Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
1. Invitation to Bid.
- Request for Appointment slip
- Request for messengerial request
- Request for Vehicle request
2. Attend to Pre-bid, site inspection
- Study First
-Bring the ff.
Camera
Plan ( Floor, Ceiling , wall, Elevation)
-Scope of work?
-information to get:
Slab Heigth, Topping and Palstering are included
Waterproofing
Rennovation
- Floor to Slab Heigth:_______
- Cladding Walll Details:________
- Topping Point?:
- MEPF are included?:
- Knock the door to distinguish finish
3. Minute of prebid
Important Date
Scope of Works
Person in prebid
Other topic in Prebid
4. Quotation
5. Estimate and Take off