SECRETARA DE INFRAESTRUCTURA
TRMITE DE PAGO DE ESTIMACIONES
No. DE CONTRATO:
OBRA:
( FORMATO SI-5)
LOCALIDADES:
ESTIMACIN NO :
MUNICIPIO:
CONTRATISTA:
PERIODO DE EJECUCION:
MIERCOLES 20-08-14
CLAVE
DIRECCIN OPERATIVA:
DELEGACION REGIONAL:
CONCEPTO
REA
PURPURA ENTRE TERRACOTA
Y BERMELLON (FRACC.
MONTERREAL)
LOCALIZACIN
EJE
PURPURA
CALLE DE POR
MEDIO
TRAMO
ENTRE
TERRACOTA Y
BERMELLON
UNIDAD
LARGO
ANCHO
SUB-TOTAL
OBSERVACIONES
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
2.20
9.50
4.50
3.40
3.10
3.50
4.60
3.10
7.70
2.80
3.80
1.80
2.60
5.00
1.10
2.10
7.00
2.50
8.10
4.60
3.50
2.50
3.40
7.80
1.90
3.20
3.30
7.90
15.80
4.20
5.40
2.10
5.00
3.30
2.00
2.50
ALTO
PZA
17.82
43.70
15.75
8.50
10.54
27.30
8.74
9.92
25.41
22.12
60.04
7.56
14.04
10.50
5.50
6.93
14.00
6.25
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
ENTRE 15 PTE
NTE Y FRACC.
VALLE DORADO
M2
M2
M2
M2
M2
M2
4.65
2.25
2.95
1.60
2.80
3.30
14.70
3.20
3.10
1.00
6.00
6.50
68.36
7.20
9.15
1.60
16.80
21.45
1
2
3
4
5
6
TOTAL
ELABOR
439.18
REVIS Y AUTORIZ
NOMBRE
ING. ALEJANDRO LOPEZ GALVEZ