Sei sulla pagina 1di 4

March 18, 2014

To
The joint Director
Directorate of Industrial safety and Health,
Thane
Sub: REPORT ON MOCK DRILL
Dear Sir,
A mock drill was held on March 10, 2014 at 11:00 hrs at Machine Building Division
(MBD) Design office of Mukand Ltd., Kalwe -Thane. This drill was witnessed by senior
executives of our Company.
Mr. Swapneel Pangerkar, Fire Officer explained the incident scenario to all participants &
observers. This was followed by the Mock Drill.
Scenario

Electrical fire due to short circuit in pantry room.

There was electrical fire due to short circuit in pantry room of MBD Design office. On
sensing smoke in the pantry room, the smoke detector gets activated and triggers
audio alarm.
The mock drill was properly conducted at site and then all the members were
assembled in the MBD training centre for detail discussions on their observations.
The following were deputed as observers:Sr.
No

Name of the observer

Location

1.

Mr. P M Deshpande

Incident site

2.

Mr. Prakash Pote

Assembly Point

3.

Mr. G V Ratnam

Emergency Control Centre

Mr. Maloji Patil

Dispensary

The exercise was conducted at site and then all the members were assembled in
the training centre for detail discussions on their observations.

Remarks and suggestions by observers:-

The following suggestions were received from observers during feedback


session;
Sr.
No.

Points

As existing Emergency siren installed at ganesh gate was not clearly audible at
MBD area, a dedicated siren to be installed for MBD area.

Unwanted material was lying on the way of south side Emergency exit door
obstructing safe evacuation. Emergency access should be kept free from
obstacles.

All observers have appreciated the efforts taken by all participants of Mukand
Ltd. for conducting the mock drill to increase the preparedness & awareness of
all the people working in the area.
This is for your perusal and kind information please.
Thanking you,
Yours faithfully,
For Mukand Ltd

Prakash Pote
Factory Manager
Mukand Ltd., Kalwe Thane.

Encl.: Photographs of mock drill.

Mock Drill Photographs


1) Mock drill Scenario presentation

2) Incident location

3) Employees going towards Assembly pt

4) Fire tender arrival at site

5) Fire crew in action for fire fighting

6) Arrival of Ambulance

PTO

7) Shifting of casualty to OHC

9) Causality Shifting from Ambulance to OHC

11) Observers observing the scenario

8) Causality Treatment inside the Ambulance

10) Employees assembled at assembly point

12) Feedback session on observation