Sei sulla pagina 1di 2

Document No.

: ANGL - TPM - JH - 3
Rev No. : 1

Jishu Hozen - Pre Tentative Standards


Department: switchyard

Machine : 120 MVA Trafo-2

Month : October-14

Cleaning

(C)
(It is before
initiating
jishu hozen
task. This is
one time
document
same shall
be reviewed
after 3rd step
to ascertain
whether clit
time has
reduced by
90%)

Lubrication Tightning

(L)

Inspection

(T)

2
NA

NA

Who perform

(I)

NA

1 days
2 hours

Method

Tools used

Ramesh/Varun

manual

cloth,caustic soda,
water spray

NA

NA

NA

Kailash Nayak/Santosh

manual

spanner set

saurabh singh

manual

Frequency

1
NA
1
twice in a weak

CLIT time per month = 22 hours approx.

TPM - JH - 3

ev No. : 1

Total Time
in Man
minutes

2 days
NA
1 day
4 hous

Potrebbero piacerti anche