Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
AMIE SECTION B
Example: An hydroelectric power station is to be designed to operate at a mean head of 205 m and supplied from
a reservoir having a catchment area of 1000 km2 with average annual rainfall of 125 cm of which 80% is available
for power generation. The expected load factor at the plant is 75%. Allowing a head loss of 5 m and assuming
efficiency of turbine and generator to be respectively 90% and 95%, calculate suitable MW rating of the station.
Comment also on the type of turbine to be installed.
(A. M. I. E. Sec. B. Power System Winter 1999)
Solution: Catchment area = 1,000 km2 = 1,000 106 m2
Average annual rainfall = 125 cm = 1.25 m
Yield factor = 80% or 0.8
QANNUM = Catchment area average annual rainfall yield factor
= 1,000 106 1.25 0.8 = 1,000 106 m3
Quantity of water available for utilization per second
Q second =
= 31.71 m3
.
.
= 70.9 MW Ans.
The type of turbine used for a head of 200 m recommended is Francis turbine. Because as compared to Pelton wheel a
Francis turbine offers the advantage of high efficiency at full load and at 75% of full load.