OBRA:

METRADO DE ACERO
CONSTRUCCION DE 02 AULAS + 01 BATERIA DE SS.HH. - LAMPA

FORM.

ESTRUCTURA

OBRA:

METRADO DE ACERO
CONSTRUCCION DE 2 AULAS + SS.HH.I.E.P. N 70658 - LAMPA

FORM.

ESTRUCTURA

SS.HH.

Diseo

Descripcion

N de

N de

Long.

del

elemtos.

piezas x

Por

1/4"

fierro

iguales

elemento

pieza

0.248

10

1.00

ZAPATAS
Z-1

1/2"

Longitu

PESO TOTAL DE ACERO EN ZAPATAS


COLUMNAS
C-1

verticales

Estribos
C-2

verticales

Estribos

1/2"

4.50

1/4"

22

1.10

3/8"

4.50

1/4"

22

1.10

96.8
48.0

PESO TOTAL DE ACERO EN COLUMNAS


VIGAS
VP - 101

horiz.

1/2"

5.95

VP - 101

horiz. (-)

1/2"

3.20

VP - 101

horiz. (+)

1/2"

4.10

1/4"

36

1.25

1/2"

4.40

1/4"

25

1.25

1/2"

5.10

1/4"

32

0.90

Estribos / tramo
VA - 101

horiz.

Estribos / tramo
V-CH.

horiz.

Estribos

90.0
62.5
28.8

PESO TOTAL DEL ACERO EN VIGAS 1ER NIVEL


LOSA ALIGERADA
Acero (+)

horiz.

1/2"

16

1.0

5.55

Acero (-)

horiz.

1/2"

16

1.0

3.60

1/4"

20

6.20

124

Temperatura

PESO TOTAL DEL ACERO EN LOSA ALIGERADA

.HH. - LAMPA

Longitud (m) por

Peso

3/8"

1/2"

5/8"

3/4"

1"

0.560

0.994

1.552

2.235

3.973

40.0

kg
39.760
39.8

54.0
-

72.0

71.568

24.006

30.240

11.904
137.718

47.6

47.314

6.4

6.362

8.2

8.151

50.400

34.989

15.500

20.278

35.2
20.4
-

7.142
190.136

88.8

88.27

57.6

57.25

30.75
176.27

METRADOS
OBRA:

CONSTRUCCION DE 02 AULAS + 01 BATERIA DE SS.HH. - LAMPA

FORM.

SS.HH. I.E.P.N70658 CHAOCAHUA

ITEM

DESCRIPCION

01
02

Und.

MEDIDAS

N
VEC

LARGO

ANCHO

ALTO

PARCIAL TOTAL

ESTRUCTURAS
OBRAS PRELIMINARES

02.01

LIMPIEZA DE TERRENO MANUAL

m2

1.00

5.65

4.85 .

27.40

27.40

02.02

TRAZO, NIVEL Y REPLANTEO

m2

1.00

5.65

4.85 .

27.40

27.40

4.00

1.00

1.00

1.00

4.00

4.00

EJE A,A ENTRE 1,2

2.00

5.15

0.45

0.75

3.48

RESTAR PUERTA P-1

2.00

1.00

0.45

0.75

-0.68

EJE 1,1 ENTRE A,B

2.00

3.55

0.45

0.75

2.40

EJE 1,2 ENTRE A,B - INTERMEDIO

1.00

3.55

0.45

0.75

1.20

EJE 1,2 ENTRE A,B - INTERMEDIO

1.00

2.40

0.45

0.75

0.81

2.00

5.15

3.55

0.15

5.48

1.00

EJE A,A ENTRE 1,2

2.00

5.15

RESTAR PUERTA P-1

2.00

EJE 1,1 ENTRE A,B

2.00

EJE 1,2 ENTRE A,B - INTERMEDIO


EJE 1,2 ENTRE A,B - INTERMEDIO

03

MOVIMIENTO DE TIERRAS

03.01

EXCAVACION MANUAL PARA ZAPATAS

m3

03.02

EXCAVACION DE ZANJAS PARA CIMIENTOS

m3

03.03

RELLENO Y COMPACTADO CON MATERIAL DE CANTERA

m3

EJE A,B ENTRE 1,2


03.04
04
04.01

04.02

ELIMINACION DE MATERIAL EXCEDENTE

m3

5.59

0.45

0.6

2.78

1.00

0.45

0.6

-0.54

3.55

0.45

0.6

1.92

1.00

3.55

0.45

0.6

0.96

1.00

2.40

0.45

0.6

0.65

EJE A,A ENTRE 1,2

2.00

5.15

0.15

0.4

0.62

RESTAR PUERTA P-1

2.00

1.00

0.15

0.4

-0.12

EJE 1,1 ENTRE A,B

2.00

3.55

0.15

0.4

0.43

EJE 1,2 ENTRE A,B - INTERMEDIO

1.00

3.55

0.15

0.4

0.21

EJE 1,2 ENTRE A,B - INTERMEDIO

1.00

2.40

0.15

0.4

0.14

4.00

1.00

1.00

0.1

0.4

CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON 30% PIEDRA

CONCRETO 1:8+25% PM PARA SOBRECIMIENTOS

m3

5.59
5.76

m3

CONCRETO 1:8 PARA SOLADOS

m3

04.04

CONCRETO EN FALSOPISO MEZCLA 1:8 CEMENTO-HORMIGON E=4"

m2

EJE A,B ENTRE 1,2


05.01

5.48

OBRAS DE CONCRETO SIMPLE

04.03

05

7.21

1.28

0.42
21.122

1.00

5.35

3.76 .

1.00

20.116

OBRAS DE CONCRETO ARMADO


ZAPATAS

05.01.01

CONCRETO EN ZAPATAS f'c=175 kg/cm2

m3

4.00

1.00

05.01.02

ACERO fy=4200 kg/cm2 GRADO 60

kg

4.00

4.00

0.25

0.25

3.05

0.7625

2.00

0.15

0.30

3.05

0.2745

C-1

4.00

1.00

3.05

12.2

C-2

2.00

0.90

3.05

5.49

1.00

EJE 1,1 ENTRE A,B

2.00

4.05

0.25

EJE B,B ENTRE 1,2

2.00

5.65

EJE A,B ENTRE 1,2

1.00

4.78

EJE 1,1 ENTRE A,B

2.00

4.05

EJE B,B ENTRE 1,2

2.00

5.65

EJE A,B ENTRE 1,2

1.00

4.78

0.15 .

0.72

kg

1.00

. .

190.1356

199.64

m3

1.00

6.05

5.50

3.00

1.00

05.02

CONCRETO EN COLUMNAS f'c=210 kg/cm2


C-2

05.02.02

05.03.01

05.03.02

05.03.03
05.04
05.04.01

1.68
41.75

m3

C-1

05.03

1.6
39.76

COLUMNAS

05.02.01

05.02.03

0.4

. .

ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS

ACERO fy=4200 kg/cm2 GRADO 60

1.11

m2

kg

18.57

. .

137.7184

144.6

VIGAS
CONCRETO EN VIGAS f'c=210 kg/cm2

ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS

ACERO fy=4200 kg/cm2 GRADO 60

m3

1.66
0.3

0.61

0.25

0.3

0.85

0.15

0.17

0.12

0.55

4.46

0.55

6.22

m2

11.39

LOSAS ALIGERADAS
CONCRETO EN LOSAS ALIGERADAS f'c=210 kg/cm2
RESTA LADRILLO DE TECHO (0.25X0.25X0.12)

5.35
.

0.17
.

05.04.02

ENCOFRADO Y DESENCOFRADO NORMAL EN LOSAS ALIGERADAS

m2

1.00

6.05

32.3675

32.37

05.04.03

ACERO fy=4200 kg/cm2 GRADO 60

kg

1.00

176.2736

185.09

LADRILLO HUECO DE ARCILLA h=12 cm PARA TECHO ALIGERADO

1.00

375

382.5

EJE B,B ENTRE 1,2

2.00

5.15

2.4

24.72

RESTAR V-1

2.00

1.33

0.6

-1.596

RESTAR V-2

1.00

1.20

0.5

-0.6

RESTAR PUERTA P-1

2.00

1.00

2.4

-4.8

EJE 1,1 ENTRE A,B

2.00

3.55

2.4

17.04

EJE 1,2 ENTRE A,B - INTERMEDIO

2.00

3.55

2.4

17.04

EJE 1,2 ENTRE A,B - INTERMEDIO

2.00

2.40

2.4

11.52

05.04.04
06
06.01

07

5.35

-2.65

ALBAILERIA
MURO DE SOGA LADRILLO KING-KONG CON CEMENTO-ARENA

PRUEBAS DE LABORATORIO

m2

63.32

ITEM
07.01

DESCRIPCION
PRUEBA DE CALIDAD DEL CONCRETO (PRUEBA A LA COMPRESION)

09.01
09.02
10
10.01

10.02

10.03

PARCIAL TOTAL

LARGO

ANCHO

ALTO

2.00

2.00

2.00

TRAZO, NIVEL Y REPLANTEO

m2

1.00

5.65

27.40

27.40

LIMPIEZA DURANTE LA EJECUCION DE LA OBRA

mes

4.00

4.00

4.00

EJE B,B ENTRE 1,2

2.00

5.15

2.4

24.72

RESTAR V-1

2.00

1.33

0.6

-1.596

RESTAR V-2

1.00

1.20

0.5

-0.6

RESTAR PUERTA P-1

2.00

1.00

2.4

-4.8

EJE 1,1 ENTRE A,B

2.00

3.55

2.4

17.04

EJE 1,2 ENTRE A,B - INTERMEDIO

2.00

3.55

2.4

17.04

EJE 1,2 ENTRE A,B - INTERMEDIO

2.00

2.40

2.4

11.52

EJE B,B ENTRE 1,2

2.00

5.15

2.7

27.81

RESTAR V-1

2.00

1.33

0.6

-1.596

RESTAR V-2

1.00

1.20

0.5

-0.6

RESTAR PUERTA P-1

2.00

1.00

2.7

-5.4

EJE 1,1 ENTRE A,B

2.00

3.55

2.7

19.17

EJE 1,2 ENTRE A,B - INTERMEDIO

2.00

3.55

2.7

19.17

EJE 1,2 ENTRE A,B - INTERMEDIO

2.00

2.40

2.7

12.96

RESTAR V-1

2.00

3.86

7.72

RESTAR V-2

1.00

3.40

3.4

2.00

6.80

13.6

1.00

120.00

EJE B,B ENTRE 1,2

2.00

5.15

20.6

RESTAR V-1

2.00

1.33

0.6

-1.596

RESTAR V-2

1.00

1.20

0.5

-0.6

RESTAR PUERTA P-1

2.00

1.00

-4

EJE 1,1 ENTRE A,B

2.00

3.55

14.2

EJE 1,2 ENTRE A,B - INTERMEDIO

2.00

3.55

14.2

EJE 1,2 ENTRE A,B - INTERMEDIO

2.00

2.40

9.6

ARQUITECTURA
OBRAS PRELIMINARES
4.85

REVOQUES ENLUCIDOS Y MOLDURAS


TARRAJEO EN INTERIORES ACABADO CON CEMENTO-ARENA

TARRAJEO EN EXTERIORES CEMENTO - ARENA 1:5X1.5CM INCLUIDO COLUMNAS

VESTIDURA DE DERRAMES CEMENTO-ARENA 1:5X1.5CM

m2

63.32

m2

71.51

RESTAR PUERTA P-1


10.04

BRUAS

10.05

EMCHAPE EN PARED DE SS.HH. H=1.20M

m2

11

MEDIDAS

N
VEC

08
09

Und.

24.72

120.00
52.404

PISOS Y CONTRAPISOS

11.01

FALSO PISO DE 4" DE CONCRETO 1:10

m2

1.00

5.15

3.55 .

18.28

18.28

11.02

VEREDA RIGIDA DE CONCRETO f'c=140 kg/cm2 E=10 cm PASTA 1:2

m2

1.00

5.65

0.80 .

4.52

4.52

11.03

ENCOFRADO Y DESENCOFRADO EN VEREDA

m2

1.00

7.25

11.04

PISO DE LOSETA VENECIANA DE COLOR CLARO DE 30X30 cm

m2

1.00

5.15

1.00

18.50

12
12.01
13
13.01

13.02
14
14.01
15
15.01

16

0.25

1.813

1.81

3.55 .

18.28

19.20

. .

18.5

18.5

CONTRAZOCALOS
CONTRAZOCALO CEMENTO SIN COLOREAR H = 40 cm
CARPINTERIA METALICA
VENTANA METALICA SEGUN DISEO

3.00

V-1

2.00

2.00

V-2

1.00

1.00

5.00

5.00

5.00

2.00

2.00

2.00

2.196

23.64

V-1

2.00

1.33

0.6

1.596

V-2

1.00

1.20

0.5

0.6

PUERTA METALICA CON ACCESORIOS P-2


CARPINTERIA DE MADERA
PUERTA DE MADERA P-1
VIDRIOS, CRISTALES Y SIMILARES
VIDRIOS DOBLES NACIONALES

p2

CERRAJERIA

16.01

CERRADURA PARA PUERTA PRINCIPAL PESADA

pza

2.00

2.00

2.00

16.02

BISAGRA CAPUCHINA DE 3 1/2" X 3 1/2"

pza

2.00

4.00

8.00

EJE B,B ENTRE 1,2

2.00

5.15

2.4

24.72

RESTAR V-1

2.00

1.33

0.6

-1.596

RESTAR V-2

1.00

1.20

0.5

-0.6

RESTAR PUERTA P-1

2.00

1.00

2.4

-4.8

EJE 1,1 ENTRE A,B

2.00

3.55

2.4

17.04

2.00

3.55

2.4

17.04

2.00

2.40

2.4

11.52

EJE B,B ENTRE 1,2

2.00

5.15

2.7

27.81

RESTAR V-1

2.00

1.33

0.6

-1.596

RESTAR V-2

1.00

1.20

0.5

-0.6

RESTAR PUERTA P-1

2.00

1.00

2.7

-5.4

EJE 1,1 ENTRE A,B

2.00

3.55

2.7

19.17

EJE 1,2 ENTRE A,B - INTERMEDIO

2.00

3.55

2.7

19.17

EJE 1,2 ENTRE A,B - INTERMEDIO

2.00

2.40

2.7

12.96

17
17.01

PINTURA
PINTURA EN INTERIORES AL TEMPLE 2 MANOS

m2

EJE 1,2 ENTRE A,B - INTERMEDIO


EJE 1,2 ENTRE A,B - INTERMEDIO
17.02

17.03
17.04

PINTURA EN EXTERIORES AL TEMPLE 2 MANOS

m2

PINTURA EN PUERTAS CON BARNIZ 2 MANOS

m2

PUERTA DE MADERA P-1

PINTURA EN VENTANAS CON ESMALTE 2 MANOS

m2

V-1
V-2
17.05

PINTURA EN MANPARAS DE SS.HH. CON ESMALTE 2 MANOS

18.01

71.51

4.00

1.00

2.40

9.60

9.60
4.39

4.00

1.33

0.6

3.192

2.00

1.20

0.5

1.2

5.00

0.65

1.85

6.0125

4.00

m2

P-2
18

63.32

12.025

VARIOS
LIMPIEZA DE DE PARTIDAS EJECUTADOS

glb

4.00

4.00

ITEM

DESCRIPCION

19
20
20.01

Und.

MEDIDAS

N
VEC

LARGO

ANCHO

ALTO

PARCIAL TOTAL

INSTALACIONES SANITARIAS
OBRAS PRELIMINARES
m2

1.00

5.65

27.40

27.40

21.01

INODORO TANQUE BAJO BLANCO

pza

5.00

5.00

5.00

21.02

LAVATORIO DE PARED BLANCO 1 LLAVE

pza

5.00

5.00

5.00

21.03

URINARIOS CORRIDO DE CERAMICO

pza

1.00

1.00

1.00

21.04

CAJA DE REGISTRO DE DESAGUE 14" X 18"

pza

2.00

2.00

2.00

21.05

SUMIDEROS DE 2"

pza

4.00

4.00

4.00

21.06

REGISTROS ROSCADO DE BRONCE DE 2"

pza

2.00

2.00

2.00

21.07

REGISTROS ROSCADO DE BRONCE DE 4"

pza

2.00

2.00

2.00

21.08

COLOCACION DE INSUMOS EN INODORO Y LAVATORIO

pza

5.00

5.00

5.00

21.09

COLOCACION DE APARATOS SANITARIOS

pza

10.00

10.00

10.00

21.10

TUBERIA DE PVC SAL 4"

15.00

15.00

15.00

21.11

TUBERIA DE PVC SAL 2"

19.00

19.00

19.00

21.12

POZO SEPTICO

glb

1.00

1.00

1.00

21

22

TRAZO, NIVEL Y REPLANTEO

4.85 .

SISTEMA DE DESAGUE

AGUA FRIA

22.01

SALIDA DE AGUA FRIA CON TUBERIA DE PVC-SAP 3/4"

pto

12.00

12.00

12.00

22.02

RED DE DISTRIBUCION TUBERIA DE 3/4" PVC-SAP

35.00

35.00

35.00

22.03

VALVULA DE COMPUERTA 3/4"

3.00

3.00

3.00

22.04

INSTALACION DE AGUA POTABLE

glb

1.00

1.00

1.00

22.05

POZO SUBTERRANEO Y TANQUE ELEVADO DE FIBRA

pza

1.00

1.00

1.00

1.00

1.00

1.00

pto

4.00

4.00

4.00

pto

2.00

2.00

2.00

pza

2.00

2.00

2.00

23
23.01
23.01.01
23.02
23.02.01
23.03
23.03.01
23.04
23.04.01
23.05

INSTALACIONES ELECTRICAS
TABLERO DE DISTRIBUCION
TABLERO ELECTRICO GABINETE METALICO PARA DISTRIBUCION DE 3 CIRCUITOS
CENTRO DE LUZ
SALIDA PARA CENTROS DE LUZ EN TECHO
TOMACORRIENTES
SALIDA PARA TOMACORRIENTES BIPOLARES SIMPLES CON PVC
INTERRUPTORES
INTERRUPTOR THERMOMAGNETICO MONOFASICA 2 X 30A
ACCESORIOS

23.05.01

TUBERIAS PVC SAP (ELECTRICAS) D=3/4"

15.00

15.00

15.00

23.05.03

COLOCACION DE TAPAS PARA INTERRUPTORES, TOMACORRIENTES, CENTROS DE LUZ

glb

1.00

1.00

1.00

glb

1.00

1.00

1.00

pza

4.00

4.00

4.00

23.06
23.06.01
23.07
23.07.01

CONDUCTOR
CABLEADO
ARTEFACTOS DE ILUMINACION
FLUORECENTES