2X600 MW Kalisindh Thermal Power Project,Jhalawar (Rajasthan)

Abstract of C&I works for RAB - 25


M/s Electro Crafts Const. Co.
AS PER REVISED SEVICE ORDER

RAB-25
QUANTITY

ON % BASIS

AMOUNT

Sl No.

ITEM DESCRIPTION

UNIT

QTY

UNIT AMOUNT

TOTAL AMOUNT
Previous

Present

Cummulative

Previous

Present

Cummulative

1
I

8.0

9.0

10 = 8+9

11 = 6*8

12 = 6*9

13 = 11+12

EREC OF JUNCTION BOXES


JUNCTION BOXES, 24 TB
JUNCTION BOXES, 24 TB Lifting & Shifting
JUNCTION BOXES, 24 TB Installation
JUNCTION BOXES, 24 TB Continuity Checking

PC
PC
PC
PC

100

2500
1000
1250
250

250000.0
0.0
0.0
0.0

100.0
100.0
53.0

100.0
100.0
53.0

100000.00
125000.00
13250.00

0.00
0.00
0.00

100000.00
125000.00
13250.00

JUNCTION BOXES, 36/48 TB


JUNCTION BOXES, 36/48 TB Lifting & Shifting
JUNCTION BOXES, 36 /48TB Installation
JUNCTION BOXES, 36/48 TB Continuity Checking

PC
PC
PC
PC

140

3000
1200
1500
300

420000.0
0.0
0.0
0.0

140.0
140.0
85.0

140.0
140.0
85.0

168000.00
210000.00
25500.00

0.00
0.00
0.00

168000.00
210000.00
25500.00

JUNCTION BOXES, 72 TB
JUNCTION BOXES, 72 TB Lifting & Shifting
JUNCTION BOXES, 72 TB Installation
JUNCTION BOXES, 72 TB Continuity Checking

PC
PC
PC
PC

40

3500
1400
1750
350

140000.0
0.0
0.0
0.0

40.0
40.0
19.0

40.0
40.0
19.0

56000.00
70000.00
6650.00

0.00
0.00
0.00

56000.00
70000.00
6650.00

JUNCTION BOXES, 96 TB
JUNCTION BOXES, 96 TB Lifting & Shifting
JUNCTION BOXES, 96 TB Installation
JUNCTION BOXES, 96 TB Continuity Checking

PC
PC
PC
PC

50

4000
1600
2000
400

200000.0
0.0
0.0
0.0

50.0
50.0
48.0

50.0
50.0
48.0

80000.00
100000.00
19200.00

0.00
0.00
0.00

80000.00
100000.00
19200.00

EREC OF PANELS
LIE /MOT/LTI/LCB PANEL
LIE /MOT/LTI/LCB PANEL Lifting & Shifting
LIE /MOT/LTI/LCB PANEL Installation
LIE /MOT/LTI/LCB PANEL Continuity Checking

PC
PC
PC
PC

150

5000
2000
2500
500

750000.0
0.0
0.0
0.0

146.0
146.0
58.0

148.0
148.0
58.0

292000.00
365000.00
29000.00

4000.00
5000.00
0.00

296000.00
370000.00
29000.00

LIR/BURNER/LCP PANEL
LIR/BURNER/LCP PANEL Lifting & Shifting
LIR/BURNER/LCP PANEL Installation
LIR/BURNER/LCP PANEL Continuity Checking

PC
PC
PC
PC

148

8000
3200
4000
800

1184000.0
0.0
0.0
0.0

148.0
148.0
84.0

148.0
148.0
84.0

473600.00
592000.00
67200.00

0.00
0.00
0.00

473600.00
592000.00
67200.00

LIE JB /I JB/FS JB
LIE JB /I JB/FS JB Lifting & Shifting
LIE JB /I JB/FS JB Installation
LIE JB /I JB/FS JB Continuity Checking

PC
PC
PC
PC

306

1000
400
500
100

306000.0
0.0
0.0
0.0

306.0
287.0
134.0

306.0
307.0
134.0

122400.00
143500.00
13400.00

0.00
10000.00
0.00

122400.00
153500.00
13400.00

UPS ERECTION AND COMM. ASSISTANCE


160KVA UPS WITH BATTERY
160KVA UPS WITH BATTERY Lifting & Shifting
160KVA UPS WITH BATTERY Installation
160KVA UPS WITH BATTERY Continuity Checking

PC
PC
PC
PC

75000
30000
37500
7500

150000.0
0.0
0.0
0.0

2.0
2.0
2.0

2.0
2.0
2.0

60000.00
75000.00
15000.00

0.00
0.00
0.00

60000.00
75000.00
15000.00

40/10KVA UPS WITH BATTERY FOR CHP & DM PL


40/10KVA UPS WITH BATTERY FOR CHP & DM PL Lifting & Shifting
40/10KVA UPS WITH BATTERY FOR CHP & DM PL Installation
40/10KVA UPS WITH BATTERY FOR CHP & DM PL Continuity Checking

PC
PC
PC
PC

50000
20000
25000
5000

100000.0
0.0
0.0
0.0

2.0
2.0
1.0

2.0
2.0
1.0

40000.00
50000.00
5000.00

0.00
0.00
0.00

40000.00
50000.00
5000.00

a
1

b
1

c
1

ERECTION OF PANELS, JUNCTION BOXES, UPS & COMMISSIONING ASSISTANCE

2.0
2.0

20.0

QTY (%)

AMOUNT(Rs.)

QUANTITY
Sl No.
1
3

d
1

II
1

III
1

ITEM DESCRIPTION

UNIT

QTY

2
5KVA UPS WITH BATTERY FOR FO
5KVA UPS WITH BATTERY FOR FO Lifting & Shifting
5KVA UPS WITH BATTERY FOR FO Installation
5KVA UPS WITH BATTERY FOR FO Continuity Checking

3
PC
PC
PC
PC

4
1

EREC OF CONTROL ROOM PANELS


PANEL SIZE 800*800*2100
PANEL SIZE 800*800*2100 Lifting & Shifting
PANEL SIZE 800*800*2100 Installation
PANEL SIZE 800*800*2100 Continuity Checking

PC
PC
PC
PC

208

PANEL SIZE 4000*800*2100


PANEL SIZE 4000*800*2100 Lifting & Shifting
PANEL SIZE 4000*800*2100 Installation
PANEL SIZE 4000*800*2100 Continuity Checking

PC
PC
PC
PC

PANEL SIZE 1000*900*2100


PANEL SIZE 1000*900*2100 Lifting & Shifting
PANEL SIZE 1000*900*2100 Installation
PANEL SIZE 1000*900*2100 Continuity Checking

PC
PC
PC
PC

67" LVS (INCLUDING PLC AND DCS )


67" LVS (INCL PLC AND DCS ) Lifting & Shifting
67" LVS (INCL PLC AND DCS ) Installation
67" LVS (INCL PLC AND DCS ) Continuity Checking
SUBTOTAL

PC
PC
PC
PC

16

ERECTION OF CABLE TRAYS


LAYING OF 600 X 75/50 X 2 mm
LAYING OF 600 X 75/50 X 2 mm Lifting & Shifting
LAYING OF 600 X 75/50 X 2 mm Installation

M
M
M

4000

LAYING OF 300 X 75/50 X 2 mm


LAYING OF 300 X 75/50 X 2 mm lifting & Shifting
LAYING OF 300 X 75/50 X 2 mm Installation

M
M
M

3000.0

LAYING OF 150/100 X 20 X 2 mm and 600 mm wide ladder Tray


LAYING OF 150/100 X 20 X 2 mm and 600 mm wide ladder Tray Lifting & Shifting
LAYING OF 150/100 X 20 X 2 mm and 600 mm wide ladder Tray Installation

M
M
M

5700.0

LAYING OF 50 X 20 X 2 mm
LAYING OF 50 X 20 X 2 mm Lifting & Shifting
LAYING OF 50 X 20 X 2 mm Installation
SUBTOTAL

M
M
M

4000.0

LAYING AND TERMINATION OF CABLES


12P/12P/24P/12T /16C/24X1.5sq mm/CAT6 CABLE WITH TER
12P/12P/24P/12T /16C/24X1.5sq mm/CAT6 CABLE Lifting & Shifting
12P/12P/24P/12T /16C/24X1.5sq mm/CAT6 CABLE Installation
12P/12P/24P/12T /16C/24X1.5sq mm/CAT6 CABLE Continuity Checking

M
M
M
M

256340.0

UNIT AMOUNT

ON % BASIS

AMOUNT

TOTAL AMOUNT

6
15000
6000
7500
1500

7
15000.0
0.0
0.0
0.0

4000
1600
2000
400

Previous

Present

Cummulative

Previous

Present

Cummulative

8.0

9.0

10 = 8+9

11 = 6*8

12 = 6*9

13 = 11+12

1.0
1.0
1.0

1.0
1.0
1.0

6000.00
7500.00
1500.00

0.00
0.00
0.00

6000.00
7500.00
1500.00

832000.0
0.0
0.0
0.0

208.0
208.0
90.0

208.0
208.0
90.0

332800.00
416000.00
36000.00

0.00
0.00
0.00

332800.00
416000.00
36000.00

20000
8000
10000
2000

40000.0
0.0
0.0
0.0

0.0
0.0
0.0

0.0
0.0
0.0

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

5000
2000
2500
500

40000.0
0.0
0.0
0.0

8.0
8.0
0.0

8.0
8.0
0.0

16000.00
20000.00
0.00

0.00
0.00
0.00

16000.00
20000.00
0.00

5000
2000
2500
500

80000.0
0.0
0.0
0.0
2838965.0

11.0
7.0
7.0

11.0
7.0
7.0

22000.00
17500.00
3500.00

0.00
0.00
0.00
19000.00

22000.00
17500.00
3500.00

80
32
48

320000.0
0.0
0.0

358.0
189.0

75
30
45

225000.0
0.0
0.0

1920.5
1920.1

60
24
36

342000.0
0.0
0.0

11470.5
9536.5

40
16
24

160000.0
0.0
0.0
813462.0

20
8
10
2

5126800.0
0.0
0.0
0.0

73.0

587.5
140.5

5883.5
5813.8

157095.3
162379.0
141287.3

8873.0
8530.0
9277.0

358.0
262.0

11456.00
9072.00

0.00
3504.00

11456.00
12576.00

1920.5
1920.1

57615.00
86404.50

0.00
0.00

57615.00
86404.50

12058.0
9677.0

275292.00
343314.00

14100.00
5058.00

289392.00
348372.00

5883.5
5813.8

94136.00
139531.20

0.00
0.00
22662.00

94136.00
139531.20

70984.00
85300.00
18554.00

1327746.40
1709090.00
301128.60

165968.3
170909.0
150564.3

1256762.40
1623790.00
282574.60

QTY (%)

AMOUNT(Rs.)

0.007

19872.755

0.028

22776.936

QUANTITY
Sl No.

ITEM DESCRIPTION

UNIT

QTY

UNIT AMOUNT

Previous
1
2

IV
a

2
1/2/4/6/8P x 0.5 sq mm & TRIAD, COMPS.ANALOG, EARTH
1/2/4/6/8P x 0.5 sq mm & TRIAD, COMPS.ANALOG, EARTH Lifting & Shifting
1/2/4/6/8P x 0.5 sq mm & TRIAD, COMPS.ANALOG, EARTH Installation
1/2/4/6/8P x 0.5 sq mm & TRIAD, COMPS.ANALOG, EARTH Continuity Checking
SUBTOTAL

3
M
M
M
M

4
899412.0

CALI, EREC & COMM. OF FIELD INST. INCLUDING CEMS, SWAS & OTHER PACKAGES
CALI, EREC & COMM. OF FIELD INST. IN TURBINE AREA
Calibration,Erection & Commissioning of Field inst in Turbine Area
Instrument Lifting & Shifting of Turbine Area
Calibration of Field inst in Turbine Area
Erection of Field inst in Turbine Area
Commissioning of Field inst in Turbine Area

PC
PC
PC
PC
PC

1717

CALI, EREC & COMM. OF FIELD INST. IN BOILER AREA


Calibration,Erection & Commissioning of Field inst in Boiler Area
Instrument Lifting & Shifting of Boiler Area
Calibration of Field inst in Boiler Area
Erection of Field inst in Boiler Area
Commissioning of Field inst in Boiler Area

PC
PC
PC
PC
PC

1746

CALI, EREC & COMM. OF FIELD INST. IN BOP AREA


Calibration,Erection & Commissioning of Field inst in BOP Area
Instrument Lifting & Shifting of BOP Area
Calibration of Field inst in BOP Area
Erection of Field inst in BOP Area
Commissioning of Field inst in BOP Area

PC
PC
PC
PC
PC

1142

C&I ERECTION WORK IN ESP Area


Opacity meter in ESP outlet duct
Opacity meter in ESP outlet duct lifting & shifting
Opacity meter in ESP outlet duct Installation

SET
SET
SET

6
15
6
7.5
1.5

ON % BASIS

AMOUNT

TOTAL AMOUNT
7
13491180.0
0.0
0.0
0.0
17822507.0

Present

Cummulative

Previous

Present

Cummulative

8.0

9.0

10 = 8+9

11 = 6*8

12 = 6*9

13 = 11+12

456065.5
419926.0
376376.0

8915.0
10761.0
21188.0

464980.5
430687.0
397564.0

2736393.00
3149445.00
564564.00

53490.00
80707.50
31782.00
340817.50

2789883.00
3230152.50
596346.00

2000
400
600
800
200

3434000.0
0.0
0.0
0.0
0.0

1717
1717.0
923.0
783.0

2000
400
600
800
200

3492000.0
0.0
0.0
0.0
0.0

1746.0
1746.0
1677.0
1123.0

1000
200
300
400
100

1142000.0
0.0
0.0
0.0
0.0

590.0
590.0
508.0
392.0

15000
6000
9000

120000.0
0.0
0.0

C&I ERECTION WORK IN APH Area


Fire alarm panel /Gap control local panel/Main gap control panel/Gap sensor with signal convertor
PC
22
Fire alarm panel /Gap control local panel/Main gap control panel/Gap sensor with signal convertor lifting & PC
shifting
Fire alarm panel /Gap control local panel/Main gap control panel/Gap sensor with signal convertor Installation
PC
Fire alarm panel /Gap control local panel/Main gap control panel/Gap sensor with signal convertor ContinutyPC
Checking

5000
2000
2500
500

FIELD CALIBRATION & LIMIT SWITCH SETTINGS WORK


MOVs BTG/BOP/CONTROL VALVES /DAMPERS/ACTUATORS
MOVs BTG/BOP/CONTROL VALVES /DAMPERS/ACTUATORS lifting & shifting
MOVs BTG/BOP/CONTROL VALVES /DAMPERS/ACTUATORS Installation
MOVs BTG/BOP/CONTROL VALVES /DAMPERS/ACTUATORS commissioning

PC
PC
PC
PC

844

EREC AND COM ASSIS FOR CEMS SYSTEM


SOX,NOX,CO & OPACITY ANALYSER WITH PANELS/DRY PNL/WET PNL
SOX,NOX,CO & OPACITY ANALYSER WITH PANELS LIFTING & SHIFTING
SOX,NOX,CO & OPACITY ANALYSER WITH PANELS INSTALLATION
SOX,NOX,CO & OPACITY ANALYSER WITH PANELS CONTINUTY CHECKING

SET
SET
SET
SET

1717.0
1717.0
952.0
783.0

686800.00
1030200.00
738400.00
156600.00

0.00
0.00
23200.00
0.00

686800.00
1030200.00
761600.00
156600.00

1746.0
1746.0
1722.0
1123.0

698400.00
1047600.00
1341600.00
224600.00

0.00
0.00
36000.00
0.00

698400.00
1047600.00
1377600.00
224600.00

590.0
590.0
536.0
392.0

118000.00
177000.00
203200.00
39200.00

0.00
0.00
11200.00
0.00

118000.00
177000.00
214400.00
39200.00

0.0
0.0

0.0
0.0

0.00
0.00

0.00
0.00

0.00
0.00

110000.0
0.0
0.0
0.0

14.0
14.0
11.0

14.0
14.0
11.0

28000.00
35000.00
5500.00

0.00
0.00
0.00

28000.00
35000.00
5500.00

1000
400
500
100

844000.0
0.0
0.0
0.0

343.0
342.0
342.0

343.0
342.0
342.0

137200.00
171000.00
34200.00

0.00
0.00
0.00

137200.00
171000.00
34200.00

25000
10000
12500
2500

50000.0
0.0
0.0
0.0

0.0
0.0
0.0

0.0
0.0
0.0

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

29.0

45.0

28.0

QTY (%)

AMOUNT(Rs.)

0.019

338627.633

QUANTITY
Sl No.
1
h
1

V
a

VI
1

VII
1

VIII
1

ITEM DESCRIPTION
2
ERECTION AND COMMISSSIONG ASSISTANCE FOR SWAS SYSTEM
SS SAMPLING TUBING WITH ACES INCLU TIG
SS SAMPLING TUBING WITH ACES INCLU TIG lifting & shifting
SS SAMPLING TUBING WITH ACES INCLU TIG Installation

UNIT

QTY

UNIT AMOUNT

ON % BASIS

AMOUNT

TOTAL AMOUNT
Previous

Present

Cummulative

Previous

Present

Cummulative

8.0

9.0

10 = 8+9

11 = 6*8

12 = 6*9

13 = 11+12

M
M
M

4000

200
80
120

800000.0
0.0
0.0

4000.0
2677.8

526.5

4000.0
3204.3

320000.00
321336.00

0.00
63180.00

320000.00
384516.00

HOTWELL LEAKAGE DETECTION SYSTEM


HOTWELL LEAKAGE DETECTION SYSTEM lifting & shifting
HOTWELL LEAKAGE DETECTION SYSTEM Installation

SET
SET
SET

15000
6000
9000

30000.0
0.0
0.0

1.0
1.0

1.0
1.0

6000.00
9000.00

0.00
0.00

6000.00
9000.00

DRY PANEL/ WET PANEL WITH ANALYZERS


DRY PANEL/ WET PANEL WITH ANALYZERS lifting & shifting
DRY PANEL/ WET PANEL WITH ANALYZERS Installation
DRY PANEL/ WET PANEL WITH ANALYZERS Commissioning
SUBTOTAL

SET
SET
SET
SET

25000
10000
12500
2500

100000.0
4.0
3.0
0.0

4.0
3.0
0.0

40000.00
37500.00
0.00

0.00
0.00
0.00
133580.00

40000.00
37500.00
0.00

ERECTION OF PLC WORK STATION INCLUDING PCs & PRINTERS


ERECTION AND COMM. ASSISTANCE OF PRINTERS
COLOR LASER & DOT MATRIX PRINTER
COLOR LASER & DOT MATRIX PRINTER Lifting & Shifting
COLOR LASER & DOT MATRIX PRINTER Installation
ERECTION OF OPERATING AND MONITORING SYS (21'LCD MONITOR)
EREC OF OP AND MONT SYS (21'LCD MONITOR) LIFTING AND SHIFTING
EREC OF OP AND MONT SYS (21'LCD MONITOR) INSTALLATION
EREC OF OP AND MONT SYS (21'LCD MONITOR) CONTINUTY CHECKING
SUBTOTAL

9130390.0

PC
PC
PC

21

PC
PC
PC
PC

50

ERECTION AND COMM. ASSISTANCE OF CCTV


ERECTION AND COMM. OF CCTV
CC TV & accessories Lifting & Shifting
CC TV & accessories Installation

PC
PC
PC

210

ERECTION OF SERVERS AND MONITORS


ERECTION OF SERVERS AND MONITORS Lifting & Shifting
ERECTION OF SERVERS AND MONITORS INSTALLATION

PC
PC
PC

NETWORK CABLE Laying


NETWORK CABLE Lifting &Shifting
NETWORK CABLE Installation
NETWORK CABLE Continuity Checking
SUBTOTAL

M
M
M
M

30,000

ERECTION Of STRUCTURAL STEEL


STRUCTURAL STEEL
STRUCTURAL STEEL Lifting & Shifting
STRUCTURAL STEEL Installation
SUBTOTAL
ERECTION OF PIPES AND TUBES
1/2"/1" IMPULSE PIPE/12 mm ss Tube,CU Tu,
1/2"/1" IMPULSE PIPE/12 mm ss Tube,CU Tu, Lifting & Shifting
1/2"/1" IMPULSE PIPE/12 mm ss Tube,CU Tu, installation

TON
TON
TON

M
M
M

40

37500

1000
400
600

21000.0
0.0
0.0

10000
4000
5000
1000

500000.0
0.0
0.0
0.0
518395.0

16.0
0.0

16.0
0.0

6400.00
0.00

0.00
0.00

6400.00
0.00

44.0
37.0
18.0

44.0
37.0
18.0

176000.00
185000.00
18000.00

0.00
0.00
0.00
0.00

176000.00
185000.00
18000.00

500
200
300

105000.0
0.0
0.0

0.0
0.0

0.0
0.0

0.00
0.00

0.00
0.00

0.00
0.00

5000
2000
3000

15000.0
0.0
0.0

0.0
0.0

0.0
0.0

0.00
0.00

0.00
0.00

0.00
0.00

25
10
12.5
2.5

750000.0
0.0
0.0
0.0
865650.0

2738.0
2738.0
2738.0

2738.0
2738.0
2738.0

27380.00
34225.00
6845.00

0.00
0.00
0.00
0.00

27380.00
34225.00
6845.00

800000.0
0.0
0.0
492840.0

40.000
40.000

0.00
0.00
0.00

320000.00
480000.00

67230.00
47385.00

1666139.40
1893105.00

20000
8000
12000

150
60
90

5625000.0
0.0
0.0

26648.5
20508.0

40.00
40.00

1120.5
526.5

27769.0
21034.5

320000.00
480000.00

1598909.40
1845720.00

QTY (%)

AMOUNT(Rs.)

0.015

136955.85

0.000

0.000

0.000

QUANTITY
Sl No.
1
2

IX
1

X
1

ITEM DESCRIPTION
2

UNIT

QTY

METAL HOSE
METAL HOSE lifting &shifing
METAL HOSE Installation

3
M
M
M

4
480

PVC PIPE
PVC PIPE lifting& Shfting
PVC PIPE installation

M
M
M

100

CONDUIT PIPE LAYING IN CABLE VAULT 4"


CONDUIT PIPE LAYING 4" IN CABLE VAULT lifting & shifting
CONDUIT PIPE LAYING 4"IN CABLE VAULT installation

M
M
M

60

CONDUIT PIPE LAYING 1"


CONDUIT PIPE LAYING 1" lifting & shifting
CONDUIT PIPE LAYING 1" installation

M
M
M

400

FLEXIBLE METALLIC /PVC COND. LAYING 3/4"/1"/2"


FLEXIBLE METALLIC /PVC COND. LAYING 3/4"/1"/2" lifting & shifting
FLEXIBLE METALLIC /PVC COND. LAYING 3/4"/1"/2" installation
SUBTOTAL

M
M
M

1200

INSTALLATION OF EARTH PIT


ELECT EARTH PIT WITH MATERIAL SUPPLY
ELECT EARTHING Material lifting & shifting
ELECT EARTHING INSTALLATION
SUBTOTAL
ADDITIONAL MISC ERECTION WORK
ADDITIONAL MISC ERECTION WORK
ADDITIONAL MISC ERECTION WORK MATERIAL LIFTING & SHIFTING
ADDITIONAL MISC ERECTION WORK INSTALLATION
SUBTOTAL
TOTAL BASIC BILL AMOUNT :-

PC
PC
PC

PC
PC
PC

30

2030

UNIT AMOUNT

ON % BASIS

AMOUNT

TOTAL AMOUNT
Previous

Present

Cummulative

8.0

9.0

Previous

Present

Cummulative

6
100
40
60

7
48000.0
0.0
0.0

10 = 8+9

11 = 6*8

12 = 6*9

13 = 11+12

449.0
449.0

449.0
449.0

17960.00
26940.00

0.00
0.00

17960.00
26940.00

25
10
15

2500.0
0.0
0.0

12.0
12.0

12.0
12.0

120.00
180.00

0.00
0.00

120.00
180.00

200
80
120

12000.0
0.0
0.0

60.0
48.7

60.0
55.2

4800.00
5844.00

0.00
780.00

4800.00
6624.00

50
20
30

20000.0
0.0
0.0

258.4
203.3

258.4
203.3

5168.00
6099.00

0.00
0.00

5168.00
6099.00

35
14
21

42000.0
0.0
0.0
5302463.0

1003.0
1004.1

1003.0
1004.1

14042.00
21085.05

0.00
0.00
115395.00

14042.00
21085.05

750000.0
0.0
0.0
746250.0

30.0
21.0

0.00
30000.00
30000.00

300000.00
345000.00

1015000.0
0.0
0.0
877305.0

1025.0
1025.0

0.00
0.00
0.00
661454.50

205000.00
307500.00

25000
10000
15000

500
200
300

6.5

2.0

30.0
23.0

1025.0
1025.0

300000.00
315000.00

205000.00
307500.00
28360403.15

29021857.65

QTY (%)

AMOUNT(Rs.)

0.022

116654.186

0.040

29850

0.000

0
664737.4

2017
1691
420
108
680
217
508
416
1606
2063
945
477
162
1588
2476
213
132
2623
826
237
1219
20624

Potrebbero piacerti anche