Sei sulla pagina 1di 2

MONTHLY CHECK LIST FOR STARTER PANEL

Equipment Name:
S. No

Month:
Description

Standard

Switch OFF the main incoming power supply

Check for the cleanliness of Starter Box

Remove any foreign material lying over the Starter Box

Remove

Clean the body with dry cloth

Dry cloth

Clean the Contactor bimetallic strips

Check the set Relay range and if required reset as per Motor
rated current

Check for the tightness of connections

Tighten

Check for proper earth connections

Tighten

Restore the power supply

10

Check the Voltage W.r.t Ph-Ph,Ph-N

11

Check the ON/OFF operation

12

Measure the Current and record

13

Clean the work place

Location:

OFF
Clean

CRC

ON
415 - 230 V
Normal

Clean
Date
Start time
End Time
Name of Technician
Verified By (Supr/Engr)

Note: All abnormalities noticed should be recorded in respective abnormality register

Date

Abnormality

Action taken

Status

Done by

MONTHLY CHECK LIST FOR DB'S


Equipment Name:
S. No

Equipment No:
Description

SMSB-LTG

Check for the cleanliness

Remove any foreign material lying over the panel

Use blower to blow dust (external)

Wipe the exterior with dry cloth(with out effecting the MCB/MCCB)

Check the door knobs/screws and operation

Check functioning of indication lamps

Check functioning of Meters

Month:
SMSB-RP

ZONE-LTG

Location:
ZONE-LTG

UDB-

USDB-1,2,3,4

If shut down is available follow the following


8

Tighten all the cable connections

Check for colour changes in termination points

10

Identification of ferruling/marking

11

Check earth connection

12

Replace the faulty indication lamps/meter or fuses

13

Check for the operation of ELCB/RCCB

14

Restore the feeders and check for the operation

15

Clear off the workplace from any leftout toole scrap


Date
Start time
End Time
Name of Technician
Verified By (Supr/Engr)

Date

Abnormality

Note: All abnormalities noticed should be recorded in respective abnormality register

Action taken

EM-SUB DB

Potrebbero piacerti anche