +
5000 ) *
0.810 /2+
500
EFFECTIVE DEPTH REQUIRED
(
4753 /
1.423 )^ 0.5
OVERALL DEPTH PROVIDED
DIA OF BARS CHOOSEN

EFFECTIVE DEPTH AVAILABLE


=
8 /2 - 35
>
AREA OF STEEL REQUIRED
=
4753000 /
150 /
0.872 /
186
SPACING REQUIRED
=
PI / 4 *
64 *
1000 /
195
SPACING OF BARS EXTENDED FROM THE CONE WALL SHALL BE SUFFICIENT
225

186 mm.
58 mm. SO OK
195 sqmm.
258 mm. c/c

*********************

DESIGN OF CONE WALL


===================
GRADE OF CONCRETE :- M- 25
ASSUMING THICKNESS OF CONE WALL AT THE TOP - T5 =

0.250 m.

ASSUMING THICKNESS OF CONE WALL AT THE BOTTOM - T6 =

0.250 m.

AVERAGE THICKNESS OF THE CONE WALL


=
0.250 m.
(
0.25 +
0.25 ) / 2
ANGLE OF INNER FACE WITH VERTICAL - (xo)
=
0.7854 Radians.
Tan inverse(
1.250 /
1.250 )
= 45.0000 Degrees.
SLANT LENGTH OF CONE WALL
=
1.768 m.
(
1.250 ^2+
1.250 ^2)^ 0.5
SELF WEIGHT OF CONE WALL
=
277717 N.
PI*
0.250 * (
9.000 +
6.500 +2*
0.250 ) *
1.768 /2*25000
WEIGHT OF WATER OVER CONE WALL
= 1453993 N.
9800 * PI/4 * (
81 42.25 )*(
4.250 +
1.250 /2)
LOAD COMING FROM TOP OF CONICAL WALL
= 1732677 N.
--------TOTAL ----> 3464387 N.
--------WEIGHT PER UNIT LENGTH AT THE LOWER EDGE
3464387 / 3.141592 /
6.500
MERIDIONAL THRUST IN THE CONE WALL
169654 / Cos(xo)
MERIDIONAL STRESS
239927 /
0.250 / 1000000
DIAMETER OF CONE WALL AT HEIGHT H" ABOVE BOTTOM OF CONE - D"

169654 N/m.

239927 N/m.

=
<

0.9597 N/sqmm.
6.000 SO SAFE

D"=

6.500

+(

1.250

/
1.250 )*2*H"
INTENSITY OF WATER PRESSURE
- P"
P"=
53900 9800 x H"
SELF WEIGHT OF CONE WALL - Q"
Q"=
6250 0 X H"
HOOP TENSION - Po"
Po"= { P" / Cos(xo) + Q" * Tan(xo) } * D" / 2
FOR MAXIMUM HOOP TENSION dPo"/dH" = 0
H"

HOOP TENSION AT THE TOP OF


HOOP TENSION AT THE TOP OF
HOOP TENSION AT THE BOTTOM
HOOP TENSION AT THE BOTTOM
MAXIMUM HOOP TENSION AT

N/sqm.
N/sqm.
N.

FOR MAXIMUM HOOP

1.250 m.

MAXIMUM HOOP TENSION

293185 N/m.

CONE WALL
CONE WALL AS PER CONTINUITY
OF CONE WALL
OF CONE WALL AS PER CONTINUITY
1.25 m. FROM BASE

=
=
=
=
=

293185 N/m.
273400 N/m.
268048 N/m.
13698 N/m.
293185 N/m.
--------MAXIMUM--->
293185 N/m.
--------=

PROVIDE 16 NOS.BARS ON EACH FACE.


Ast. PROVIDED
2 *
16 *
113 /
1.768
MAXIMUM TENSILE STRESS ON EQUIVALENT AREA
293185 / {(t6 - (t6-t5)*H"/H3)*1000000 + (11 -1)*Ast}
MINIMUM TEMPERATURE STEEL REQUIRED IN RADIAL DIRECTION
0.24 *
0.26 / 0.30

2045 sqmm/m.

=
<
=

1.0841 N/sqmm.
1.3000 SO SAFE
0.2057 %

514 sqmm.

257 sqmm/m.

=
=
=

196 mm c/c
190 mm c/c
153 Nos.

264 sqmm/m.

IF

AREA OF HOOP STEEL REQUIRED


293185 /
150
USING 12 mm. BARS, Nos. OF BARS REQUIRED ON EACH FACE
1.768 *
1955 /
113 /
2

AREA OF TEMPERATURE STEEL REQUIRED


0.205714 *
0.250 * 10000
AREA OF TEMPERATURE STEEL REQUIRED ON EACH FACE
514 / 2
IF USING 8 mm. DIA BARS SPACING OF RADIAL BARS REQD.
1000 * PI / 4 *
64 /
257
SAY
NOS. OF BARS REQUIRED ON EACH FACE
{ 1000 * PI * (
9.000 +
0.250 ) /
190 } + 1
AREA OF STEEL PROVIDED
1000 * PI / 4 *
64 /
190
BENDING MOMENT ON WATER FACE AT BOTTOM EDGE
AS PER CONTINUITY ANALYSIS
TENSILE / COMPRESSIVE STRESS DUE TO BENDING
6 *
24173 /
0.25 /
0.25 / 1000,000
MERIDIONAL COMPRESSIVE STRESS

SIGMA-CC"

SIGMA-CBC"

NET TENSILE STRESS


2.321 0.96
0.96
2.321

1955 sqmm/m.
15.29 Nos.

24173 N-m.

2.321 N/sqmm.

=
<
=
<

0.960
6.000
1.361
1.800

N/sqmm.
SO SAFE
N/sqmm.
SO SAFE

--------SIGMA-CC
24173

---------SIGMA-CBC

------ +
6.000

------ =
8.500

AREA OF STEEL REQUIRED TO RESIST BENDING MOMENT


/
150 /
0.872 /
196 * 1000
SPACING OF RADIAL BARS AT BOTTOM EDGE OF CONE
190 *
6.500 /
9.000
AREA OF STEEL PROVIDED
PI / 4 *
64 /
137 * 1000
AREA TO BE PROVIDED BY HAUNCH BARS
943 367
IF USING 10 mm. DIA BARS SPACING REQUIRED
AREA PROVIDED BY HAUNCH BARS

943 sqmm.

137 mm. c/c

367 sqmm.

576 sqmm.

=
say
=

LENGTH OF EXTENSION OF HAUNCH BARS IN CONE WALL


26 *
10
BENDING MOMENT NEAR TOP EDGE OF THE CONE
4875

AREA OF STEEL REQUIRED


150 /
0.872 /
196 * 1000
AREA OF STEEL PROVIDED BY TEMPERATURE STEEL

TEMPERATURE STEEL WILL TAKE CARE OF THE

B.M.

0.433 < 1 SO OK

136 mm. c/c


130 mm. c/c
604 sqmm.

800 mm.

4875 N-m.

190 sqmm.

264 sqmm.

AT TOP EDGE

*********************

DESIGN OF BOTTOM DOME


=====================
GRADE OF CONCRETE :- M- 25
SPAN OF BOTTOM DOME - (Db)
RISE OF DOME - (h2)
RADIOUS OF DOME - (R2)
ASSUME TH.OF DOME - (t2)
ANGLE (x2) = SIN^-1 (Db/2R2)
(x2)

=
5.600 metres
=
0.650 metres
=
6.356 metres
=
0.200 metres
= 0.456187 radians
= 26.13761 degrees

Less than 51.8 Degrees


so O.K.

SELF WEIGHT OF DOME


2 * PI * R2 * h2 * t2 * 25000
WEIGHT OF WATER RESTING OVER DOME
{ PI/4 * Db^2 * (H + H3) - PI/3 * h2^2 *(3*R2 - h2) }*9800
TOTAL LOAD OVER DOME
129792 + 1247703
SURFACE AREA OF DOME
2 * PI *
6.356 *
0.650
LOAD PER sqm. ON DOME SURFACE - w2
1377495 /
25.958
MERIDIONAL STRESS i.e. AT SPRINGINGS

129792 N.

1247703 N.

1377495 N.

25.958 sqm.

53066 N/sqm.

0.8887 N/sqmm.

53066

6.356

0.200 /1000000 / (1+Cos(x2))


HOOP STRESS AT CROWN OF DOME
53066 *
6.356 *
0.200 / 2 / 1000000
HOOP TENSION AT EDGES OF DOME AS PER CONTINUITY ANALYSIS

<
=
<
=

6.0000
0.8432
6.0000
10958

SO SAFE
N/sqmm.
SO SAFE
N/m.

HOOP STRESS
=
0.055 N/sqmm.
10958 /
0.200 / 1000000
<
1.300 SO SAFE
LENGTH IN WHICH THIS HOOP TENSION WILL PERSIST
=
860 mm.
0.76 * (
6.356 *
0.200 )^0.5 * 1000
AREA OF HOOP STEEL REQUIRED
=
63 sqmm.
10958 *
860 /
150 / 1000
MINIMUM AREA OF STEEL REQUIRED @
0.217 % =
434 sqmm/m.
0.217 *
10000 *
0.200
IF USING 10 mm.DIA BARS SPACING OF SQUARE MESH REQUIRED
=
181 mm c/c
1000 * PI / 4 *
100 /
434
PROVIDE 10 mm. BARS @
180 mm c/c BOTH WAYS IN THE FORM OF MESH.
AND HOOP BARS AT EDGES OF BOTT DOME 10 mm. DIA- 5
NOS. IN
A LENGTH
OF
1000 mm.
AS PER CONTINUITY ANALYSIS MOMENT AT EDGES OF DOME =
-13939 N-m.
FROM BENDING MOMENT POINT OF VIEW REQUIRED
t2 =
( 6 *
13939 /
1.8 )^0.5
INCREASE THE THICKNESS OF BOTTOM DOME AT EDGES TO
250 mm.
AND TAPER IT TO
200 mm. IN A LENGTH
1000 mm.
TENSILE/COMPRESSIVE STRESS DUE TO BENDING MOMENT =
6 *
13939 /
250 /
250
NET TENSILE STRESS =
1.338 0.8887 <
AREA OF STEEL REQUIRED TO RESIST BENDING MOMENT =
13939 /
150 /
0.872 /
195 * 1000
USING 10 mm. DIA BARS SPACING OF RADIAL BARS REQUIRED =
1000 * PI / 4 *
100 /
546
DEVELOPMENT LENGTH REQUIRED = 26
x
DIA OF BAR =
26
*
10
PROVIDE 10 mm. DIA RADIAL BARS @
130 mm. c/c AND
EXTEND THEM IN THE BOTTOM DOME FOR A DISTANCE OF
1000 mm.

216 mm.

1.338 N/sqmm.
0.449 N/sqmm.
1.800 SO SAFE
546 sqmm.
144 mm. c/c
260 mm.

DESIGN OF BOTTOM RING BEAM


==========================
GRADE OF CONCRETE :- M- 25
HORIZONTAL COMPONENT OF INWARD THRUST FROM CONE WALL
239927 * Sin(xo)
HORIZONTAL COMPONENT OF OUTWARD THRUST FROM BOTTOM DOME
0.8887 *
0.200 * 1000000 * Cos(x2)
NET RADIAL THRUST ON THE RING BEAM
169654 159564
HOOP FORCE DUE TO RADIAL THRUST
10090 *
6.050 / 2
NUMBER OF COLUMNS SUPPORTING THE TANK
ANGLE SUBTENDED BY TWO ADJACENT COLUMNS AT CENTRE
360 / 8
DIA OF COLUMN CENTRES

169654 N/m.

159564 N/m.

10090 N.
(INWARD)
30522 N.

=
=
=
=

8 Nos.
45 Degrees.
6.050 m.

MINIMUM
OF

LET THE WIDTH OF THE BEAM

0.450 m.

LET THE DEPTH OF THE BEAM

1.050 m.

2.215 m.

EFFECTIVE SPAN IF TREATED AS DEEP BEAM


|
PI /
8 *
6.050
| 1.15 * (PI /
8 *
6.050 Leff / D3
SO DESIGN THE

2.110

<

Leff
0.450 )

2.5

BEAM AS A DEEP BEAM

TOTAL WEIGHT TRANSFERRED BY CONE WALL ON RING BEAM

3464387 N.

TOTAL WEIGHT TRANSFERRED BY BOTTOM DOME ON RING BEAM

1377495 N.

PI * 9800

PI *

290814

FOR BEAM SEC.

WEIGHT OF WATER OVER BOTTOM RING BEAM =


461006 N.
6.050 *
0.450 * (
4.250 +
1.250 )
SELF WEIGHT OF CURVED BEAM =
224516 N.
0.450 *
1.050 *
6.050 * 25000
--------TOTAL-----> 5527404 N.
--------LOAD PER METER LENGTH - w3 =
290814
5527404 / 3.141592 /
6.050
w3 * R^2 * 2 THETA = 2090047
3.025 *
3.025 /
8 * 2 * PI
MAX EFFECTIVE HOOP STRESS IN CONCRETE =
0.065 N/sqmm.
30522 /
0.450 /
1.050 / 1000000
(COMP)
MAX BENDING COMPRESSIVE STRESS IN CONCRETE =
2.889 N/sqmm.

SIGMA-CC"
SIGMA-CBC"
0.065
2.889
--------- + ---------- =--------- + --------- = 0.350715 < 1
SIGMA-CC
SIGMA-CBC
6.000
8.500
SO SAFE
LEVER ARM =
758 mm.
0.2 * (
2.215 +
1.05 * 1.50
)
DEPTH OF TENSION ZONE NEAR TOP FACE =
210 mm.
0.2 * 1000 *
1.050
FRACTION OF STEEL REQUIRED =
0.805
0.5 * (
2.215 /
0.600 - 0.500)

=================================================================================
S.
PARAMETER
SUPPORT
MID
POINT OF UNIT OF
NO.
SPAN
MAXIMUM MEASURETORSION MENT
--------------------------------------------------------------------------------1.DIA OF BARS USED FOR B.M. & TORSION
20
20
20 mm.
2.ALLOWABLE STRESS

150

190

150 N/sqmm.

3.LEVER ARM

758

758

758 mm.

4.COEFFICIENT FOR BENDING MOMENT


5.BENDING MOMENT

6.COEFFICIENT FOR TORSION


7.TORSION

8.MT = T x (1+D3/B3) / 1.7


9.EQUIVALENT B.M.-

Meq = M + MT

10.AREA OF STEEL REQUIRED


11.MIN.AREA OF STEEL REQD.- 0.85*b*d/fy

0.0660

0.0330

-137943

68972

0.0000

0.0000

10450 N-m.

20490 N-m.

137943

68972

20490 N-m.

1213

479

180 sqmm.

936

936

936 sqmm.

0 N-m.
0.0050

12.NOS. OF BARS

REQUIRED FOR

" Meq "

3.86

2.98

2.98 Nos.

13.NOS. OF BARS

PROVIDED FOR

" Meq "

3 Nos.

14.AREA OF STEEL PROVIDED FOR

" Meq "

1257

942

345462

199600 N.

37156 N.

345462

236756 N.

0.775

0.531 N/sqmm.

0.238

0.199

0.199 N/sqmm.

10

10

10 mm.

98

315

158 mm.

300

300

300 mm.

15.SHEAR FORCE

16.SHEAR DUE TO TORSION

17.EQUIVALENT SHEAR FORCE

1.6 * T/B4

18.NOMINAL SHEAR STRESS

19.PERMISSIBLE SHEAR STRESS


20.DIA

OF

Veq

2 LEGGED STIRRUPS

21.SPACING REQUIRED
22.MAXIMUM PERMISSIBLE SPACING

TAUc

942 sqmm.

23.SPACING PROVIDED
90
300
150 mm.
--------------------------------------------------------------------------------AREA OF SIDE FACE REINFORCEMENT REQD. @
0.1 % =
472.5 sqmm.
0.1 *
0.450 *
1.050 * 1000000 / 100
IF USING
10 mm.DIA BARS NOS. OF BARS REQD. ON EITHER FACE =
3.01 Nos.
472.5 / 2 / ( PI/4 *
100 )
NOS. OF BARS PROVIDED ON EITHER FACE =
4
472.5 / 2 / ( PI /4 *
100 ) + 1

DESIGN OF COLUMNS
=================
GRADE OF CONCRETE :- M- 25
HEIGHT OF STAGING ABOVE GROUND LEVEL

20.000 m.

DEPTH OF FOUNDATION BELOW GROUND LEVEL

2.000 m.

0.900 m.

TOTAL LENGTH OF COLUMNS


=
20.000 +
2.000 0.900 1.050
ASSUME NOS. OF COLUMNS TO BE PROVIDED - N =

20.050 m.

DEPTH OF FOUNDATION BEAM

ASSUME NOS. OF BRACES TO BE PROVIDED - M =


ASSUME BREADTH OF BRACE - B5 =
ASSUME
DEPTH OF BRACE - D5 =
DIAMETER OF COLUMN PROVIDED

PI / 4 * N *
8

0.300 m.
0.600 m.
0.450 m.

LENGTH OF A BRACE BETWEEN TWO COLUMNS


6.050 * Sin(PI/N) 0.450
TOTAL WEIGHT OF CONTAINER AND WATER

1.865 m.

5527404 N.

TOTAL SELF WEIGHT OF COLUMNS


0.450 *
20.050
* 25000
TOTAL SELF WEIGHT OF BRACES
5 *
1.865 *
0.600 *
0.300
TOTAL WEIGHTS FROM STAIRCASE PIPES ETC.

637763 N.

=
*
=

335700 N.
25000
292788 N.
--------6793655 N.

0.450

TOTAL WEIGHT AT THE BASE OF EACH COLUMN


=
6793655 /
8
UNSUPPORTED LENGTH - L =
3.342 0.600
MIMIMUM LATERAL DIMENSION - Dc =
=

5 Nos.

TOTAL WEIGHT AT THE BASE OF STAGING---->

L / Dc

8 Nos.

849207 N.
2.742 m.
0.45 m.

6.093 < 12 SO DESIGN AS A SHORT COLUMN

MINIMUM ECCENTRICITY FOR DESIGN OF COLUMNS - e =


3.342 / 500
+
0.450 / 30
AS "e" IS
< 0.0225 SO DESIGN FOR AXIAL LOAD AGE FACTOR =
0.05 *
0.450
ALLOWABLE COMPRESSIVE STRESS IN CONCRETE =
1 *
6.00
TAKING MIN. % OF STEEL @ 0.8 % . AREA OF CONCRETE REQUIRED =
849207 / (
0.992 *
6.000 +
0.008 *
175 )
DIAMETER OF COLUMN REQUIRED =
( 115507 / PI * 4)^0.5
DIAMETER OF COLUMN PROVIDED =
>
MINIMUM AREA OF LONGITUDINAL STEEL REQUIRED =
0.008 * PI/4 *
383 *
383
IF USING 12 mm. DIA BARS NOS. OF BARS REQD. =

NOS. OF BARS PROVIDED

0.022 m.
1
6.00 N/sqmm.
115507 sqmm.
383 mm.
450 mm.
383 SO SAFE
922 sqmm.
8.15 Nos.

9 Nos.

AREA
PI / 4 *
AREA OF
( PI / 4 *
450 *
EQUIVALENT AREA
158025 +
1.5 *
MOMENT OF INERTIA
9

OF STEEL PROVIDED
12 *
12
CONCRETE PROVIDED
450 ) 1018
OF COLUMN SECTION
11 *
1018
OF COLUMN SECTION

( PI / 64 *

1018 sqmm.

158025 sqmm.

174822 sqmm.

= 2265.677
x10E+6
mm^4
*
179 ^2
= 10069675 mm^3

450 ^4) + ( 11*1.5 - 1 ) / 2 *


1018
SECTION MODULUS
2265.677 * 1000000 / (
0.450 * 1000 / 2)
FACTORED LOAD = 1273810.
1.5 * 849207
ULTIMATE LOAD CARRYING CAPACITY = 1863305
( 0.4 *
25 *
158025 + 0.67 * 415 *
1018 ) *
1
IF USING 8 mm. DIA LINKS SPACING REQUIRED =
190
PROVIDE

8 mm. DIA LINKS @

N.
N.
SAFE
mm c/c

190 mm. c/c

CHECK FOR WIND FORCES


=====================
BASIC WIND SPEED AS PER FIGURE-1 OF I.S. 875(PART 3 - 1987) =
ADOPTING k1 = 1.07, k2 = 1.07 & k3 = 1 - DESIGN WIND SPEED =
DESIGN WIND PRESSURE =
REDUCTION FACTOR ON ACCOUNT OF CIRCULAR SHAPE(AS PER TABLE 23)=
NET WIND PRESSURE ON CIRCULAR SHAPES =
1216 * 0.7
CALCULATIONS FOR WIND FORCE ON CONTAINER AND BENDING MOMENT
===============================================================
NAME OF COMPONENT PROJECTED NET WIND
WIND LEVER ARM MOMENT
AREA
PRESSURE
FORCE ABOUT
ABOUT
COLUMN
COLUMN
TOP
TOP
sqm.
N/sqm.
N.
m.
N-m.
--------------------------------------------------------------TOP DOME
8.700
1216
10579
7.817
82696
TOP RING BEAM

2.880

1216

3502

6.700

23463

CYLINDRICAL WALL

40.375

1216

49096

4.425

217250

MIDDLE RING BEAM

2.543

1216

3092

2.188

6765

CONICAL DOME

9.688

1216

11780

1.709

20132

47
53.81
1737
0.70
1216

m/s.
m/s.
N/sqm.
N/sqm.

BOTTOM RING BEAM


6.825
1216
8299
0.525
4357
--------------------------------------------------------------TOTAL---> 71.010
86348
4.11
354663
===============================================================
TOTAL WIND FORCE ON CONTAINER

86348 N.

LEVER ARM OF FORCE ON CONTAINER ABOVE TOP OF COLUMNS


354663
/
86348

4.11 m.

WIND FORCE ON COLUMNS OF A PANEL =


*
0.45
*
2.742
WIND FORCE ON BRACES OF A PANEL =
1737
*
1
*
0.600
*
6.500
WIND FORCE AT TOPMOST PANEL POINT =
{ (
12003
+
6774 / 2 ) } / 2
WIND FORCE AT SECOND TOPMOST PANEL POINT =
7695
+
18777 / 2
WIND FORCE AT INTERMEDIATE PANEL POINTS =
12003
+
6774
WEIGHT OF CONTAINER WITH WATER & WITHOUT LIVE LOAD =
5527404
280899
164777
WEIGHT OF COLUMNS IN A PANEL =
WEIGHT OF BRACES IN A PANEL =
1216

12003 N.

6774 N.
7695 N.
17084 N.
18777 N.
5081728 N.
106304 N.
67148 N.

CALCULATION OF WIND MOMENTS ON CONTAINER AND STAGING


=================================================================================
S.NO. OF HEIGHT
WIND
WIND
TOTAL
LEVER
MOMENT
MOMENT TOTAL
PANEL
OF
FORCE ON FORCE ON SHEAR
ARM OF
DUE TO
DUE TO MOMENT
FROM TOP PANEL
CONTAINER STAGING IN THE
FORCE
WIND
WIND
ABOVE
PANEL
ON
FORCE
FORCE
PANEL
CONTAINER ON
ON
CENTRE
CONTAINER STAGING
m.
N.
N.
N.
m.
N-m.
N-m.
N-m.
--------------------------------------------------------------------------------1
3.342
86348
7695
94043
5.481
473273
12858
486131
2

3.342

86348

24779

111127

8.823

761848

67122

828970

3.342

86348

43556

129904

12.165

1050423

181310

1231733

3.342

86348

62333

148681

15.507

1338998

358251

1697249

3.342

86348

81110

167458

18.849

1627573

597944

2225517

6
3.342
86348
99887
186235
22.191 1916148
900390 2816538
=================================================================================
=================================================================================
S.NO. OF AVERAGE THRUST IN LOAD PER DESIGN DESIGN
ALLOWABLE BENDING
AGE
PANEL
WIND
LEEWARD
COLUMN
AXIAL
AXIAL
DIRECT
MOMENT
FACTOR
FROM TOP SHEAR
COLUMN
DUE TO
LOAD
DIRECT
COMP.
IN COLUMN AS PER
PER
DUE TO
DIRECT
PER
COMP.
STRESS
DUE TO
CLAUSE
COLUMN
WIND
VERTICAL COLUMN STRESS
WIND
5.2.1 OF
MOMENT
LOADS
SHEAR
I.S.-456
N.
N.
N.
N.
N/sqmm. N/sqmm. N/sqmm.
--------------------------------------------------------------------------------1
18809
40176
648504
688680
3.939
8.000
25787
1.00
2

22225

68510

670186

738696

4.225

8.000

30470

1.00

25981

101796

691868

793664

4.540

8.000

35620

1.00

29736

140269

713550

853819

4.884

8.000

40768

1.00

33492

183927

735232

919159

5.258

8.000

45918

1.00

6
37247
232772
756914
989686
5.661
8.000
51066
1.00
=================================================================================

==================================================================
S.NO. OF COMP.
ALLOWABLE COMP.
ALLOWABLE
PANEL
STRESS
COMP.
STRESS COMP.
SIGMA-CC" / SIGMA-CC
FROM TOP DUE TO
STERSS
DUE TO BENDING
+
VERTICAL WITH
BENDING STERSS
SIGMA-CBC"/SIGMA-CBC
LOADS
WIND
WITH WIND
N/sqmm. N/sqmm. N/sqmm. N/sqmm.
-----------------------------------------------------------------1 3.709510
8.000 2.560857
11.333
0.690
2 3.833533

8.000 3.025916

11.333

0.746

3 3.957556

8.000 3.537353

11.333

0.807

4 4.081580

8.000 4.048591

11.333

0.867

5 4.205603

8.000 4.560027

11.333

0.928

6 4.329626
8.000 5.071265
11.333
0.989
==================================================================

SEISMIC ANALYSIS
================
SEISMIC ANALYSIS IS AS PER CLAUSE 5.2 OF IS-1893-2002.
WEIGHT OF CONTAINER WITH WATER & WITHOUT LIVE LOAD =
5527404 280899 164777
WEIGHT OF STAGING =
637763 +
335700 + (
12 *
24399 )
EQUIVALENT MASS WHEN TANK FULL
5081728 + 1266251 / 3
EQUIVALENT MASS WHEN TANK EMPTY
5503812 321.7 * 9800

5081728 N.
1266251 N.

5503812 N.

2351152 N.

LENGTH OF COLUMN c/c BETWEEN BRACE =


3.342 m.
20.05 / (
5 + 1
)
MOMENT OF INERTIA OF COLUMN SECTION -I = 2265.677
x10E-6
m^4
MODULUS OF ELASTICITY OF CONCRETE =
25000 N/sqm.
5000 * (
25 )^0.5 * 1000000
x10E+6
STIFFNESS OF A COLUMN = 20758921
12 *
25000 * 2265.677 /
3.342 ^3
EQUIVALENT SPRING OF THE SYSTEM - K = 27.67856
20758921 *
8 / (
5
+
1 )
x10E+6
FUNDAMENTAL PERIOD T = 2 * PI * (W/K.g)^.5
ACCELERATION DUE TO GRAVITY

9.81 N/sec^2

IMPORTANCE FACTOR

1.5

SEISMIC ZONE NUMBER

SEISMIC ZONE FACTOR

0.1

SOIL FOUNDATION SYSTEM FACTOR

PERCENTAGE DAMPING

5 %

TIME PERIOD WHEN TANK IS EMPTY

0.5847 Sec.

TIME PERIOD WHEN TANK IS FULL

0.8946 Sec.

AVERAGE ACCELERATION COEFFICIENT WHEN TANK IS EMPTY - Sa/g = 0.151912


AVERAGE ACCELERATION COEFFICIENT WHEN TANK IS

FULL - Sa/g =

0.11754

MAXIMUM SEISMIC FORCE WHEN TANK IS EMPTY


0.1 *
1.5 * 0.151912 * 2351152
MAXIMUM SEISMIC FORCE WHEN TANK IS FULL
0.1 *
1.5 * 0.11754 * 5503812
HENCE TANK FULL CONDITION IS MOST CRITICAL

53575 N.

97038 N.

HEIGHT OF CENTRE OF GRAVITY OF TANK ABOVE BOTTOM OF COLUMNS


20.050 +
4.110

24.160 m.

SIESMIC TABLES
=================================================================================
S.NO. OF SEISMIC LEVER ARM B.M. IN AXIAL
DIRECT
TOTAL
DIRECT
ALLOWABLE
PANEL
FORCE ON UPTO MID- PANEL
THRUST
AXIAL
AXIAL
COMP.
COMP.
FROM TOP CONTAINER POINT OF DUE TO IN PANEL THRUST
LOAD
STRESS
STRESS
PANEL
SEISMIC DUE TO
IN A
IN A
IN A
WITH
FORCE
B.M.
COLUMN
COLUMN
COLUMN
SEISMIC
FORCE
N.
N.
N-m.
N.
N.
N.
N/sqmm. N/sqmm.
--------------------------------------------------------------------------------1
97038
5.481
531865
43956
648504
692460
3.961
8.000
2

97038

8.823

856166

70758

670186

740944

4.238

8.000

97038

12.165

1180467

97559

691868

789427

4.516

8.000

97038

15.507

1504768

124361

713550

837911

4.793

8.000

97038

18.849

1829069

151163

735232

886395

5.07

8.000

6
97038
22.191 2153370
177964
756914
934878
5.348
8.000
=================================================================================
=====================================================================================
S.NO. OF DIRECT
SHEAR
BENDING COMP.
ALLOWABLE COMP.
ALLOWBLE SIGMA-CC"/
PANEL
AXIAL
PER
MOMENT
STRESS
COMP.
STRESS
COMP.
SIGMA-CC
FROM TOP THRUST
COLUMN
IN THE
DUE TO
STRESS
DUE TO
BENDING
+
IN A
DUE TO
COLUMN
VERTICAL WITH
BENDING STERSS
SIGMACOLUMN
SEISMIC
LOADS
SEISMIC MOMENT
WITH
CBC" /
LOAD
FORCE
SEIS.LOAD SIGMAN.
N.
N-m.
N/sqmm. N/sqmm. N/sqmm. N/sqmm. CBC
------------------------------------------------------------------------------------1
648504
19408
26608
3.71
8.000
2.642
11.333
0.697
2

670186

19408

26608

3.834

8.000

2.642

11.333

0.712

691868

19408

26608

3.958

8.000

2.642

11.333

0.728

713550

19408

26608

4.082

8.000

2.642

11.333

0.743

735232

19408

26608

4.206

8.000

2.642

11.333

0.759

756914

19408

26608

4.33

8.000

2.642

11.333

0.774

=====================================================================================
DESIGN OF BRACES
================
GRADE OF CONCRETE- M-

25
BREADTH OF BRACE- B5

0.300 m.

DEPTH OF BRACE- D5

0.600 m.

LET THE NUMBER OF BRACES

- m

LENGTH OF A BRACE BETWEEN c/c OF COLUMNS


6.05 * Sin(PI/N)

2.315 m.

CLEAR LENGTH OF A BRACE


2.315 0.450
ANGLE OF COLUMN WITH BENDING AXIS FOR
MAXIMUM VALUE
OF
BENDING
MOMENT

1.865 m.

BENDING MOMENT COEFFICIENT


SHEAR FORCE COEFFICIENT

5 Nos.

= 0.432492 radians.
= 0.428233
= 0.359265

=================================================================================
S.NO. OF S.NO. OF SHEAR PER SHEAR PER MAX. MOMENT
DESIGN
DIA OF
NOS. OF
PANEL
BRACE
COLUMN
COLUMN
SHEAR IN BRACE BENDING BARS
BARS
FROM TOP DUE TO
DUE TO
FORCE
MOMENT
CHOOSEN PROVIDED
WIND
SEISMIC
PER
AT TOP
FORCE
FORCE
COLUMN
AND BOTT.
N.
N.
N.
N-m.
N-m.
mm.
Nos.
--------------------------------------------------------------------------------1
18809
19408
19408
1
59583
64840
12
2
2
22225
19408
22225
16
1
2
68990
75077
12
1
3
25981
19408
25981
16
2
3
79740
86776
12
0
4
29736
19408
29736
16
3
4
90489
98473
20
1
5
33492
19408
33492
16
2
5
101239
110172
20
2
6
37247
19408
37247
16
1
=================================================================================
=================================================================================
S.NO. OF TOTAL
NOMINAL % STEEL ALLOWABLE DESIGN DIA OF
SPACING SPACING
BRACE
SHEAR
SHEAR
SHEAR
SHEAR
TWO
REQUIRED PROVIDED
FROM TOP FORCE
STRESS
STRESS
FORCE
LEGGED
STIRRUPS
N.
N/sqmm.
%
N/sqmm.
N
mm.
mm c/c
mm c/c
--------------------------------------------------------------------------------1
49987
0.306 0.237364
0.194
18278
8
688
300
2

57879

0.355 0.286233

0.232

20074

627

300

66897

0.41 0.335103

0.247

26602

473

300

75916

0.465 0.397935

0.267

32314

389

300

5
84934
0.52 0.460766
0.287
38026
8
331
300
=================================================================================

DESIGN OF FOUNDATION RING BEAM


==============================
GRADE OF CONCRETE :- M- 25
LET THE BREADTH OF FOUNDATION BEAM - B4

0.450 m.

LET THE DEPTH OF FOUNDATION BEAM - D4

0.900 m.

EFFECTIVE SPAN IF TREATED AS DEEP BEAM - Lef =

2.215 m.

Leff / D4
SO DESIGN THE

2.461

<

2.5

BEAM AS A DEEP BEAM

TOTAL LOAD TRANSFERRED BY THE COLUMNS

LOAD PER METER LENGTH W4 =


6793655 /
6.05 / PI
w4*R^2*2*ANG =
357436 * (
6.05 / 2 )^2 * 2 * PI/N
AREA OF SIDE FACE REINFORCEMENT REQD. @
0.1 % =
0.1 *
0.450 * 1000000 *
0.900 / 100
IF USING

10 mm.DIA BARS NOS. OF BARS REQD. ON EITHER FACE =


405 / 2 / ( PI/4 *
10 *
10 )
NOS. OF BARS PROVIDED ON EITHER FACE

6793655 N.
357436 N/m.
2568851
405 sqmm.
2.58 Nos.
3 Nos.

=================================================================================
S.
PARAMETER
SUPPORT
MID
POINT OF UNIT OF
NO.
SPAN
MAXIMUM MEASURETORSION MENT
--------------------------------------------------------------------------------1.DIA OF BARS USED FOR B.M. & TORSION
20
20
20 mm.
2.ALLOWABLE STRESS

230

230

230 N/sqmm.

3.LEVER ARM

713

713

713 mm.

4.COEFFICIENT FOR BENDING MOMENT

0.0660

0.0330

5.BENDING MOMENT

169544

84772

0.0000

0.0000

12844 N-m.

22666 N-m.

169544

84772

22666 N-m.

1034

517

138 sqmm.

797

797

797 sqmm.

6.COEFFICIENT FOR TORSION


7.TORSION

8.MT = T x (1+D3/B3) / 1.7


9.EQUIVALENT B.M.-

Meq = M + MT

10.AREA OF STEEL REQUIRED


11.MIN.AREA OF STEEL REQD.- 0.85*b*d/fy

0
0 N-m.
0.0050

12.NOS. OF BARS

REQUIRED FOR

" Meq "

3.29

2.54

2.54 Nos.

13.NOS. OF BARS

PROVIDED FOR

" Meq "

3 Nos.

14.AREA OF STEEL PROVIDED FOR


15.SHEAR FORCE

" Meq "

16.SHEAR DUE TO TORSION - 1.6 * T/B4


17.EQUIVALENT SHEAR FORCE
18.NOMINAL SHEAR STRESS

19.PERMISSIBLE SHEAR STRESS


20.DIA

OF

Veq

TAUc

2 LEGGED STIRRUPS

21.SPACING REQUIRED
22.MAXIMUM PERMISSIBLE SPACING

1257

942

942 sqmm.

424603

245326 N.

45668 N.

424603

290994 N.

1.123

0.77 N/sqmm.

0.254

0.205

0.205 N/sqmm.

10

10

10 mm.

92

315

142 mm.

300

300

300 mm.

23.SPACING PROVIDED
90
300
140 mm.
--------------------------------------------------------------------------------(

LEVER ARM
+
0.9 * 1.5 ) * 0.2 * 1000
DEPTH OF TENSION ZONE NEAR TOP FACE
0.2 *
0.900 * 1000
FRACTION OF STEEL REQUIRED
0.5 * (
2.215 /
0.9
- 0.5 )

713 mm.

180 mm.

2.215

4
REMAINING BARS TO BE PROVIDED IN
SIDE OF THE MID DEPTH OF THE BEAM.

NOS. OF BARS PROVIDED


* 0.980555 + 1
0.270 m.ON EITHER

= 0.980555

4 Nos.

DESIGN OF FOUNDATION
====================
GRADE OF CONCRETE- MGRADE OF STEEL

25

HYSD

SIGMAcbc =

8.5 N.sqmm.

k =0.289026

SIGMA st =

230 N.sqmm.

j =0.903657

m =

11

R =1.110018

LET THE BREADTH OF FOUNDATION BEAM - B4

0.450 m.

LET THE DEPTH OF FOUNDATION BEAM - D4

0.900 m.

TOTAL LOAD AT COLUMN BASE

6793655 N.

SELF WEIGHT OF FOUNDATION BEAM =


192442 N.
PI * Do * B4 * D4 * 25000
--------TOTAL------> 6986097 N.
ADDING 10 % FOR SELF WEIGHT OF

FOUNDATION

698610 N.
--------TOTAL LOAD------> 7684707 N.

SAFE BEARING CAPACITY OF THE SOIL - SBC


AREA OF FOUNDATION REQUIRED
7684707 /
93
/
1000

93 KN/sqm.

= 82.63125 sqm.

CENTRAL RADIUS OF RAFT

3.025 m.

PROVIDE OUTER RADIUS OF RAFT

5.325 m.

PROVIDE INNER RADIUS OF RAFT

0.725 m.

AREA OF RAFT PROVIDED


5.325 ^20.725 ^2 )
MOMENT OF INERTIA OF RAFT
PI / 4 * (
5.325 ^4+
0.725 ^4 )
SECTION MODULUS OF RAFT
631.2757 /
5.325
MOMENT OF WIND FORCES AT THE BASE OF RAFT
PI * (

= 87.43052 sqm.
> 82.63125 SO O.K.
= 631.2757 m^4
= 118.5494 m^3
=

3321253 N-m.

MOMENT OF SEISMIC FORCES AT THE BASE OF RAFT

2431772 N-m.

PRESSURE ON SOIL DUE TO WIND LOAD


3321253 / 118.5494
PRESSURE ON SOIL DUE TO SEISMIC LOAD
2431772 / 118.5494
PRESSURE ON SOIL DUE TO DIRECT LOAD
7684707 / 87.43052
MAXIMUM PRESSURE WHEN WIND OR SEISMIC LOADS ARE CONSIDERED
28016 +
87895
ALLOWABLE INCREASED PRESSURE ON THE SOIL
93 * 1000 * 1.25
UNIFORMLY DISTRIBUTED LOAD BELOW FOUNDATION - w
6986097 / 87.43052

28016 N/sqm.

20513 N/sqm.

87895 N/sqm.

115911 N/sqm.

=
>
=

116250 N/sqm.
115911 SO SAFE
79905 N/sqm.

TAKING UNIT LENGTH OF THE FOOTING, CANTILEVER LEG =


{(
5.325 0.725 ) 0.45 } / 2
CONSIDERING 1 - m.WIDE SECTOR, MOMENT AT OUTER FACE OF BEAM =
79905 * (
5.325 ^3/
3.250 /3+
3.250 ^2/6 5.325 ^2/2)
EFFECTIVE DEPTH REQD. =
( 245239 / 1.110018 )^0.5

2.075 m.
245239 N-m/m.
470 mm.

PROVIDE OVERALL THICKNESS

600 mm.

THICKNESS AT THE FREE END

300 mm.

IF USING 16 mm.DIA RADIAL BARS, EFFECTIVE DEPTH PROVIDED


600 50 16 / 2
AREA OF STEEL REQUIRED
245239 * 1000 / 230 / 0.9025 /
542
MINIMUM AREA OF STEEL REQUIRED @ 0.12 %
0.12 / 100 *
600 *
1000
IF USING 16 mm.DIA RADIAL BARS, SPACING OF BARS REQUIRED

=
>
=

542 mm.
470 SO O.K.
2177 sqmm/m.

720 sqmm/m.

92.36 mm. c/c

PROVIDE
16 mm. DIA RADIAL BARS @
90 mm.c/c AT OUTER FACE OF RINGBEAM
CURTAIL ALTERNATE RADIAL BARS AT R =
1650 mm.
AND
R =
4400 mm.
AREA OF DISTRIBUTION STEEL REQUIRED @ 0.12 % =
2241 sqmm/m.
(
5.325 0.725 0.450 )*(
0.600 +
0.300 )/2*0.12/100
IF USING 12 mm. DIA DISTRIBUTION BARS, Nos OF BARS REQD.
PROVIDE 12 mm.

19.81 Nos.

DIA 10 Nos DISTRIBUTION BARS IN EACH LEG.

CHECK FOR PUNCHING SHEAR


-----------------------DISTANCE OF CRITICAL SECTION FROM BEAM EDGE
542 / 2
TOTAL SHEAR FORCE

271 mm.

TOTAL AREA UNDER SHEAR

SHEAR STRESS

0.257 N/sqmm.

PERMISSIBLE SHEAR STRESS


0.16 * 25 ^0.5

=
<

0.800 N/sqmm.
0.257 SO SAFE

DISTANCE OF CRITICAL SECTION FROM BEAM EDGE

CONSIDERING A SECTOR AT A DISTANCE "d" - TOTAL SHEAR FORCE

AREA UNDER SHEAR AT OUTER CRITICAL SECTION

SHEAR STRESS AT OUTER CRITICAL SECTION

0.239 N/sqmm.

% STEEL AT OUTER CRITICAL SECTION

0.290 %

PREMISSIBLE SHEAR STRESS AT OUTER CRITICAL SECTION

SELF WEIGHT OF FOUNDATION EXCLUDING THE PART OF BEAM

=
<

5479522 N.
21.319 sqm.

CHECK FOR BEAM SHEAR


-------------------542 mm.
630660 N.
2639381 sqmm.

0.243 N/sqmm.
SO SAFE
283959 N.
698610 SO OK.

CHECK FOR OVERTURNING


--------------------TOTAL OVERTURNING MOMENTS - Mo =

3321253 N-m.

TOTAL RESTORING MOMENTS WHEN TANK IS EMPTY- Mr = 22949887 N-m.


Mr / Mo
*********************

=
>

6.91
2.50 SO SAFE

DESIGN OF STAIRS
================
GRADE OF CONCRETE- MGRADE OF STEEL

25

HYSD

SIGMAcbc =

8.5 N.sqmm.

k =0.289026

SIGMA st =

230 N.sqmm.

j =0.903657

m =

11

R =1.110018

HEIGHT OF BOTTOM OF CURVED RING BEAM ABOVE GROUND LEVEL


20.000 1.050

18.950 m.

CLEAR HORIZONTAL DISTANCE BETWEEN COLUMNS

1.865 m.

TREAD

0.260 m.

RISE

0.175 m.

NOS. OF TREADS IN A FLIGHT


1.865 / 0.25
NOS. OF RISERS IN A FLIGHT
7 + 1

7 Nos.

8 Nos.

TOTAL RISE IN A FLIGHT


0.175 *
8

1.400 m.

SLANT LENGTH
1.865 ^2
)^0.5

2.332 m.

ASSUME THICKNESS OF WAIST SLAB

0.100 m.

ASSUME WIDTH OF WAIST SLAB

0.900 m.

WEIGHT OF WAIST SLAB PER HORIZONTAL METER


0.100 *
2.332 /
1.865 * 25000

2813 N/sqm.

WEIGHT OF STEPS PER HORIZONTAL METER


0.900 *
0.175 / 2 * 25000

1969 N/sqm.

0.900

1.400 ^2+

LIVE LOAD PER HORIZONTAL METER =


4500 N/sqm.
5000 *
0.900
--------TOTAL------->
9282 N/sqm.
MAXIMUM BENDING MOMENT AT CENTRE

USING

3228

3228 N-m.

57 mm.

DEPTH AVAILABLE
8 / 2
- 30

=
>

66 mm.
57 SO O.K.

AREA OF STEEL REQUIRED


/
66 * 1000

9282

3228

EFFECTIVE DEPTH REQUIRED


/ 1.110018 /
0.900 )^0.5

(
mm.

1.865

DIA BARS EFFECTIVE


1000 *
0.100 230

/ 0.903657

1.865

10

235 sqmm.

235

( PI / 4

NOS. OF BARS REQUIRED


*
64 )
NOS. OF BARS PROVIDED

AREA OF DISTRIBUTION STEEL REQUIRED @


0.12 *
0.1 *
PROVIDE

8 mm.

DIA

DIST.

BARS

4.68 Nos.

5 Nos.

0.12 % =
10000

120 sqmm.

250 mm. c/c

LANDING SLAB
============
ASSUME THE THICKNESS OF LANDING SLAB

0.150 m.

LOAD FROM FLIGHT OF STAIRS


9282 *
1.865

17311 N.

SELF WEIGHT OF LANDING SLAB


0.900 *
0.150 * 25000

3037.5 N.

0.900

LIVE LOAD ON LANDING SLAB =


4050 N.
0.900 *
0.900 *
5000
--------TOTAL------>
24399 N.
BENDING MOMENT
0.900 / 2

EFFECTIVE DEPTH REQUIRED


/ 1.110018 /
0.900 )^0.5

105 mm.

DEPTH AVAILABLE
10 / 2 30

=
>

115 mm.
105 SO O.K.

AREA OF STEEL REQUIRED


/
115 * 1000

459 sqmm.

NOS. OF BARS REQUIRED


*
100 )

24399
(
USING 10

10980

10980

mm. DIA BARS EFFECTIVE


0.150 *
1000 230

/ 0.903657

459

( PI / 4

PROVIDE 10 mm. DIA BARS

10980 N-m.

5.84 Nos.

6 Nos.

LEVEL OF FIRST FLIGHT

0.000

HEIGHT GAINED IN ONE FLIGHT


8 *
0.175

1.400 m.

TOTAL NOS. OF FLIGHTS PROVIDED

LEVEL OF LAST FLIGHT


12.000 +
0.000

16.800 m.

HEIGHT LEFT BELOW LOWER EDGE OF BOTTOM RING BEAM

2.150 m.

1.400

12 Nos.

18.950

16.800

LEVEL OF BALCONY
1.050 +
1.250

21.250 m.

HEIGHT OF LADDER PORTION


21.25 16.8

4.450 m.

18.950

*********************

CONTINUITY ANALYSIS
===================

JUNCTION:- TOP DOME, RING BEAM & WALL (TOP JOINT)


===================================================
TOP DOME
--------1) U.D.L. ON DOME
(w1)
2) RADIOUS
(R1)
3) THICKNESS
(t1)
4) SEMICENTRAL ANGLE
(x1)
5) RISE OF THE DOME
(h1)
6) ALPHA1t = (3 x (R1/t1)^2 )^.25
(ALPHA1)
7) K1t = 1 - Cot(x1) / 2 / ALPHA1
(K1)
CYLINDRICAL WALL
---------------1) CENTRAL DIAMETER
2) THICHNESS
3) HEIGHT
4) ALPHAt = (12 / (D+t3)^2 / t3^2 )^.25
5) Zt = E x t3^3 /12
TOP RING BEAM
------------1) BREADTH
2) DEPTH
3) RADIOUS

=
7750 N/sqm.
=
7.708 mt.
=
0.150 mt.
= 0.623412 radians
=
1.450 mt.
= 9.434209
= 0.926295

(D+t3) =
9.250 mt.
(t3) =
0.250 mm.
(H) =
4.250 mt.
= 1.223923
= 0.001302 E

(B1) =
(D1) =
(D+B1)/2 =

0.300 m.
0.300 m.
4.650 m.

JUNCTION:- WALL, MIDDLE RING BEAM & CONICAL DOME (MIDDLE JOINT)
================================================================
.
CYLINDRICAL WALL
---------------1) CENTRAL DIAMETER
(D+t4) =
9.250 mt.
2) THICHNESS
(t4) =
0.250 m.
3) HEIGHT
(H) =
4.250 m.
4) ALPHA = (12 / D^2 / t4^2 )^ .25
= 1.223923
5) Z = E x t4^3 /12
= 0.001302
MIDDLE RING BEAM
---------------1) BREADTH
2) AVERAGE DEPTH
3) RADIOUS

(B2) =
(D2) =
(D+2xt4+B2)/2 =

CONICAL DOME
-----------1) DIAMETER AT THE TOP
(D+t5)
2) DIAMETER AT THE BOTTOM
(Dcn+t6)
3) SLANT LENGTH MEASURED FROM VERTEX OF CONE (L)
4) THICKNESS AT THE TOP
(t5)
5) ANGLE OF CONE WITH VERTICAL
(xo)
6) HOOP TENSION AT THE TOP
(Ht)
7) MERIDIONAL THRUST AT TOP
(Mt)
8) DELTA = (12 x Cot^2(xo) / t5^2 )^.25
(DELt)
9) Zt = 2 x DELt x L^0.5
(Zt)

0.900 m.
0.225 m.
5.200 m.

=
9.250
=
6.750
=
6.541
=
0.250
=
0.7854
=
293185
=
84323
= 3.722412
= 19.04042

m.
m.
m.
m.
radians.
N/m.
N/m.

10)
11)
12)
13)

K1
K2
K3
K4

(K1)
(K2)
(K3)
(K4)

= 1180.004
=
86.4
=
86.4
=
13.009

JUNCTION:- BOTTOM DOME, BOTTOM RING BEAM & CONE (BOTTOM JOINT)
===============================================================
BOTTOM DOME
----------1) U.D.L. ON DOME
2) RADIOUS
3) THICKNESS
4) SEMICENTRAL ANGLE
5) RISE OF THE DOME
6) ALPHA2b = (3 x (R2/t2)^2 )^0.25
7) K2b = 1 - Cot(x2) / 2 / ALPHA2b
BOTTOM RING BEAM
---------------1) BREADTH
2) DEPTH
3) RADIOUS

(w2)
(R2)
(t2)
(x2)
(h2)
(ALPHA2)
(K2)

=
53066 N/sqm.
=
6.356 mt.
=
0.200 mt.
= 0.456187 radians
=
0.650 mt.
= 7.419203
= 0.862662

(B3) =
(D3) =
(Do/2) =

CONICAL DOME
-----------1) DIAMETER AT THE TOP
(D+t5)
2) DIAMETER AT THE BOTTOM
(Do+t6)
3) SLANT LENGTH MEASURED FROM VERTEX OF CONE (L")
4) THICKNESS
(t6)
5) ANGLE OF CONE WITH VERTICAL
(xo)
6) HOOP TENSION AT THE BOTTOM
(Hb)
7) MERIDIONAL THRUST AT BOTTOM
(Mb)
8) DELTAb=(12 x Cot^2(xo) / t6^2)^0.25
(DELb)
9) Zb = 2 x DELb x L^.5
(Zb)
10) K1"
(K1")
11) K2"
(K2")
12) K3"
(K3")
13) K4"
(K4")

0.450 mm.
1.050 mm.
3.025

=
9.250
=
6.750
=
4.773
=
0.250
=
0.7854
=
268048
=
239927
= 3.722412
= 16.26485
= 768.258
=
65.61
=
65.61
=
11.608

m.
m.
m.
m.
radians.
N/m.
N/m.

Continued....

TOP JOINT
========================================================================
AREA
CLOCKWISE DISPLAC- THRUST MOMENT
NET HOOP
MEMBER :
OF
ROTATION EMENTS
BORNE
TENSION
MEMBER
(NET)
(NET)
(sqm.) (rad./E) (met./E) (Newtons)(Nm/m.)
-----------------------------------------------------------------------TOP DOME:

0.150

-278185

1741918

11814

-2906

TOP BEAM:

0.09

186815

1276003

5311

0.250

-651697

1276003

9642

2901

WALL

41384

(New/m.)

24697 (Newtons)
68973

(New/m.)

========================================================================
TOTAL--->
26768
0
MIDDLE JOINT
========================================================================
AREA
CLOCKWISE DISPLAC- THRUST MOMENT
NET HOOP
MEMBER :
OF
ROTATION EMENTS
BORNE
TENSION
MEMBER
(NET)
(NET)
(sqm.) (rad./E) (met./E) (Newtons) (Nm/m.)
-----------------------------------------------------------------------WALL
:
0.25 -1188505 1494230
18905
-9617
273400 (New/m.)
MID.BEAM:

0.2025

-349993

5057908

37878

-11

221454 (Newtons)

CONE
:
0.25 2332789 -366014
4850
4875
273400 (New/m.)
========================================================================
TOTAL--->
61633
-4753
BOTTOM JOINT
========================================================================
AREA
SLOPE
DISPLAC- THRUST MOMENT
NET HOOP
MEMBER :
OF
EMENTS
BORNE
TENSION
MEMBER
(NET)
(NET)
(sqm.) (rad./E) (met./E) (Newtons) (Nm/m.)
-----------------------------------------------------------------------CONE

0.2500

2300606 -3433726

-71470

24173

BOT.BEAM:

0.4725

-803497

-12233

-10234

184922

13698

(New/m.)

25889 (Newtons)

BOT.DOME: 0.2000
-71454 2892251
73613
-13939
10958 (New/m.)
========================================================================
TOTAL---> -10090
-0

******************

G-SCHEDULE
==========
S.R. 300 K.L.- 20 m.STAGING & 93 K.N./Sqm. S.B.C.
July'2009 BSR
================================================================================
S.NO.
PARTICULARS
BSR QUANTITY UNIT RATE
AMOUNT
ITEM
Rs.
-------------------------------------------------------------------------------1. Earthwork in excavation over
R
areas (exceeding 30 cm in depth,
1.5 m. in width as well as 10 Sqm
on plan) including disposal of
excavated earth lead upto 50 m
and lift upto 1.5 m, disposed
earth to be levelled and neatly
dressed.
B-2
Hard rock (Blasting prohibited)
1.7.3
183.6 Cum.
472.00
86659.20
2.

3.

4.

Banking excavated earth in layers


not exceeding 20 cm. in depth
breaking clods, watering, rolling
each layer with 0.5 tonne roller,
or stone or steel rammers, and
rolling every third and topmost
layer with power roller of 8-10 T
& dressing up in embankments for
roads, flood banks, mariginal
banks & guide banks etc, lead upto
50 Mtr. and lift upto 1.5 Mtr.
All kinds of soil

B-1
1.3 &
1.4
139.008 Cum.

Providing & laying cement conc.


including curing,compaction etc.
complete in specified grade
excl. cost of centring & shuttering. All work upto plinth level
1:2:4 (1 cement : 2 course sand :
4 graded stone aggregate 20 mm)

B-15
3.2.3

Providing & laying in position


specified grade of RCC incl.
curing, compaction, finishing with
rendering in cement sand mortar
1:3 (1 cement : 3 coarse sand
and making good the Joints excl.
the cost of centring and shuttering
and reinforcement. All work upto
plinth level 1 : 1 : 2
(1 cement : 1 coarse sand : 2
graded stone aggregate 20 mm.
nomonal size.
B-20

8.743 Cum.

60.00

8340.48

2157.00

18858.65

Foundation Beam
Foundation Slab
5.

Top dome
Deductions

4.1.1
4.1.1

a) For ventilator
b) For manhole
B-21
4.5

7.698 Cum.
35.495 Cum.

3152.00
3152.00

24264.10
111880.24

10.534
-0.095
-0.054
-----10.385

2701.00

28049.89

Cum.
Cum.
Cum.
Cum.

================================================================================
S.NO.
PARTICULARS
BSR QUANTITY UNIT RATE
AMOUNT
ITEM
Rs.
-------------------------------------------------------------------------------Top ring beam
4.3.2
2.630 Cum. 3310.00
8705.30
Tank wall
4.2.1
30.876 Cum. 3224.00
99544.22
Balcony Beam
4.3.2
6.616 Cum. 3310.00
21898.96
Cone Wall
4.2.1
11.109 Cum. 3224.00
35815.42
Bottom Ring Beam
4.3.2
8.981 Cum. 3310.00
29727.11
Bottom Dome
4.5
5.192 Cum. 2701.00
14023.59
Columns
4.2.1
25.511 Cum. 3224.00
82247.46
Braces
4.3.2
13.428 Cum. 3310.00
44446.68
Stairs & landing
4.3.2
5.888 Cum. 3310.00
19489.28
TOTAL 163.809 Cum.
5. Add extra for RCC work above
floor three level...
B-22
i) Top dome
4.8
150.00
1557.75
ii) Top ring beam
4.8
150.00
394.5
iii) Tank wall
4.8
150.00
4813.02
iv) Balcony Beam
4.8
150.00
992.4
v) Cone Wall
4.8
150.00
1666.35
vi) Bottom Ring Beam
4.8
150.00
1347.15
vii) Bottom Dome
4.8
150.00
778.8
viii Columns
4.8
25.00
693.45
ix) Braces
4.8
25.00
335.75
x) Stairs & landing
4.8
25.00
110.48
6.

Centring and shuttering with


plywood or steel sheets including struting,propping,bothways with wooden member and
removal of formwork for
superstructure upto 4.5 m.
height above plinth level
for :

i) Top dome
ii) Top ring beam - vertical
-horizontal
iii) Tank wall
iv) Balcony Beam - vertical
-horizontal
v) Cone Wall
vi) Bottom Ring Beam
vii) Bottom Dome
viii Columns

B-22
4.12.6
4.12.2
4.12.2
4.12.1
4.12.2
4.12.2
4.12.1
4.12.2
4.12.5
4.12.3

70.22
17.53
1.45
247.01
7.99
29.41
88.87
38.96
25.96
226.76

sqm.
sqm.
sqm.
sqm.
sqm.
sqm.
sqm.
sqm.
sqm.
sqm.

450.00
135.00
135.00
129.00
135.00
135.00
129.00
135.00
347.00
157.00

31599.00
2366.55
195.75
31864.29
1078.65
3970.35
11464.23
5259.60
9008.12
35601.32

ix) Braces
x) Foundation Beam
xi) Foundation Slab - vertical
xii) Stairs

4.12.2
4.11
4.11

111.90 sqm.
11.40 sqm.
10.04 sqm.

135.00
75.00
75.00

15106.50
855.00
753.00

-waist & steps 4.12.2


-landings
4.12.2

45.90 sqm.
9.72 sqm.

135.00
135.00

6196.50
1312.20

679.42 sqm.

16.00

10870.72

49.00

3440.78

7.

Add extra for circular work

4.12.12

8.

Add extra over item 4.12 to 4.12.11


for each subsequent storey
i) Top dome
4.12.15

================================================================================
S.NO.
PARTICULARS
BSR QUANTITY UNIT RATE
AMOUNT
ITEM
Rs.
-------------------------------------------------------------------------------ii) Top ring beam
4.12.15
49.00
930.02
iii) Tank wall
4.12.15
49.00
12103.49
iv) Balcony Beam
4.12.15
42.00
1570.80
v) Cone Wall
4.12.15
42.00
3732.54
vi) Bottom Ring Beam
4.12.15
42.00
1636.32
vii) Bottom Dome
4.12.15
42.00
1090.32
viii Columns
4.12.15
35.00
418.11
ix) Braces
4.12.15
42.00
1566.60
x) Stairs
4.12.15
42.00
1362.69
TOTAL LABOUR CHARGES- 208043
9. Providing and fabricating
steel reinforcement for
R.C.C. work including
cutting, bending,placing
in position and binding
comp. including cost of
binding wire in foundations and superstructure
upto 4.50 Mt.height above
plinth level. Thermo
mechanically treated
B-24
bars (Tata, Sail)
4.13.4
Reinforcement bars - (Tor)
Dia
Fe-415
--i) Top dome
Square mesh
8
Hoop bars
5 Nos.
8
Radial Bars
153 Nos.
8
ii) Top ring beam
Hoop bars
4 Nos.
16
Stirrups
98 Nos.
8
iii) Tank wall
Verticals Outer 153 Nos.
8
Inner 153 Nos.
8
Hoop bars
0 Nos.
8
21 Nos.
10
8 Nos.
12

Length
------

Weight
------

1003 mt.
123 mt.
252 mt.

391
48
98

117 mt.
98 mt.

185
38

714
432
0
610
232

278
168
0
378
206

mt.
mt.
mt.
mt.
mt.

iv) Balcony Beam


Hoop bars
v) Cone Wall
Hoop bars
Radial bars
Extra Radials
vi) Bottom ring beam
Hoop bars top
Curtailment
Hoop bars bott.
Curtailment
Stirrups
Side Face

9 Nos.

16

262 mt.

414

10 Nos.

16

327 mt.

517

32 Nos.
306 Nos.
158 Nos.

12
8
10

804 mt.
1005 mt.
209 mt.

716
392
130

4
0
3
0
129
8

20
20
20
20
10
10

Nos.
Nos.
Nos.
Nos.
Nos.
Nos.

76
0
57
0
361
152

mt.
mt.
mt.
mt.
mt.
mt.

188
0
141
0
224
94

================================================================================
S.NO.
PARTICULARS
BSR QUANTITY UNIT RATE
AMOUNT
ITEM
Rs.
-------------------------------------------------------------------------------vii) Bottom Dome
Square mesh
10
288 mt.
179
Hoop bars
5 Nos.
10
72 mt.
45
Radial Bars
136 Nos.
10
207 mt.
128
viii)Columns
Longitudinal
72 Nos.
12
1584 mt.
1410
Links
720 Nos.
8
837 mt.
326
ix) Braces
Longitudinal
0 Nos.
8
0 mt.
0
0 Nos.
10
0 mt.
0
6 Nos.
12
111 mt.
99
18 Nos.
16
333 mt.
526
6 Nos.
20
111 mt.
274
Stirrups
280 Nos.
8
448 mt.
175
Side Face
0 Nos.
10
0 mt.
0
x) Foundation Beam
Hoop bars top
3 Nos.
20
57 mt.
141
Curtailment
0 Nos.
20
0 mt.
0
Hoop bars bottom
4 Nos.
20
76 mt.
188
Curtailment
0 Nos.
20
0 mt.
0
Stirrups
134 Nos.
10
335 mt.
208
Side Face
6 Nos.
10
114 mt.
71
xi) Foundation raft
Radial bars
227 Nos.
16
827 mt.
1307
Dist. bars
20 Nos.
12
380 mt.
338
xii) Staircase
Waist slab
Longitudinal
5 Nos.
8
280 mt.
109
Distribution
120 Nos.
8
108 mt.
42
Landing
72 Nos.
10
97 mt.
60
--------ABSTRACT
10232
========
----------------------------------------

Dia
Weight
+ 10 %
Total
mm.
kg
wastage
kg
---------------------------------------6
0
0
0
8
2065
207
2272
10
1517
152
1669
12
2769
277
3046
16
2949
295
3244
20
932
93
1025
---------------------------------------10232
1024
11256 Kg.
---------------------------------------10. Add extra

for each subsequent ht. of 4.5 m.

48.00

4.14 0.22 L.S.

540288.00
6544.56

11. Steel work welded in built up


sections, trusses and frame work
including cutting and hoisting,
fixing in position and applying a

================================================================================
S.NO.
PARTICULARS
BSR QUANTITY UNIT RATE
AMOUNT
ITEM
Rs.
-------------------------------------------------------------------------------primer upto 4.5 Mtr height above
plinth level. In tees, angles,
flats and channels.
9.4 + 9.6
L.S
650 Kg.
47.70
31005.00
12. Providing and fixing G.I. pipe
(external work) with G.I. fittings
(IS:1239 Mark) incl. trenching
& refilling earth : 20 mm-Cl-B.

S-17/2.2.2
L.S.
230 m.

89.00

20470.00

13. Providing, lowering, laying in


trenches, aligning, fixing in
position double flanged (screwed
welded) centrifugally (spun)
ductile iron ISI marked K-9 grade
pipes as per IS:8329-2000.
Inlet- 200
Outlet- 250
Overflow- 250
Washout- 100

RUIDP BSR-16.5.
dia
31.30 m.
dia
26.10 m.
dia
31.30 m.
dia
26.10 m.

4240.00
5587.00
5587.00
2362.00

132712.00
145820.70
174873.10
61648.20

19772.00
25516.00
25516.00
9410.00

19772.00
25516.00
25516.00
9410.00

14. Providing & fixing in position


CI puddle collar (approx. 1 m length)
inside the wall incl. all material
labour as per technical specifications
and as per direction of Engineer
RUIDP BSR-16.28.
Inlet- 200 dia
1.00 No.
Outlet- 250 dia
1.00 No.
Overflow- 250 dia
1.00 No.
Washout- 100 dia
1.00 No.

15. Providing, lowering, laying, aligning,


fixing in position in pipeline, manually
operated CI D/F sluice valves of approved
make (IS:14846 amended uptodate) PN-1.0
class of following dia complete (excluding
jointing & jointing material) incl. all
material, labour, testing and commissioning
alongwith pipeline as per technical specifications and as per direction of Engineer
Class - B
RUIDP BSR-16.17.
Inlet- 200 dia
1.00 No.
Outlet- 250 dia
1.00 No.
Overflow- 250 dia
1.00 No.
Washout- 100 dia
1.00 No.

10399.00
17054.00
17054.00
3702.00

10399.00
17054.00
17054.00
3702.00

16. Providing, lowering, laying, aligning,


fixing in position at all level/depths
flanged stanard specials such as tees,
bends, tapers, caps etc. within trenches
in DI pipeline complete as per technical
specifications and as per direction of
Engineer. Specials flanged DI K-9
upto 300 mm dia.
RUIDP BSR 16.7.2.1

================================================================================
S.NO.
PARTICULARS
BSR QUANTITY UNIT RATE
AMOUNT
ITEM
Rs.
-------------------------------------------------------------------------------2000.00 Kg.
111.00 222000.00
17. Providing and fixing electronic water
level indicator with specified Nos of
level indications incl. P/F prons in
overhead tank, necessary cabling from
level indicating panel to prones in
overhead tank (upto 5 m length) in
proper manner as per specifications
and direction of Engineer, 5 level
indications and cabling upto a length
of 5 m.
RUIDP BSR-16.29.1
1.00 Each 10000.00
18. Providing and fixing of lightening
conductor final made of 25 mm. dia
300 mm. long copper tube having
single prong at top with 85 mm.
dia 3 mm. thick copper base plate
including holes etc. complete as
required.
E160100
19. Providing and fixing of copper
tape 20 mm. x 3 mm. thick on
parapet or on surface of wall
for lightening conductor as

1 Job

581.00

10000.00

581.00

required for horizontal runs. E160400


20. Plate earthing as per IS:3043 with
with copper earth plate of size
600mmx600mmx3.0mm by embodying 3 to 4 m
below the ground level with 20 mm
dia GI "B" class watering pipe incl.
all accessories....
E150300
21. Finishing wall with water proof
cement paint of approved brand &
manufacture and or reqd. shade to
give an even shade incl. scaffolding
New work(Three or more coats)B145-12.53.1
22. Plinth protection work a) Brick masonary in foundation
& plinth with bricks of class
designation 75 mm in:
Cement mortar 1:5 ( 1 cement :5
coarse sand)
B-5.1.5

30 mt.

212.85

6385.50

1 Each

4725.00

4725.00

699 Sqm.

35.00

24465.00

20.79 Cum.

1722.00

35800.38

================================================================================
S.NO.
PARTICULARS
BSR QUANTITY UNIT RATE
AMOUNT
ITEM
Rs.
-------------------------------------------------------------------------------b) Providing & laying cement conc.
including curing,compaction etc.
complete in specified grade
excl. cost of centring & shuttering. All work upto plinth level
1:2:4 (1 cement : 2 course sand :
B-15
4 graded stone aggregate 20 mm)
3.2.3 23.290 Cum. 2157.00
50236.53
-------------------------------------------------------------------------------TOTAL - 2437971.65
================================================================================