Computos 23marzo II
Computos 23marzo II
DESCRIPCION
FIG.
UNID
L
Long.
CALLE No.1
EXCAVACION:
FIGURA 1
1
A=1.75m
L = 8,7 m
PERFIL L=8.7 m
A=1.75 m
H=1.92 m
H=(alto)=1.92 m
M3
8.7
M3
M3
8.5
M3
24
FIGURA 2
2
A=1.75m
L = 9,0 m
PERFIL L=9.0 m
A=1.75 m
H=1.73 m
H=(alto)=1.73 m
FIGURA 3
3
A=1.75m
L = 8,5 m
TOTAL EXCAVACION CALLE NO.1
POLIFUNCIONAL
PERFIL L=8.5 m
A=1.75 m
H=1.83 m
H=(alto)=1.83 m
sede comunal
lado sede
lado vecino
CANCHA
4
lado abajo
A=1.5m
L = 24.0 m
FIGURA 4
PERFIL L=24.0 m
A=1.5 m
H=0.74 m
H=(alto)=0.74 m
5
PERFIL L=10.0 m
A=0.5 m
H=1.0 m
H=(alto)=1.0 m
A=0.50m
L = 10.0 m
EXCAVACION: lado sede
M3
10
M3
10
M3
M3
M3
10
M3
28.5
FIGURA 6
6
PERFIL L=100 m
A=0.5 m
H=1.0 m
H=(alto)=1.0 m
A=0.50m
L = 10.0 m
RELLENO: lado sede
FIGURA 7
7
PERFIL L=6.0 m
A=5.0 m
H=1.0 m
H=(alto)=1.0 m
A=0.50m
L = 6.0 m
EXCAVACION: lado sede
FIGURA 8
8
PERFIL L=6.0 m
A=0.5 m
H=1.0 m
H=(alto)=1.0 m
A=0.50m
L = 6.0 m
RELLENO: lado vecinal
FIGURA 9
9
PERFIL L=10.0 m
A=2.0m
A=2.0 m
H=2.5 m
L = 10.0 m
H=(alto)=2.50 m
TOTAL EXCAVACION CANCHA POLIFUNCIONAL
TOTAL RELLENO CANCHA POLIFUNCIONAL
MURO DE CONTENCION
SECTOR SEDE COMUNAL
FIGURA 10
PERFIL
1.67 m
L = 28.8 m
CORTE
10
0.30 m
A1=(0.85+0.3)/2=0.575m
H1=1.37 m
0.85 m
L=28.5m
A=0.575m
H1=1.37m
CORTE
FIGURA 11
11
H2=0.30 m
L=28.5m
A2= 0.90 m
A2=0.90m
L=28.50 m
H2=0.30m
TOTAL MURO DE CONTENCION SECTOR SEDE COMUNAL
RELLENO
M3
28.5
M3
11.4
M3
21.7
M3
20
M3
19
M3
19.3
M3
20.4
FIGURA 12
12
H=0.7 m
L=11.40m
A=2.0m
H=0.70m
A= 2.0 m
L= 11.40 m
TOTAL RELLENO SEDE COMUNAL
CALLE AVAROA
EXCAVACION
FIGURA 12
12
H=1.50 m
L=21.7m
A=1.0m
H=1.5m
A= 1.0 m
L= 21.70 m
EXCAVACION
FIGURA 13
13
H=1.50 m
L=20.m
A= 1.0 m
A=1.0m
L= 20.0 m
H=1.5m
TOTAL EXCAVACION CALLE AVAROA
CALLE "A"
EXCAVACION
FIGURA 14
14
H=1.04 m
L=19.m
A=1.50m
H=1.04m
A= 1.50 m
L= 19.0 m
FIGURA 15
15
H=0.75 m
L=19.30.m
A=1.50m
H=0.75m
A= 1.50 m
L= 19.30 m
FIGURA 16
16
H=0.87 m
A= 1.50 m
L= 20.40 m
L=20.40m
A=1.50m
H=0.87m
FIGURA 17
17
H=0.72 m
L=19.40.m
A=1.50m
H=0.72m
A= 1.50 m
L= 19.40 m
TOTAL EXCAVACION CALLE "A"
CALLE "B"
EXCAVACION
M3
19.4
M3
19.5
M3
21
M3
19
M3
17
ML
3.85
FIGURA 18
18
H=0.7 m
L=19.50m
A=1.30m
H=0.7m
A= 1.30 m
L= 19.50 m
FIGURA 19
19
H=0.64 m
L=21.0.m
A=1.30m
H=0.64m
A= 1.30 m
L= 21.00 m
FIGURA 20
20
H=0.57 m
L=19.0m
A=1.30m
H=0.57m
A= 1.30 m
L= 19.0 m
FIGURA 21
21
H=0.70 m
L=17.0.m
A=1.30m
H=0.70m
A= 1.30 m
L= 17.0 m
TOTAL EXCAVACION CALLE "B"
CALLE No. 5
PRETIL
FIGURA 21
21
L=3.85 m
H=0.60 m
L=3.85m
A= 0.2 m
FIGURA 21
21
L=3.50 m
L=3.50m
H=0.60 m
0.2 m
ML
3.5
ML
1.87
FIGURA 21
21
L=1.87 m
L=1.87m
H=0.60 m
A= 0.2 m
TOTAL PRETIL CALLE No. 5
ML
RESUMEN DE COMPUTOS
MEJORAMIENTO DE VARRIOS
REPLANTEO DE LINEA
TOTAL
40.4
21.5
28
89.9
TOTAL
58.3
21.97
50.89
78.8
202.54
8
12.96
7.76
6.51
32.08
479.81
EXCAVACION
PERFILADO DE TERRENO
TOTAL
33.6
56.56
90.16
TOTAL
118
40
18
28
38
242
TOTAL
20
ARMADO DE GAVIONES
DRENAJE
MODULO SANITARIO
REJILLA DE PISO
TUBO DE DESAGUE PVC 4"
CAJA INTERCEPTORA 0.6X0.6
UNION UNIVERSAL 1/2"
TEE DE 1/2"
CODO DE 1/2"
LLAVE DE PASO DE 1/2"
TUBERIA PVC E-40 DE 1/2"
NIPLE FG DE 1/2"
GRIFO DE BRONCE DE 1/2"
TUBO DE DESAGUE PVC 2"
89
712
89
178
178
534
178
578.5
267
89
356
CANCHA POLIFUNCIOINAL
REPLANTEO DE ESTRUCTURAS
EXCAVACION
ARMADO DE GAVIONES
73.3
100.89
52.2
CANCHA POLIFUNCIONAL
REPLANTEO
EXCAVACION
ARMADO DE GAVIONES
LETRERO
TOTAL
TOTAL
TOTAL
TOTAL
73.3
100.89
52.5
1.0
TOTAL
1.0
CENTRO COMUNAL
LETRERO
PZA
ML
PZA
PZA
PZA
PZA
PZA
ML
PZA
PZA
ML
A
H
Anch. Alto
SUB
TOTAL
1.75
1.92
29.23
1.75
1.73
27.25
1.75
1.83
27.22
TOTAL
83.70
1.5
0.74
26.64
0.5
5.00
0.5
5.00
0.5
3.00
0.5
3.00
2.5
50.00
34.64
58
0.58
1.37
22.45
0.9
0.3
7.70
30.15
0.7
15.96
15.96
1.5
32.55
1.5
30.00
62.55
1.5
1.04
29.64
1.5
0.75
21.71
1.5
0.87
26.62
1.5
0.72
20.95
98.93
1.3
0.7
17.75
1.3
0.64
17.47
1.3
0.57
14.08
1.3
0.7
15.47
64.77
3.85
3.50
1.87
9.22