Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
PUMA ENERGY
Site location:
Project:
Document n:
167.04.12 LE601
Client Reference:
P-AGLBTT-LS-167.04.12-EL601
10-09-12
FOR APPROVAL
NM
GS
HM
Revision:
Date:
Issued for:
Executed by:
Checked by:
Approved by:
Approved by (Client):
This document and all its content are property of Projecto.Detalhe, Lda. Copies and reproductions are not allowed without proper authorization. Consult site www.projectodetalhe.com for more information.
Model 40 - Revision 2
Model 40
Revision 2
CLIENT:
PUMA ENERGY
SITE LOCATION:
PROJECT:
ELECTRICITY
Document :
LOAD IND.
TAG
NAME
167.04.12-LE-601/ P-AGLBTT-LS-167.04.12-EL601
LOAD
C-Continuous Load
P- Priority
I- Intermitt. Load
NP-Not
Priority
POWER
10-09-2012
NM
GS
HM
REVISION
DESCRIPTION
DATE
ISSUED
CHECKED
APROVED
STANDARD
CONNECTION
DIAGRAM
BOARD
NOTES:
Absorbed Power:
-pumps: Shaft power
-others: consumption in normal operation
CONSUMED POWER
ABSORBED
RATED
LOAD
[kW]
[kW]
[%]
FACTOR
cos
CONTINUE
INTERMITTENT
BUSBAR
STAND-BY
VOLTAGE
P-PROCESS
U-UTILITY
[kW]
[kVA]
[kW]
[kVA]
[kW]
[kVA]
[V]
P-2xx
BITUMEN PUMP
30,00
30,00
1,00
0,92
0,8
32,6
40,8
400
VFD
MCC
P-2xx
BITUMEN PUMP
30,00
30,00
1,00
0,92
0,8
32,6
40,8
400
VFD
MCC
P-7xx
15,00
15,00
1,00
0,92
0,8
16,3
20,4
400
SS
MCC
P-9xx
5,50
5,50
1,00
0,92
0,8
7,5
400
DOL
MCC
CP-1xx
COMPRESSOR
5,00
5,00
1,00
0,92
0,8
5,4
6,8
400
FEEDER
SB2.1
SB-xx
30,00
30,00
1,00
0,8
30
37,5
400
FEEDER
MCC
SB-xx
WHAREHOUSE SWITCHBOARD
25,00
25,00
1,00
0,8
25
31,3
400
FEEDER
MCC
SB-xx
COMPRESSOR'S SWITCHBOARDS
10,00
10,00
1,00
0,8
10
12,5
400
FEEDER
MCC
SB-xx
3,00
3,00
1,00
0,8
3,8
230
FEEDER
MCC
10
SB-xx
INSTRUMENTATION SWITCHBOARD
5,00
5,00
1,00
0,8
6,3
400
FEEDER
MCC
11
SB-xx
UTILITIES SWITCHBOARD
26,00
26,00
1,00
0,8
26
32,5
400
FEEDER
MCC
12
SB-xx
75,00
75,00
1,00
0,8
75
93,8
400
FEEDER
MCC
13
HOP-xxx
HOT-OIL PUMP
5,50
5,50
1,00
0,92
0,8
7,5
400
DOL
MCC
14
HOP-xxx
HOT-OIL PUMP
St
5,50
5,50
1,00
0,92
0,8
7,5
400
DOL
MCC
15
HOP-xxx
HOT-OIL PUMP
55,00
55,00
1,00
0,92
0,8
59,8
74,8
400
SS
MCC
16
HOP-xxx
HOT-OIL PUMP
St
55,00
55,00
1,00
0,92
0,8
59,8
74,8
400
SS
MCC
17
HOP-xxx
HOT-OIL PUMP
11,00
11,00
1,00
0,92
0,8
12
15
400
DOL
MCC
18
HOP-xxx
HOT-OIL PUMP
St
11,00
11,00
1,00
0,92
0,8
12
15
400
DOL
MCC
205,2
148,1
185,3
77,8
97,3
ST-Standby Load
NOTES
R
E
V
Future
LOAD BALANCE
TOTAL BT
FUTURE - TOTAL BT
TOTAL BT
NORMAL OPERATION
kW
kVAr
kVA
312,1
234,70
390,5
32,6
24,53
40,8
344,7
259,23
431,3
164
0
32,6
40,8
164
205,2
180,7
226,1
77,8
97,3
NOTES:
All consumers values and considerations presented should be considered as typical examples
2/2