Sei sulla pagina 1di 6

Sunday, April 13, 2014, 06:58 PM

PAGE NO.

****************************************************
*
*
*
STAAD.Pro
*
*
Version 2007
Build 04
*
*
Proprietary Program of
*
*
Research Engineers, Intl.
*
*
Date=
APR 13, 2014
*
*
Time=
18:55:38
*
*
*
*
USER ID:
*
****************************************************

1. STAAD SPACE
INPUT FILE: Baseframe Penampaan Uken 2 MT 25m.STD
2. START JOB INFORMATION
3. ENGINEER DATE 13-APR-14
4. JOB NAME PENAMPAAN UKEN 2 MT 25M
5. JOB CLIENT PT. DAYAMITRA TELEKOMUNIKASI
6. END JOB INFORMATION
7. INPUT WIDTH 79
8. UNIT CM KG
9. JOINT COORDINATES
10. 3 35.5 0 0; 4 35.5 0 400; 6 35.5 0 200; 8 35.5 0 67.75; 10 35.5 0 332.25
11. 22 300 0 0; 23 300 0 67.75; 24 300 0 200; 25 300 0 332.25; 26 300 0 400
12. MEMBER INCIDENCES
13. 4 4 10; 6 6 8; 9 8 3; 12 10 6; 24 22 23; 25 24 25; 26 23 24; 27 25 26; 28 6 24
14. 29 8 23; 30 10 25
15. DEFINE MATERIAL START
16. ISOTROPIC STEEL
17. E 2.09042E+006
18. POISSON 0.3
19. DENSITY 0.00783341
20. ALPHA 1.2E-005
21. DAMP 0.03
22. END DEFINE MATERIAL
23. MEMBER PROPERTY JAPANESE
24. 4 6 9 12 24 TO 27 29 30 TABLE ST H450X200X9
25. 28 TABLE ST H250X125X6
26. CONSTANTS
27. MATERIAL STEEL ALL
28. MEMBER RELEASE
29. 28 TO 30 START MY
30. 28 TO 30 END MY
31. SUPPORTS
32. 3 4 22 26 PINNED
33. LOAD 1 LOADTYPE DEAD TITLE DEAD LOAD
34. SELFWEIGHT Y -1 LIST 4 6 9 12 24 TO 30
35. UNIT METER KN
36. LOAD 2 LOADTYPE WIND TITLE TOWER LOAD 1
37. JOINT LOAD

D:\Project Raxaya\Mitratel\2014\New Site\04. Sumbagut\PT. Tanato Prima Lestari\Penempakan Uken\Building Analysis\Baseframe


Page 1 of 6

Sunday, April 13, 2014, 06:58 PM


STAAD SPACE
38.
39.
40.
41.
42.
43.
44.
45.
46.
47.
48.
49.
50.
51.
52.
53.
54.
55.
56.
57.
58.
59.
60.
61.
62.
63.
64.
65.
66.
67.
68.
69.

-- PAGE NO.

25 FX 7.174 FY -159.477 FZ -13.94 MX 0.038 MY 0.012 MZ -0.245


10 FX -5.268 FY 120.226 FZ -11.938 MX 0.096 MY 0.012 MZ 0.187
8 FX 5.916 FY 123.957 FZ -11.526 MX 0.073 MY -0.01 MZ -0.176
23 FX -7.656 FY -155.613 FZ -13.153 MX 0.027 MY -0.01 MZ 0.222
LOAD 3 LOADTYPE WIND TITLE TOWER LOAD 2
JOINT LOAD
25 FX 13.418 FY -200.653 FZ -13.609 MX -0.119 MZ -0.123
10 FX 5.267 FY -21.007 FZ -3.133 MX 0.21 MY 0.015 MZ 0.15
8 FX 11.795 FY 165.168 FZ -11.579 MX -0.073 MZ -0.065
23 FX 3.245 FY -14.416 FZ -4.732 MX 0.151 MY -0.014 MZ 0.196
LOAD 4 LOADTYPE WIND TITLE TOWER LOAD 3
JOINT LOAD
8 FX 7.174 FY -159.477 FZ -13.94 MX 0.038 MY 0.012 MZ -0.245
23 FX -5.268 FY 120.226 FZ -11.938 MX 0.096 MY 0.012 MZ 0.187
25 FX 5.916 FY 123.957 FZ -11.526 MX 0.073 MY -0.01 MZ -0.176
10 FX -7.656 FY -155.613 FZ -13.153 MX 0.027 MY -0.01 MZ 0.222
LOAD 5 LOADTYPE WIND TITLE TOWER LOAD 4
JOINT LOAD
8 FX 13.418 FY -200.653 FZ -13.609 MX -0.119 MZ -0.123
23 FX 5.267 FY -21.007 FZ -3.133 MX 0.21 MY 0.015 MZ 0.15
25 FX 11.795 FY 165.168 FZ -11.579 MX -0.073 MZ -0.065
10 FX 3.245 FY -14.416 FZ -4.732 MX 0.151 MY -0.014 MZ 0.196
UNIT CM KG
LOAD COMB 6 COMBINATION LOAD CASE 6
1 1.0 2 1.3
LOAD COMB 7 COMBINATION LOAD CASE 7
1 1.0 3 1.3
LOAD COMB 8 COMBINATION LOAD CASE 8
1 1.0 4 1.3
LOAD COMB 9 COMBINATION LOAD CASE 9
1 1.0 5 1.3
PERFORM ANALYSIS

P R O B L E M
S T A T I S T I C S
----------------------------------NUMBER OF JOINTS/MEMBER+ELEMENTS/SUPPORTS =

10/

11/

SOLVER USED IS THE IN-CORE ADVANCED SOLVER


TOTAL PRIMARY LOAD CASES =

5, TOTAL DEGREES OF FREEDOM =

48

70. PARAMETER 1
71. CODE AISC
72. CHECK CODE ALL

D:\Project Raxaya\Mitratel\2014\New Site\04. Sumbagut\PT. Tanato Prima Lestari\Penempakan Uken\Building Analysis\Baseframe


Page 2 of 6

Sunday, April 13, 2014, 06:58 PM


STAAD SPACE

-- PAGE NO.

STAAD.Pro CODE CHECKING - (AISC 9TH EDITION)


***********************

ALL UNITS ARE - KG


MEMBER

CM

(UNLESS OTHERWISE NOTED)

RESULT/
CRITICAL COND/
RATIO/
LOADING/
FX
MY
MZ
LOCATION
=======================================================================

12

24

25

26

27

28

29

30

TABLE

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

H450X200X9
PASS
1761.27 T
H450X200X9
PASS
199.31 T
H450X200X9
PASS
1604.74 C
H450X200X9
PASS
199.31 T
H450X200X9
PASS
1761.27 C
H450X200X9
PASS
199.31 C
H450X200X9
PASS
199.31 C
H450X200X9
PASS
1604.74 T
H250X125X6
PASS
1.09 C
H450X200X9
PASS
882.74 C
H450X200X9
PASS
882.74 T

(JAPANESE SECTIONS)
AISC- H2-1
0.610
5779.12
-1420113.12
(JAPANESE SECTIONS)
AISC- H2-1
0.859
-81634.52
-1533265.38
(JAPANESE SECTIONS)
AISC- H1-3
0.870
-81634.52
-1535282.88
(JAPANESE SECTIONS)
AISC- H2-1
0.620
-75830.68
-989081.62
(JAPANESE SECTIONS)
AISC- H1-3
0.611
-5788.10
-1419628.38
(JAPANESE SECTIONS)
AISC- H1-3
0.860
81509.39
-1536259.38
(JAPANESE SECTIONS)
AISC- H1-3
0.621
75637.27
-992121.75
(JAPANESE SECTIONS)
AISC- H2-1
0.869
81509.39
-1535123.75
(JAPANESE SECTIONS)
AISC- H1-3
0.006
0.00
-2565.62
(JAPANESE SECTIONS)
AISC- H1-3
0.012
0.00
-9179.08
(JAPANESE SECTIONS)
AISC- H2-1
0.008
0.00
-3905.96

8
67.75
9
132.25
9
0.00
9
132.25
6
67.75
7
132.25
7
132.25
7
0.00
6
154.29
6
132.25
8
132.25

73. PARAMETER 2
74. CODE AISC
75. STEEL TAKE OFF LIST 4 6 9 12 24 TO 30

D:\Project Raxaya\Mitratel\2014\New Site\04. Sumbagut\PT. Tanato Prima Lestari\Penempakan Uken\Building Analysis\Baseframe


Page 3 of 6

Sunday, April 13, 2014, 06:58 PM


STAAD SPACE

-- PAGE NO.

STEEL TAKE-OFF
-------------PROFILE
ST
ST

LENGTH(CM

H450X200X9
H250X125X6

WEIGHT(KG

1329.00
264.50

993.484
76.600
---------------TOTAL =
1070.083

************ END OF DATA FROM INTERNAL STORAGE ************

76.
77.
78.
79.

PARAMETER 3
CODE AISC
RATIO 1.33 ALL
FINISH

*********** END OF THE STAAD.Pro RUN ***********


**** DATE= APR 13,2014

TIME= 18:55:38 ****

D:\Project Raxaya\Mitratel\2014\New Site\04. Sumbagut\PT. Tanato Prima Lestari\Penempakan Uken\Building Analysis\Baseframe


Page 4 of 6

Sunday, April 13, 2014, 06:58 PM


STAAD SPACE

-- PAGE NO.

************************************************************
*
For questions on STAAD.Pro, please contact
*
*
Research Engineers Offices at the following locations *
*
*
*
Telephone
Email
*
* USA:
+1 (714)974-2500
support@bentley.com
*
* CANADA
+1 (905)632-4771
detech@odandetech.com *
* UK
+44(1454)207-000
support@bentley.com
*
* NORWAY
+47 67 57 21 30
staad@edr.no
*
* SINGAPORE +65 6225-6158
support@bentley.com
*
* INDIA
+91(033)4006-2021
support@bentley.com
*
* JAPAN
+81(03)5952-6500
eng-eye@crc.co.jp
*
* CHINA
+86(411)8479-1166
support@bentley.com
*
* THAILAND +66(0)2645-1018/19
support@bentley.com
*
*
*
* North America
support@bentley.com
*
* Europe
support@bentley.com
*
* Asia
support@bentley.com
*
************************************************************

D:\Project Raxaya\Mitratel\2014\New Site\04. Sumbagut\PT. Tanato Prima Lestari\Penempakan Uken\Building Analysis\Baseframe


Page 5 of 6

Sunday, April 13, 2014, 06:58 PM


STAAD SPACE

-- PAGE NO.

D:\Project Raxaya\Mitratel\2014\New Site\04. Sumbagut\PT. Tanato Prima Lestari\Penempakan Uken\Building Analysis\Baseframe


Page 6 of 6

Potrebbero piacerti anche