Luminas Engineering Limited

Date: 25th January 2015

NOTICE
This is for general information for all concern departments that
ongoing project named as Proximity Sensor Development will be
modified within 23rd march 2015. For this reason all types of project
modification and implemented application will be suspended by 20 th
march 2015. Department head related with this project like System
Engineering, System Design, Application Modifier, and Project
coordination are warmly invited to participate a meeting which will be
conducted by C.E.O of Predevelopment and Executions on 15th
February 2015.

Deputy Secretary

Luminas Engineering Limited

Information of Meeting
Objective: Plan Development of Proximity Sensor Project
Location: Head Office Meeting Room
Date:

20th March 2015

Meeting Type: Plan Follow Up


Facilitator: Mr. Musa

Time: 11.00 Am to 2.00 PM

Note Taker: Mr. Ibrahim

Called by:

Time keeper: Mr. Zaman

Attendees: Mr. Abdur Rahman (HOD of System Engineering)


Mr. Imran (HOD of System Design)
Mr. Hasib (HOD of Application Modifier)
Mr. Attur Rahman (HOD of Project coordination)
Mr. Habibur Rahamn (CEO of Predevelopment and Executions)

Agenda:
Introductory Speech By Mr. Imran from 11.10 AM to 11.20AM
Project Analysis by Mr. Attur Rahman from 11.20AM to 12.00Pm
Plan for project development by Mr.Abdur Rahman from 12.00 PM to 12.40 PM
Plan Strategy development by Mr. Hasib from 12.40 PM to 1.00 10 PM
Plan Evaluation and decision making by Mr. Habibur Rahamn from 1.10 PM to
1.40 PM
Question Answer session from 1.40 Pm to 2.00 PM

Deputy Secretary