Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
*You are responsible for tracking your own grades. There should be no surprise as to how you are doing in the
class. Use this chart to keep track. Divide your total points by the possible points to get your percentage. Ex.
150/200 = 75% = C
* You must complete all parts of a project to receive points for the project. Late homework will receive 0 points
but must still be completed in order to receive any points for the completed project.
* 10 points will be deducted for each day a project is late.
* 1 absences = drop in letter grade. 2 absences = F
Ceramics I
Project Sketches/ Written Completed Project Your Total/
Maquettes Assignment Possible Pts
Handbuilding Skills X /200
Thrown Wall Proj X /250
Proposed Project /300
Research Paper X X /150
Test X X /50
Participation projects in on time, participation in crits and studio duties /50
Total X X X /1000