Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
MIN.
8" VAR.
4"
MIN.
"
1
-0"
2
-0"
SPAN
OUTLET ENDS.
SEE STANDARD FIG. 5-395.115 FOR EMBANKMENT PROTECTION.
FINISH ALL EXPOSED EDGES OF CONCRETE WITH " OR " CHAMFER OR
RADIUS UNLESS OTHERWISE NOTED.
1
PERMISSIBLE
LAP SPLICE
AS DROPWALL DIMENSIONS.
MIX NO. 3Y43.
2
HAUNCH TO MATCH THAT
USED.
OF BARREL (TYP.)
3
GROUT
10"
10" SLAB.
TYP.
3
-0"
BARS (TYP.)
2 PARTS SAND.
"
1
PLAN VIEW
Abt
IN CURB
NO. 4 BENT
RISE
3
-0" MAX.SPACES
LONGIT. BARS
MAX.
2-NO. 4
2
-0"
3" DIA.HOLES
PRECAST IN APRON
NO. 3 BARS @
<
9"
TIE HOLE
Atb
8
4"
MAX.
2
-0"
TONGUE OR GROOVE
VAR. 8"
4"
MIN.
CURB
RADIUS (TYP.)
"
1
1
-0"
1-0" MAX.
(
RISE/2)- 6"
"
1
NO.4 BENT BARS @ 1
-6" MAX. SPG.
CONSTRUCTION NOTES
Att
3-6" MIN. TONGUE AND 3-7" MIN. GROOVE FOR CULVERTS WITH 6-0"
SPANS. 5-0" MIN. TONGUE AND 5-1" MIN. GROOVE FOR CULVERTS WITH
SPAN
8"
EACH APRON JOINT. TONGUE AND GROOVE JOINT ON ALL THREE SIDES
OF APRON IS PERMISSIBLE.
SECTION A-A
"
"
2-0"
2"
(EXTERIOR)
10" 6
1-0" LONG
1
-6"
ON BOTTOM
(MIN.) 3
(FT.)
OR PRECAST)
SECTION B-B
5" CLR.
SECTION 1
FT. FT.
3
-2"
3 EQ. SPS.
DROPWALL 1
NO.4 BARS
MAY DRILL
AND GROUT
Abt
Atb
REINFORCEMENT
0.27
0.44
SPAN
Abt
0.47
0.60
(FT.)
(IN!/FT.)
10
0.62
0.74
6-10
0.20
12
0.88
1.06
12
0.30
14
1.20
1.58
14
0.39
16
1.52
2.09
16
0.39
3"
LAYER OF
WELDED WIRE FABRIC
3"
6"
10"
2
-6"
(
TYP.
)
(CAST-IN-PLACE
Att
(IN!/FT.) (IN!/FT.)
h3
SPAN
6
ABT. 2
REINFORCEMENT
1
10"
h2
RISE
Att, Atb
3-0" (TYP.)
Abt
10"
9"
NO CHAMFER REQUIRED
(
TYP.
)
(
RISE/2)- 6"
LEVEL
BEVEL
8
0.192 IN.!/FT.
4"
4"
TIE HOLE
9"
CURB
6
9" 1
-0"
APRON TOP AND BOTTOM SLAB THICKNESS MAY BE 8" FOR CULVERTS
WITH 6 SPANS ONLY. BOTTOM SLAB THICKNESS MAY BE INCREASED UP
5"
DETAIL "A"
4"
1:1 BEVEL
VARIES
6"
8"
Ah REINFORCEMENT
NO. 4
LONGITUDINAL
BAR (TYP.)
1-0"
SPAN
"
6"
4"
LAYER OF
WELDED WIRE FABRIC
SECTION 2
SECTION 3
h2
X
8 (4) 0.192
SECTION 4
h3
Ah
1-9"(3-9")
Ah
1-9"(3-9")
(4)
(0.192)
(1-9")
1-9"
SECTION 5
h4
Ah
h5
ZZ
Ah
10
0.192
3-9"
0.192
12
0.192
4-9"
0.192
14
0.192
5-9"
(4)
(0.192)
(1-9")
16
0.20
6-9"
0.192
3-9"
0.192
1-9"
18
0.29
7-9"
0.20
4-9"
0.192
10
20
0.42
8-9"
0.29
5-9"
(4)
(0.192)
(1-9")
11
22
0.60
9-9"
0.42
6-9"
0.192
3-9"
0.192
1-9"
12
24
0.78
10-9"
0.60
7-9"
0.20
4-9"
0.192
8 (4) 0.192
h6
ZZZ
Ah
1-9"
8 (4) 0.192
1-9"
1-9"(3-9")
Y, Z, ZZ, OR ZZZ
13
26
1.03
11-9"
0.78
8-9"
0.28
5-9"
SECTION 1
LAST SECTION
14
28
1.38
12-9"
1.03
9-9"
0.40
6-9"
NOTE:
8 (4) 0.192
6
0.192
1-9"
1-9"(3-9")
(4)
3-9"
(0.192) (1-9")
0.192
1-9"
VALUES IN ( ) MAY BE USED FOR END SECTIONS WITH SPANS OF 14 AND 16 ONLY.
SIDE ELEVATION
REVISION:
STATE PROJ.
11-06-2013
NO
(T.H.
) STA.
TITLE:
CERTIFIED BY
LICENSED PROFESSIONAL ENGINEER
NAME:
DATE
LIC. NO.
FIG. 5-395.102
DES:
DR:
CHK:
CHK:
SHEET NO.
APPROVED:
BRIDGE NO.
OF
SHEETS