PRESUPUESTO BLOQUE DE 3 CASAS

AREA (M2):
350
ESTRUCTURA
33,935.40
ALBANILERIA
16,277.22
INSTALACIONES
12,617.45
ACABADOS
30,314.04
93,144.11

RubroNo
0314
0351
0315
0460
1028
0136
0187
0021
0354
1026
0640
1027
0638
0139
0095
0529
0229
0230
0228
0231
0233
0748
0310
0928
0020
0479
0134
0270
0492
0624
0752
0057
0739
0497
0226
0227
0247
0643
0056
0311
0018
0468
0393
0135
0016
0309

Rubro
Unidad Cant CostoU Rubro CostoMats CostoMdO
SALIDA DESAGUE 50 MM
Pto
33
13.42
244.86
198
SALIDA DESAGUE 75 MM
Pto
9
15.32
83.88
54
SALIDA DESAGUE 110 MM
Pto
9
18.98
116.82
54
SALIDA AL BAJANTE PVC
Pto
6
5
0
30
SALIDA A LA CAJA DE REVISION
Pto
9
5
0
45
TUBERIA PVC 50 MM DESAGUE
ML
48
3.59
148.32
24
TUBERIA PVC 75 MM DESAGUE
ML
24
3.52
70.08
14.4
TUBERIA PVC 110 MM DESAGUE
ML
48
4.8
192
38.4
BAJANTE PVC 110 MM
Ml
24
8.65
183.6
24
SALIDA AGUA CALIENTE 1/2 COBRE
U
27
27.99
485.73
270
SALIDA AGUA FRIA 1/2 TERMOFUSION
U
51
13.87
350.37
357
TUBERIA AGUA CALIENTE 1/2 COBRE
Ml
96
7.4
643.2
67.2
TUBERIA AGUA FRIA 1/2 TERMOFUSION
Ml
150
2.14
246
75
TUBERIA AGUA FRIA 3/4 PVC R H3
ML
27
2.41
55.62
9.45
ACOMETIDA ELECTRICA NO. 6 (4 LINEAS)
ML
60
6.34
366.6
13.8
CABLE SOLIDO NO. 10
ML
200
0.66
128
4
CABLE SOLIDO NO. 12
ML
900
0.45
387
18
CABLE SOLIDO NO. 14
ML
900
0.29
243
18
CABLE SOLIDO NO. 8
ML
100
1.11
109
2
CABLE TELEFONICO
ML
60
0.16
8.4
1.2
CABLE TIMBRE
ML
30
0.25
6.9
0.6
CAJA DE PASO 20X20X10 CM
U
9
14.31
56.79
72
CONMUTADOR SIMPLE
Pto
3
8.86
8.58
18
CONMUTADOR TRIPLE (1 CONMUTADOR + 2 INTERRUPTORES)
Pto
6
14.86
41.16
48
DESCARGA A TIERRA VARILLA COPPERWELT
U
3
30.18
30.54
60
INTERRUPTOR DOBLE
Pto
30
9.32
99.6
180
INTERRUPTOR MIXTO
Pto
9
8.92
26.28
54
INTERRUPTOR SIMPLE
Pto
12
8.06
24.72
72
INTERRUPTOR TRIPLE
Pto
3
12.39
13.17
24
LAMPARA APLIQUE EXTERIOR DECORATIVA
U
15
48
660
60
LAMPARA APLIQUE INTERIOR ACERO INOX
U
12
38
408
48
LAMPARA EMPOTRADA DE PISO EXTERIORES
U
3
54.42
151.26
12
LAMPARA EMPOTRADO DICROICO DE PARED INTERIORES
U
50 W9
13
81
36
MANGUERA REFORZADA 1
ML
60
0.31
0
18.6
MANGUERA REFORZADA 1/2
ML
450
0.14
54
9
MANGUERA REFORZADA 3/4
ML
100
0.02
0
2
PUNTO CITOFONO (DUCTO Y GUIA)
Pto
6
5.81
10.86
24
PUNTO DE ILUMINACION
U
180
14.78
1220.4
1440
PUNTO DE TIMBRE
Pto
3
13.39
28.17
12
PUNTO TELEFONICO
Pto
6
11.32
19.92
48
PUNTO TV CABLE
Pto
9
4.91
19.08
25.11
TABLERO DE BREAKER 6 PTOS
U
3
82.81
152.43
96
TABLERO DE BREAKER 8 PTOS
U
3
125.18
183.54
192
TIMBRE DIN DON
Pto
3
25.95
53.85
24
TOMACORRIENTE 220V (CON PLACA)
Pto
3
14.7
20.1
24
TOMACORRIENTE DOBLE 110V (CON PLACA)
Pto
102
12.43
451.86
816
TOTAL

CostoRubro
442.86
137.88
170.82
30
45
172.32
84.48
230.4
207.6
755.73
707.37
710.4
321
65.07
380.4
132
405
261
111
9.6
7.5
128.79
26.58
89.16
90.54
279.6
80.28
96.72
37.17
720
456
163.26
117
18.6
63
2
34.86
2660.4
40.17
67.92
44.19
248.43
375.54
77.85
44.1
1267.86
12,617.45

RubroNo
1041
1031
1032
1019
0183
1033
1034
1038
1035
1036
1037
1020
0843
1016
0304
0009
1030
1029

Rubro
Unidad Cant CostoU Rubro CostoMats
BARREDERA POSFORMADA LAMINADA DE 6 CM PARA PISO
MlFLOTANTE
151.4
3.16
293.62
CIELO FALSO DE GYPSUM NORMAL
M2
339.8
11.99 4074.56
CIELO FALSO DE GYPSUM TECHO PARA HUMEDAD
M2
32.85
15.54
510.49
DECKING DE TECA PRESERVADA
M2
20.4
73.16 1268.06
ESTUCADO LISO INTERIOR (2 manos sobre enlucido)
M2
929.9
2.18
976.4
LAVABO MARLOWE SUBPONER BRIGGS
U
9
48.84
394.56
LAVABO ROTONDO TIPO VESSEL BRIGGS
U
3
67.65
187.95
MONOMANDO DUCHA SCARLETT BRIGGS
U
3
143.8
371.4
MONOMANDO LAVAMANOS ALTA SCARLETT BRIGGS
U
3
165.9
467.7
MONOMANDO LAVAMANOS BAJA SCARLETT BRIGGS
U
9
141.5
1183.5
MONOMANDO NIZA PARA COCINA BRIGGS
U
3
78.53
205.59
MURETE CIMENTACION PARA DECKING H = 40CM
Ml
78.36
18.31
878.42
PIEDRA LISA EN BORDE PARA DECKING 30 ANCHO X 20 ALTO
ML
43.85
22.63
729.23
PIEDRA NATURAL NEGRA FORMATOS >20*20 PARED
M2
65.5
55.16 3088.98
PINTURA EXTERIOR 2 MANOS LATEX VINILICO COLORE SUAVE
M2
310.3
2.8
437.58
PINTURA INTERIOR 2 MANOS LATEX VINIL COLOR SUAVE M2
929.9
2.32
864.81
PISO FLOTANTE AC4 DOMAINE P. ALTA
M2
130.4
20.19 2452.26
PORCELANATO PISO PB DOMAINE
M2
188.1
36.96 6011.36

CostoMdO CostoRubro
184.65
478.27
0
4074.56
0
510.49
224.4
1492.46
1050.79
2027.18
45
439.56
15
202.95
60
431.4
30
497.7
90
1273.5
30
235.59
556.36
1434.77
263.1
992.33
524
3612.98
431.37
868.95
1292.56
2157.37
179.91
2632.17
940.45
6951.81
TOTAL
30,314.04

RubroNo
0001
0256
0398
0938
0173
0346
0510
0271
0120
0005
0182
0121

Rubro
Unidad Cant CostoU Rubro CostoMats CostoMdO
MAMPOSTERIA DE BLOQUE 10 CM, MORTERO
M2 1:4 328.2
8.47 1804.99
974.69
MAMPOSTERIA DE BLOQUE 15 CM, MORTERO
M2 1:4 121.6
9.18
719.75
396.35
MAMPOSTERIA DE BLOQUE 20 CM, MORTERO
M2 1:4 56.9
11.13
425.61
207.69
MAMPOSTERIA DE JABONCILLO
M2
161.3
25.01 3456.23
577.38
ENLUCIDO INTERIOR ESPESOR 1 - 1.5 cm M2
929.9
4.24 1320.46 2622.32
ENLUCIDO EXTERIOR ESPESOR 1 - 2 cm
M2
310.3
5.04
549.3 1014.81
FILO INFERIOR DE VENTANA CON CAIDA EN
MLPARED40.75
DE BLOQUE 5.23
68.46
144.66
FILO SIMPLE
ML
140
1.31
43.4
140
FILO DOBLE
ML
180.6
3.48
176.99
451.5
DINTEL
ML
57.91
10.77
400.74
222.95
MASILLADO DE PISOS EN FRESCO
M2
284
1.25
127.8
227.2
MASILLADO DE PISOS EN SECO H=1.5 CM M2
33
6.18
113.85
90.09
TOTAL

CostoRubro
2779.68
1116.1
633.3
4033.61
3942.78
1564.11
213.12
183.4
628.49
623.69
355
203.94
16,277.22

RubroNo
0417
0044
0063
0619
0903
0454
0141
0457
0260
0324
1021
0326
0323
0332
0178
0027
1022
0506
0462
0032
0318
0241
0255
0397
0068
0096
0155
0321
0690
0815

Rubro
Unidad Cant CostoU Rubro
REPLANTEO (ESTACAS, EJES, TIMBRADO)
M2
195.98
0.69
EXCAVACION A MANO H < 3M
M3
75.91
6.00
PERFILADO DE EXCAVACIONES A MANO
M2
64.10
5.00
HORMIGON PREMEZCLADO 180 EN REPLANTILLOS
M3
4.06
94.57
HORMIGON PREMEZCLADO 210 KG/CM2 EN PLINTOS CON BOMBA
M3
10.83
111.12
FIGURADO Y ARMADO DE ACERO 8 MM
KG
#####
1.40
FIGURADO Y ARMADO DE ACERO 10 MM
KG
#####
1.39
FIGURADO Y ARMADO DE ACERO 12 MM
KG
#####
1.39
FIGURADO Y ARMADO DE ACERO 14 mm
KG
156.00
1.35
ENCOFRADO PERIMETRAL DE CONTRAPISOS CON TABLA DE MONTE ML
67.43
3.37
ENCOFRADO BASE DE COLUMNA EN PLINTO TABLERO PREFAB. 5 USOS M2
29.16
5.96
ENCOFRADO DE COLUMNAS TABLERO PREFAB. 5 USOS
M2
146.97
5.88
DESENCOFRADO DE COLUMNAS
M2
146.97
0.49
DESENCOFRADO PERIMETRAL DE LOSAS Y CONTRAPISOS
ML
173.31
0.45
POLIETILENO IMPERMEABILIZACION EN CONTRAPISO / MUROS
M2
195.98
1.23
HORMIGON PREMEZCLADO 210 EN COLUMNAS CON BOMBA
M3
12.32
111.67
HORMIGON PREMEZCLADO 210 EN CONTRAPISO CON BOMBA
M3
19.53
107.62
ENCOFRADO PERIMETRAL DE LOSAS CON TABLERO TRIPLEX
ML
105.88
2.28
ENCOFRADO LOSA (EQUIPO METALICO)
M2
385.00
2.85
DESENCOFRADO DE LOSAS
M2
385.00
0.88
HORMIGON PREMEZCLADO 210 LOSAS ALIV. CON BOMBA
M3
56.92
103.20
ALIVIANAMIENTO CON BLOQUE DE 15 CM
M3
21.26
41.79
ENCOFRADO VIGAS PERALTADAS CON TABLEROS PREFABRICADOS 5 USOS
M2
10.32
4.14
MASILLADO DE PISOS EN FRESCO CON ENDURECEDOR
M2
143.54
1.11
FABRICACION ENCOFRADO DE 20 HASTA 39 CM X 244 CM (Tableros Triplex
U
18 mm)
42.00
20.12
FABRICACION ENCOFRADO DE 40 HASTA 60 CM X 244 CM (Tableros Triplex
U
18 mm)
42.00
28.46
LIMPIEZA FINAL DE OBRA
M2
372.00
1.64
FIGURADO Y ARMADO DE ACERO 16 MM
KG
46.00
1.36
MALLA ELECTROSOLDADA 6mm X 15 X 15cm
M2
392.00
5.55
RELLENO MANUAL COMPACTADO A MAQUINA CON SUBBASE 3H < 2MM3
58.98
8.00

CostoMats CostoMdO CostoRubro


0.00
135.23
135.23
0.00
455.46
455.46
0.00
320.50
320.50
312.90
71.05
383.95
992.24
211.19 1,203.43
3,224.00
416.00 3,640.00
1,981.53
257.76 2,239.29
5,495.64
714.88 6,210.52
185.64
24.96
210.60
136.88
90.36
227.24
69.40
104.39
173.79
349.79
514.40
864.18
0.00
72.02
72.02
0.00
77.99
77.99
154.82
86.23
241.06
1,128.76
247.02 1,375.77
1,789.34
312.48 2,101.82
136.59
104.82
241.41
0.00 1,097.25 1,097.25
0.00
338.80
338.80
5,215.01
659.13 5,874.14
673.52
214.94
888.46
0.72
42.00
42.72
44.50
114.83
159.33
712.32
132.72
845.04
1,044.54
150.78 1,195.32
0.00
610.08
610.08
55.20
7.36
62.56
1,960.00
215.60 2,175.60
0.00
471.84
471.84
TOTAL
33,935.40