Factory Acceptance
Test
PROJECT:
PP 10
Supplier:
Location:
Item
Tag Number:
Description:
Reference
Client
Client PO Nr.:
Vendor:
Vendor Job No.:
Project:
Equipment Tag:
Client Doc No.:
Vendor Doc No.:
11544-01
33214017
NEM POWER-SYSTEMS
Sibylla-Merian-Strae 3, 45665 Recklinghausen, GERMANY
Stack Damper KAM-F
(*)HNE10AA001
KAM-F 4620
PP 10
Remarks:
General Arrangement Drawing 11544-01-0100
ITP 11544-01-0701
Damper Type KAM-F
Drehmo Actuator
Applicable Inspection doc.: 11544-01-0903, 11544-01-0911, 11544-01-0931, 11544-01-933
Check of Performance
Measuring of main- and connecting dimensions (Inspection Report 11544-01-0911)
GA Drawing 11544-01-0100 shows control dimensions.
Rev.
0
description
first issue
date
prepared
30.05.2012
RPE
checked
approved
a
b
c
_______________________________________________________________________________________________________________________________________________
544 PP10 - Orderhandling
1/2
FAT:
Factory Acceptance
Test
PROJECT:
PP 10
Supplier:
Location:
Item
Tag Number:
Description:
Reference
Client
Client PO Nr.:
Vendor:
Vendor Job No.:
Project:
Equipment Tag:
Client Doc No.:
Vendor Doc No.:
11544-01
33214017
NEM POWER-SYSTEMS
Sibylla-Merian-Strae 3, 45665 Recklinghausen, GERMANY
Stack Damper KAM-F
(*)HNE10AA001
KAM-F 4620
PP 10
Purchaser / Comments
Comments:
Accepted
Accepted with Comments
Not Accepted
Rev.
0
a
b
c
description
first issue
Person in Charge:
Date:
date
30.05.2012
prepared
RPE
checked
approved
_______________________________________________________________________________________________________________________________________________
544 PP10 - Orderhandling
2/2
Inspektionsbericht
Kaminklappe
Inspectionreport
Stack Damper
NPS Auftrags-/Zeichungsnummer-Nr:
NPS Order-/Drawing No.:
11544-01-0100
Stack Damper i.D. 4620
Produkt / Product
Imeco
(*)HNE10AA001
Allgemeiner Eindruck
gut
siehe Bemerkung
good
see remarks
Strahlverfahren
Umgebungstemperatur
Ambient temperature
Relative Luftfeuchtigkeit
Relative humidity
4
a
Farbton
Shade
1. Anstrich
Innenliegender Anstrich
__________________________ __________________________
Beschichtungsstoff
Farbton
Inside painting
Coating material
__________________________ __________________________
2. Anstrich
__________________________ __________________________
3. Anstrich
Auenliegender Anstrich
__________________________ __________________________
Ist-Ma
Soll-Ma
Outside painting
specified thickness
1. Anstrich
2. Anstrich
Second painting
Shade
1. Anstrich
First painting
__________________________ __________________________
3. Anstrich
Third painting
__________________________ __________________________
2. Anstrich
Second painting
______C
Beschichtungsstoff
First painting
Taupunkt
c Dew point
Coating material
Third painting
_______%
Auenliegender Anstrich
Second painting
______________________________________________________
Objekttemperatur
______C
______
a Surface temperature
______C
______
Outside painting
First painting
______________________________________________________
Norm-Reinheitsgrad
Standard degree of purity
______________________________________________________
Strahlmittel
Blasting abrasives
General impression
Blasting method
3. Anstrich
Third painting
actual thickness
____________ m
____________ m
____________ m
____________ m
____________ m
____________ m
_____________________________________________________________________________________________________________________ ____________________________
11544 PP10 - Orderhandling
1/2
Innenliegender Anstrich
Soll-Ma
Ist-Ma
Inside painting
specified thickness
actual thickness
1. Anstrich
First painting
2. Anstrich
Second painting
3. Anstrich
Third painting
8
a
b
9
____________ m
____________ m
____________ m
____________ m
____________ m
____________ m
Nachbearbeitung erforderlich
ja
nein
Rework necessary
yes
no
Nachbearbeitung erledigt
ja
nein
Rework finished
yes
no
ja
nein
checked by manufacturer:
yes
no
Bemerkungen:
Remarks:
Der Hersteller besttigt die Richtigkeit der Angaben in diesem Inspektionsbericht und versichert, dass etwaige
anlsslich der Inspektion festgestellte Mngel umgehend beseitigt werden und dass keine weitergehenden Mngel
vorhanden sind. Die Inspektion entbindet den Hersteller nicht von seinen vertraglichen Gewhrleistungspflichten.
Smtliche Gewhrleistungsansprche von NEM Power-Systems gem Bestellung und Allgemeinen
Geschftsbedingungen von NEM Power-Systems bleiben ausdrcklich vorbehalten. NEM Power-Systems bleibt das
Recht erhalten, etwaige Mngel jederzeit whrend der vertraglich vereinbarten Gewhrleistungsfrist zu rgen.
The Manufacturer confirms the correctness of the information in this Inspection Report and warrants that any deficiencies observed during
the inspection are remedied forthwith, and that no further deficiencies are existing. This inspection does not release the Manufacturer from
its contractual warranty obligations. NEM Power-Systems warranty rights as provided in the Purchase Order and NEM Power-Systems
General Conditions of Purchase remain explicitly reserved. NEM Power-Systems right to notify the Manufacturer of any defects at any time
during the contractual agreed warranty period remains reserved.
Bemerkungen / Remarks
Hersteller / Manufacturer
Bemerkungen / Remarks
NEM Power-Systems
Bemerkungen / Remarks
Kunde / Client
____________________________
____________________
Unterschrift / Signature
Datum / Date
____________________________
____________________
Unterschrift / Signature
Datum / Date
____________________________
____________________
Unterschrift / Signature
Datum / Date
_____________________________________________________________________________________________________________________ ____________________________
11544 PP10 - Orderhandling
2/2
Inspektionsbericht
Kaminklappe
Inspectionreport
Stack Damper
NPS Auftrags-/Zeichungsnummer-Nr:
NPS Order-/Drawing No.:
Produkt / Product
Imeco / Vietnam
NEM B.V.
Kunde / Client
(*)HNE10AA001
Bauteilausfhrung
wie gezeichnet
spiegelbildlich
Component
as drawn
specular
Allgemeiner Eindruck
gut
Nachbearbeitung
General impression
good
rework
Schweinahtkontrolle
visuell in Ordnung
siehe Anlage
visually correct
see attachment
ja
nein
yes
no
ja
nein
Painting to Specification
yes
no
6
7
8
a
b
c
d
9
Abnahme in Einbaulage
ja
nein
yes
no
Isolierung angebaut
ja
nein
Insulation installed
yes
no
Lagerung
Bearings
Antriebsseite
Loslager
Festlager
Actuatorside
loosen Bearing
fixed Bearings
Rckseite
Loslager
Festlager
Back side
loosen Bearing
fixed Bearings
in Ordnung
Nachbearbeitung
as drawn
rework
in Ordnung
Nachbearbeitung
correct
rework
Stopfbuchsen
in Ordnung
Nachbearbeitung
Stuffing box
correct
rework
11
a
b
c
in Ordnung
Nachbearbeitung
correct
rework
Mittelwert:
Average figure:
________
mm
Kransen
Lifting lugs
ja
nein
yes
no
__________________ mm
__________________ mm
_____________________________________________________________________________________________________________________ ____________________________
Ident Nr. Q-Z-00-011-d
11544 PP10 - Orderhandling
1/4
Auenverrippung
Lifting lugs
ja
nein
yes
no
__________________ mm
__________________ mm
Flgel
Blades
__________________ mm
__________________ mm
Hebelradius
Lever radius
Antriebshebel
Actuator lever
__________________ mm
__________________ mm
__________________ mm
__________________ mm
Beweglich
ja
nein
Movable
yes
no
Mit h
Mitnehmerhebel
h b l (wenn
(
vorhanden)
h d )
Positiv key lever (iff applicable)
Beweglich
ja
nein
Movable
yes
no
ja
nein
yes
no
Gestnge eingestellt
ja
nein
Linkage adjusted
yes
no
ja
nein
yes
no
Drehbegrenzer n. Zeichnung
ja
nein
yes
no
Blockiervorrichtung n. Zeichnung
ja
nein
yes
no
Endschaltersystem n. Zeichnung
ja
nein
yes
no
Stellungsanzeiger n. Zeichnung
ja
nein
yes
no
ja
nein
yes
no
Geschweit
ja
nein
Welded
yes
no
Vorbereitung fr Baustellen-Schwei.
ja
nein
yes
no
_____________________________________________________________________________________________________________________ ____________________________
Ident Nr. Q-Z-00-011-d
11544 PP10 - Orderhandling
2/4
ja
nein
yes
no
Stellzeit gemessen
Operating time measured
Motorleistungsaufnahme gemessen
Power consumtion measured
__________________ s
________ V
________ A
________ kW
Nachbearbeitung
ja
nein
Rework
yes
no
erforderlich
ja
nein
necessary
yes
no
erledigt
ja
nein
finished
yes
no
__________________________
________________
Unterschrift/Signature
Datum/Date
eckig / scuare
II
Strmungsrichtung
Strmungsrichtung
flow direction
flow direction
round / scuare
A Int. Diamter / Dimension
B Flange to Flange / Int. Dimension
C Diam- / Width- Hole Pattern
D Hole Diam. / Height Hole Pattern
E Flange Thicknes / Diagonal Dim.
F Hole Pitch / Flange to Flange
G Flange Width / Flange Thickness
H
/ Corner Pitch Horizontal
I
/ Pitch Horizontal
J
/ Corner Pitch Vertical
K / Pitch Vertical
L
/ Hole size
Bemerkungen:
23
Remarks:
II
Flansch I
Flansch II
Flange I
Flange II
Soll-Ma
Ist-Ma
Soll-Ma
Ist-Ma
Specified
size [mm]
actual size
Specified
size [mm]
actual size
________
________
________
________
________
________
________
________
________
________
________
________
[mm]
________
________
________
________
________
________
________
________
________
________
________
________
________
________
________
________
________
________
________
________
________
________
________
________
[mm]
________
________
________
________
________
________
________
________
________
________
________
________
_____________________________________________________________________________________________________________________ ____________________________
Ident Nr. Q-Z-00-011-d
11544 PP10 - Orderhandling
3/4
Inspektionsbericht - Anstrich
_____________________________________________
_____________________________________________
____________________________________
_____________________________________________
____________________________________
25
ja
yes
_____________________________________________
nein
no
Der Hersteller besttigt die Richtigkeit der Angaben in diesem Inspektionsbericht und versichert, dass etwaige
anlsslich der Inspektion festgestellte Mngel umgehend beseitigt werden und dass keine weitergehenden Mngel
vorhanden sind. Die Inspektion entbindet den Hersteller nicht von seinen vertraglichen Gewhrleistungspflichten.
Smtliche Gewhrleistungsansprche von NEM Power-Systems gem Bestellung und Allgemeinen
Geschftsbedingungen von NEM Power-Systems bleiben ausdrcklich vorbehalten. NEM Power-Systems bleibt das
Recht erhalten, etwaige Mngel jederzeit whrend der vertraglich vereinbarten Gewhrleistungsfrist zu rgen.
The Manufacturer confirms the correctness of the information in this Inspection Report and warrants that any deficiencies observed during
the inspection are remedied forthwith, and that no further deficiencies are existing. This inspection does not release the Manufacturer from
its contractual warranty obligations. NEM Power-Systems warranty rights as provided in the Purchase Order and NEM Power-Systems
General Conditions of Purchase remain explicitly reserved. NEM Power-Systems right to notify the Manufacturer of any defects at any time
during the contractual agreed warranty period remains reserved.
Bemerkungen / Remarks
Hersteller / Manufacturer
Bemerkungen / Remarks
NEM Power-Systems
Bemerkungen / Remarks
Kunde / Client
____________________________
____________________
Unterschrift / Signature
Datum / Date
____________________________
____________________
Unterschrift / Signature
Datum / Date
____________________________
____________________
Unterschrift / Signature
Datum / Date
_____________________________________________________________________________________________________________________ ____________________________
Ident Nr. Q-Z-00-011-d
11544 PP10 - Orderhandling
4/4
Inspektionsbericht
Prfung Selbsffnungsdruck
Inspectionreport
Check of Self Opening Pressure
NPS Auftrags-/Zeichungsnummer-Nr:
NPS Order-/Drawing No.:
Produkt / Product
Hersteller Werk / Manufacturer
Imeco / Vietnam
Kunde / Client
(*)HNE10AA001
- _________
mF1
mF2
LF2
LF1
Note: View from actuator side
Distance from the center of the shaft to built-in lifting lug, where the lifting/measurement device is to be
installed:
LF1: 1223 mm
LF2: 1223 mm
Opening pressure is equivalent to below given theoretical figures of weights to be measured (for actual
figures of opening pressure please refer to related GAD of the project):
mF1: 94,8 9,5 kg
mF2: 94,8 9,5 kg
Weights measured during test:
mF1:_______kg
mF2:_______kg
Notes:
Blades should only be lifted as much as necessary to ensure that they are no longer supported by the ledges,
never exceeding the exact horizontal position.
The lifting/measuring device shall pull in exact vertical orientation. Inclined pull leads to wrong results!
The figures of the weights refer to the given distances LF1 and LF2 in which the lifting/measuring device is to be
installed. In case the test can not be made by using above distances, please inform about the actual distance, in
which the measurement device is installed and submit data sheet to NPS office for approval/revision.
The measured weight must be within the range of theoretical figures stated above! In case these figures of
weights can not be achieved while having the lifting device installed correctly, adjustments can be made by
reducing or increasing the number of additional weights located on the blades.
_________________________________________________________________________________________________________________________________________________
Ident Nr. Q-Z-00-031-0
A11544 - KA
1/2
Inspektionsbericht
Prfung Selbsffnungsdruck
Inspectionreport
Check of Self Opening Pressure
Bericht Nr: / Report No.:
- _________
Der Hersteller besttigt die Richtigkeit der Angaben in diesem Inspektionsbericht und versichert, dass etwaige
anlsslich der Inspektion festgestellte Mngel umgehend beseitigt werden und dass keine weitergehenden Mngel
vorhanden sind. Die Inspektion entbindet den Hersteller nicht von seinen vertraglichen Gewhrleistungspflichten.
Smtliche Gewhrleistungsansprche von NEM Power-Systems gem Bestellung und Allgemeinen
Geschftsbedingungen von NEM Power-Systems bleiben ausdrcklich vorbehalten. NEM Power-Systems bleibt das
Recht erhalten, etwaige Mngel jederzeit whrend der vertraglich vereinbarten Gewhrleistungsfrist zu rgen.
The Manufacturer confirms the correctness of the information in this Inspection Report and warrants that any deficiencies observed during
the inspection are remedied forthwith, and that no further deficiencies are existing. This inspection does not release the Manufacturer from its
contractual warranty obligations. NEM Power-Systems warranty rights as provided in the Purchase Order and NEM Power-Systems
General Conditions of Purchase remain explicitly reserved. NEM Power-Systems right to notify the Manufacturer of any defects at any time
during the contractual agreed warranty period remains reserved.
Bemerkungen / Remarks
Hersteller / Manufacturer
: _________________________________
____________________
Unterschrift / Signature
Datum / Date
Bemerkungen / Remarks
NEM Power-Systems
: _________________________________
____________________
Unterschrift / Signature
Datum / Date
Bemerkungen / Remarks
Kunde / Client
: _________________________________
____________________
Unterschrift / Signature
Datum / Date
_________________________________________________________________________________________________________________________________________________
Ident Nr. Q-Z-00-031-0
A11544 - KA
2/2
Inspektionsbericht
Funktionstest
Inspectionreport
Stroke Test
NPS Auftrags-/Zeichungsnummer-Nr:
NPS Order-/Drawing No.:
Produkt / Product:
Imeco, Vietnam
Kunde / Client:
(*)HNE10AA001
- _________
Each damper shall be cycled through its complete stroke, open to close ten (10) times. Stroke times, motor
voltage und current shall be monitored and recorded as part of the test. Due to the duty rating of the motor the
test must be suspended after 5 cycles in a row for minimum 20 min. In any case the temperature of motor and
gear must be observed, in order to avoid overheating.
Cycle No.
Stroke time
open
[s]
Stroke time
close
[s]
Motor voltage
close stroke
[V]
Motor current
close stroke
[A]
1
2
3
4
5
minimum 20 min suspension of test, check motor and gear temperature
6
7
8
9
10
_____________________________________________________________________________________________________________________ ____________________________
Ident Nr. Q-Z-00-033-0
11544 PP10 - Orderhandling
1/2
- _________
Der Hersteller besttigt die Richtigkeit der Angaben in diesem Inspektionsbericht und versichert, dass etwaige
anlsslich der Inspektion festgestellte Mngel umgehend beseitigt werden und dass keine weitergehenden Mngel
vorhanden sind. Die Inspektion entbindet den Hersteller nicht von seinen vertraglichen Gewhrleistungspflichten.
Smtliche Gewhrleistungsansprche von NEM Power-Systems gem Bestellung und Allgemeinen
Geschftsbedingungen von NEM Power-Systems bleiben ausdrcklich vorbehalten. NEM Power-Systems bleibt das
Recht erhalten, etwaige Mngel jederzeit whrend der vertraglich vereinbarten Gewhrleistungsfrist zu rgen.
The Manufacturer confirms the correctness of the information in this Inspection Report and warrants that any deficiencies observed during
the inspection are remedied forthwith, and that no further deficiencies are existing. This inspection does not release the Manufacturer from
its contractual warranty obligations. NEM Power-Systems warranty rights as provided in the Purchase Order and NEM Power-Systems
General Conditions of Purchase remain explicitly reserved. NEM Power-Systems right to notify the Manufacturer of any defects at any time
during the contractual agreed warranty period remains reserved.
Bemerkungen / Remarks
Hersteller / Manufacturer
____________________
Datum / Date
Bemerkungen / Remarks
NEM Power-Systems
____________________
Datum / Date
Bemerkungen / Remarks
Kunde / Client
____________________
Datum / Date
_____________________________________________________________________________________________________________________ ____________________________
Ident Nr. Q-Z-00-033-0
11544 PP10 - Orderhandling
2/2