VIVIENDA COSTO PROMEDIO
ITEM
PARTIDAS DE CONTROL
UND.
Metrado
P.U.
COSTO
PESO
EJECUTADO SEMANA
ANTERIOR
PROYECCION DE SEMANA
#REF!
Err:509
01.00 ESTRUCTURAS
01.01 EXCAVACION DE CIMIENTOS
m3
15.30
140.36
2,147.47
4.3619%
Err:509
m3
13.45
28.70
386.01
0.7840%
Err:509
Err:509
m3
3.26
682.45
2,224.80
4.5189%
Err:509
Err:509
m2
18.20
209.51
3,813.04
7.7449%
Err:509
Err:509
m3
2.80
718.51
2,011.83
4.0864%
Err:509
Err:509
kg
6,420.00
1.65
10,605.75
21.5421%
Err:509
Err:509
Err:509
Err:509
1.4006%
Err:509
Err:509
m2
45.00
15.32
689.55
m2
128.30
42.53
5,456.29
11.0827%
Err:509
Err:509
m2
23.00
86.35
1,985.98
4.0339%
Err:509
Err:509
Err:509
Err:509
m2
128.30
3.86
495.83
1.0071%
Err:509
Err:509
03.02 DRYWALL
m2
21.40
217.13
4,646.52
9.4379%
Err:509
Err:509
Und.
6.00
640.24
3,841.46
7.8027%
Err:509
Err:509
m2
45.00
103.49
4,657.05
9.4593%
Err:509
Err:509
pto.
16.00
62.87
1,005.88
2.0431%
Err:509
Err:509
pto.
18.00
224.12
4,034.13
8.1940%
Err:509
Err:509
m2
128.30
9.60
1,231.04
2.5005%
Err:509
Err:509
TOTAL
%
AREA / DEPARTAMENTO:
CANTIDAD PROGR
SEMANA ANTER.
SEM.ANTERIOR
RENDIMIENTO
Noviembre
D
L
22
23
24
25
DESCRIPCION DE LA ACTIVIDAD
#REF! CASITA
DE JULIO
01.00 ESTRUCTURAS
01.01 EXCAVACION DE CIMIENTOS
01.02 CONCRETO EN CIMIENTOS
01.03 CONCRETO EN SOBRECIMIENTO
01.04 ENCOFRADO DESENCOFRADO CIMIENTOS
01.05 CONRETO COLUMNAS Y ALVEOLOS
01.06 ACERO EN CIMIENTOS Y MURO
m3
m3
m3
m2
m3
kg
m2
m2
m2
7.00
4.00
m2
m2
Und.
m2
pto.
pto.
1.00
1.00
m2
1.00
Err:504
1.0
0.6
CASA/DIA
Err:504
CASA/DIA
ELABORADO POR:
NOMBRE:
CARGO:
FECHA:05/03/2011
FIRMA:
Err:504
0.1
CASA/DIA
0.1
CASA/DIA
0.1
CASA/DIA
% PROGRAMADO SE
ANTERIOR: (XX) AL (XX)
608.29%
Err:509
UBICACIN: XXXXXXXX - MIRAFLORES - LIMA
ANTERIOR
SEM.ACTUAL
viembre
Mr
Mc
26
27
28
29
31
SEM. PROYECTADA
Nov. - Diciembre
D
L
M
01
02
03
Diciembre
D
L
Mr
04
05
06
07
08
09
10
Mc
11
12
OBSERVACIONES
RESPONSABLE
1
-
1
-
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
GBENITEZ/EHERNA
GBENITEZ/EHERNA
GBENITEZ/EHERNA
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
GBENITEZ/EHERNA
GBENITEZ/EHERNA
GBENITEZ/EHERNA
GBENITEZ/EHERNA
GBENITEZ/EHERNA
GBENITEZ/EHERNA
GBENITEZ/EHERNA
FIRMA:
% PROGRAMADO SEM.
ANTERIOR: (XX) AL (XX) (MES)
608.29%
% EJECUTADO SEM. ANTERIOR:
(XX) AL (XX) (MES)
Err:509
RESPONSABLE
METRADOS
EJECUTADOS EN
SEMANA ANTERIOR
PORCENTAJE
EJECUTADO
#REF!
GBENITEZ/EHERNADEZ
GBENITEZ/EHERNADEZ
GBENITEZ/EHERNADEZ
GBENITEZ/EHERNADEZ
GBENITEZ/EHERNADEZ
GBENITEZ/EHERNADEZ
GBENITEZ/EHERNADEZ
GBENITEZ/EHERNADEZ
GBENITEZ/EHERNADEZ
GBENITEZ/EHERNADEZ
2
#REF!
-
OBSERVACIONES:
50.00%
-
REGISTRO
GESTION DE PROYECTOS
ANALISIS DE RESTRICCIONES
CODIGO DE PROYECTO: 110881
AREA / DEPARTAMENTO:
Item
Descripcin de la actividad
semana 01 AL 07 MAYO
MANZANA
DESCRIPCION DE LA RESTRICCION
VERIFICAR EL TIPO DE RESTRICCION DE ACUERDO A LEYENDA
R-1
01.00 ESTRUCTURAS
01.01 EXCAVACION DE CIMIENTOS
01.02 CONCRETO EN CIMIENTOS
01.03 CONCRETO EN SOBRECIMIENTO
01.04 MUROS
01.05 CONCRETO COLUMNAS Y ALVEOLOS
01.06 CONCRETO EN LOSA ALIGERADA
03.02 DRYWALL
INGRESO DE PERSONAL
1 MANZANA
INGRESO DE PERSONAL
A-1
01.00 ESTRUCTURAS
01.01 EXCAVACION DE CIMIENTOS
1 MANZANA
B-1
01.00 ESTRUCTURAS
01.01 EXCAVACION DE CIMIENTOS
01.02 CONCRETO EN CIMIENTOS
01.03 CONCRETO EN SOBRECIMIENTO
01.04 MUROS
01.05 CONRETO COLUMNAS Y ALVEOLOS
REGISTRO
GESTION DE PROYECTOS
ANALISIS DE RESTRICCIONES
CODIGO DE PROYECTO: 110881
AREA / DEPARTAMENTO:
Item
Descripcin de la actividad
semana 01 AL 07 MAYO
DESCRIPCION DE LA RESTRICCION
VERIFICAR EL TIPO DE RESTRICCION DE ACUERDO A LEYENDA
1 MANZANA
D-1
01.00 ESTRUCTURAS
01.01 EXCAVACION DE CIMIENTOS
01.02 CONCRETO EN CIMIENTOS
01.03 CONCRETO EN SOBRECIMIENTO
01.04 MUROS
01.05 CONRETO COLUMNAS Y ALVEOLOS
01.06 CONCRETO EN LOSA ALIGERADA
1 MANZANA
E-1
01.00 ESTRUCTURAS
01.01 EXCAVACION DE CIMIENTOS
MANZANA G- 1
01.00 ESTRUCTURAS
01.01 EXCAVACION DE CIMIENTOS
REGISTRO
GESTION DE PROYECTOS
ANALISIS DE RESTRICCIONES
CODIGO DE PROYECTO: 110881
AREA / DEPARTAMENTO:
Item
Descripcin de la actividad
semana 01 AL 07 MAYO
DESCRIPCION DE LA RESTRICCION
VERIFICAR EL TIPO DE RESTRICCION DE ACUERDO A LEYENDA
01.04 MUROS
01.05 CONRETO COLUMNAS Y ALVEOLOS
01.06 CONCRETO EN LOSA ALIGERADA
MANZANA H-1
01.00 ESTRUCTURAS
01.01 EXCAVACION DE CIMIENTOS
1 MANZANA
I-1
01.00 ESTRUCTURAS
01.01 EXCAVACION DE CIMIENTOS
1 MANZANA
J-1
REGISTRO
GESTION DE PROYECTOS
ANALISIS DE RESTRICCIONES
CODIGO DE PROYECTO: 110881
AREA / DEPARTAMENTO:
Item
Descripcin de la actividad
semana 01 AL 07 MAYO
DESCRIPCION DE LA RESTRICCION
VERIFICAR EL TIPO DE RESTRICCION DE ACUERDO A LEYENDA
01.00 ESTRUCTURAS
01.01 EXCAVACION DE CIMIENTOS
1 MANZANA
K-1
01.00 ESTRUCTURAS
01.01 EXCAVACION DE CIMIENTOS
MANZANA L-1
01.00 ESTRUCTURAS
01.01 EXCAVACION DE CIMIENTOS
01.02 CONCRETO EN CIMIENTOS
01.03 CONCRETO EN SOBRECIMIENTO
01.04 MUROS
01.05 CONRETO COLUMNAS Y ALVEOLOS
01.06 CONCRETO EN LOSA ALIGERADA
REGISTRO
GESTION DE PROYECTOS
ANALISIS DE RESTRICCIONES
CODIGO DE PROYECTO: 110881
AREA / DEPARTAMENTO:
Descripcin de la actividad
semana 01 AL 07 MAYO
Item
DESCRIPCION DE LA RESTRICCION
VERIFICAR EL TIPO DE RESTRICCION DE ACUERDO A LEYENDA
1 MANZANA
N-1
01.00 ESTRUCTURAS
01.01 EXCAVACION DE CIMIENTOS
01.02 CONCRETO EN CIMIENTOS
01.03 CONCRETO EN SOBRECIMIENTO
01.04 MUROS
01.05 CONRETO COLUMNAS Y ALVEOLOS
01.06
1 MANZANA
O-1
01.00 ESTRUCTURAS
01.01 EXCAVACION DE CIMIENTOS
01.02 CONCRETO EN CIMIENTOS
01.03 CONCRETO EN SOBRECIMIENTO
01.04 MUROS
01.05 CONRETO COLUMNAS Y ALVEOLOS
01.06 CONCRETO EN LOSA ALIGERADA
1 MANZANA
P-1
01.00 ESTRUCTURAS
REGISTRO
GESTION DE PROYECTOS
ANALISIS DE RESTRICCIONES
CODIGO DE PROYECTO: 110881
AREA / DEPARTAMENTO:
Item
Descripcin de la actividad
semana 01 AL 07 MAYO
DESCRIPCION DE LA RESTRICCION
VERIFICAR EL TIPO DE RESTRICCION DE ACUERDO A LEYENDA
4/15/2011
ELABORADO POR:
NOMBRE:
CARGO:
FECHA:26/02/2011
FIRMA:
APROBADO POR:
NOMBRE:
CARGO:
FECHA: 17/04/2011
LEYENDA CUMPLIMIENTO:
CONTRATISTA:
PROG-CONT
CLIENTE:
PROGRAMACION CONTRATISTA
0.00
ING-CLN
INGENIERA CLIENTE
18.00
OTR-CLN
LOG-CONT
EM-CONT
0.00
MO-CONT
1.00
ACT-CONT
8.00
OTR-CONT
0.00
27.00
REGISTRO
GESTION DE PROYECTOS
REVISION:
FECHA: 30-4-11
PAGINA:
NALISIS DE RESTRICCIONES
N DE REGISTRO:
RESTRICCION
HINALCO S.A.
TIPO DE RESTRICCION
FECHA DE
LEVANTAMIENTO
RESPONSABLE
LOG-CONT
4/30/2011
DRODRIGUEZ
ACT-CONT
3/20/2011
W.ROON
LOG-CONT
4/11/2011
DRODRIGUEZ
LOG-CONT
4/17/2011
VHUAMAN
LOG-CONT
4/4/2011
VHUAMAN
LOG-CONT
4/4/2011
DRODRIGUEZ
ACT-CONT
4/4/2011
GBENITEZ/EHERNANDEZ
ING-CLN
4/30/2011
MLAVA
ING-CLN
5/4/2011
MLAVA
LOG-CONT
4/6/2011
DRODRIGUEZ
LOG-CONT
4/6/2011
KCALDERON
LOG-CONT
4/6/2011
KCALDERON
ACT-CONT
4/6/2011
GBENITEZ/EHERNANDEZ
LOG-CONT
4/11/2011
DRODRIGUEZ/KCALDERON
LOG-CONT
4/11/2011
DRODRIGUEZ/KCALDERON
LOG-CONT
4/11/2011
DRODRIGUEZ
1
1
1
1
1
1
1
1
1
1
1
1
1
0
MURO DE CONTENCION
ING-CLN
3/23/2011
MLAVA
ON DE AGUA EN TERRENO
D.RODRIGUEZ
0
1
0
DE ACUERDO A LEYENDA
AO - OTROS
IQUE DE DRYWALL
OVEEDOR
S SANITARIOS
OTR-CLN
5/5/2011
ADICIONAL PRESENTADO
OTR-CLN
4/18/2011
AMAGUINA
MAS OPERARIOS)
MO-CONT
5/10/2011
DLONDOO
ING-CLN
4/18/2011
AMAGUINA
MURO DE CONTENCION
ING-CLN
4/18/2011
MLAVA/AJURADO
REGISTRO
GESTION DE PROYECTOS
REVISION:
FECHA: 30-4-11
PAGINA:
NALISIS DE RESTRICCIONES
N DE REGISTRO:
RESTRICCION
TIPO DE RESTRICCION
FECHA DE
LEVANTAMIENTO
RESPONSABLE
OTR-CLN
4/18/2011
MLAVA/AMAGUINA
MO-CONT
5/10/2011
DLONDOO
ING-CLN
4/30/2011
MLAVA
ING-CLN
5/4/2011
MLAVA
1
1
MO-CONT
5/10/2011
DLONDOO
ING-CLN
4/30/2011
MLAVA
ING-CLN
4/30/2011
MLAVA
1
1
ING-CLN
4/18/2011
MLAVA/AMAGUINA
EM-CONT
4/30/2011
JALDANA
DE ACUERDO A LEYENDA
ADICIONAL PRESENTADO
MAS OPERARIOS)
MAS OPERARIOS)
CUMPLIMI
ENTO
HINALCO S.A.
1
0
REGISTRO
GESTION DE PROYECTOS
REVISION:
FECHA: 30-4-11
PAGINA:
NALISIS DE RESTRICCIONES
N DE REGISTRO:
RESTRICCION
TIPO DE RESTRICCION
FECHA DE
LEVANTAMIENTO
RESPONSABLE
ING-CLN
5/5/2011
AMAGUIA
MO-CONT
5/10/2011
DLONDOO
0
0
LOG-CONT
4/11/2011
MFLORES/KCALDERON
EM-CONT
4/30/2011
JALDANA
MO-CONT
5/10/2011
DLONDOO
EM-CONT
4/25/2011
JALDANA
LOG-CONT
5/5/2011
DRODRIGUEZ
DE ACUERDO A LEYENDA
AJA)
MAS OPERARIOS)
MAS OPERARIOS)
, YA PEDIDOS
CUMPLIMI
ENTO
HINALCO S.A.
REGISTRO
GESTION DE PROYECTOS
REVISION:
FECHA: 30-4-11
PAGINA:
NALISIS DE RESTRICCIONES
N DE REGISTRO:
RESTRICCION
TIPO DE RESTRICCION
FECHA DE
LEVANTAMIENTO
ING-CLN
4/30/2011
OTR-CLN
DE ACUERDO A LEYENDA
DE TRANSLEI, DREN 2
R CESEL
MAS OPERARIOS)
RESPONSABLE
CUMPLIMI
ENTO
HINALCO S.A.
4/30/2011
MLAVA/AMAGUINA
MLAVA/AMAGUINA
0
0
ING-CLN
4/18/2011
MLAVA/AMAGUINA
ACT-CONT
4/25/2011
WROON
LOG-CONT
4/30/2011
D. RODRIGUEZ
LOG-CONT
4/30/2011
D. RODRIGUEZ
LOG-CONT
3/20/2011
MFLORES
1
0
0
0
MO-CONT
5/10/2011
DLONDOO
REGISTRO
GESTION DE PROYECTOS
REVISION:
FECHA: 30-4-11
PAGINA:
NALISIS DE RESTRICCIONES
N DE REGISTRO:
RESTRICCION
HINALCO S.A.
TIPO DE RESTRICCION
FECHA DE
LEVANTAMIENTO
RESPONSABLE
ING-CLN
4/11/2011
MLAVA
OTR-CLN
4/15/2011
MLAVA/AMAGUINA
LOG-CONT
3/20/2011
MFLORES/KCALDERON
DE ACUERDO A LEYENDA
PO B CON OCHAVO
R CESEL
AO - OTROS
R CESEL
AO - OTROS
ACT-CONT
4/25/2011
WROON
LOG-CONT
4/30/2011
D. RODRIGUEZ
LOG-CONT
4/30/2011
D. RODRIGUEZ
LOG-CONT
4/24/2011
MFLORES
1
1
1
0
0
0
LOG-CONT
4/6/2011
DRODRIGUEZ
ING-CLN
3/20/2011
MLAVA/AMAGUINA
LOG-CONT
3/20/2011
MFLORES/KCALDERON
ACT-CONT
4/25/2011
WROON
LOG-CONT
4/30/2011
D. RODRIGUEZ
LOG-CONT
4/30/2011
D. RODRIGUEZ
ING-CLN
4/25/2011
MLAVA
LOG-CONT
3/20/2011
KCALDERON
1
1
1
0
0
1
1
ACT-CONT
4/18/2011
GBENITEZ/EHERNANDEZ
REGISTRO
GESTION DE PROYECTOS
REVISION:
FECHA: 30-4-11
PAGINA:
NALISIS DE RESTRICCIONES
N DE REGISTRO:
RESTRICCION
TIPO DE RESTRICCION
FECHA DE
LEVANTAMIENTO
RESPONSABLE
ING-CLN
3/20/2011
MLAVA/AMAGUINA
LOG-CONT
3/20/2011
MFLORES/KCALDERON
ACT-CONT
4/25/2011
WROON
LOG-CONT
4/30/2011
D. RODRIGUEZ
LOG-CONT
4/25/2011
MFLORES
LOG-CONT
4/25/2011
MFLORES/KCALDERON
ING-CLN
4/25/2011
MLAVA
LOG-CONT
3/20/2011
KCALDERON
DE ACUERDO A LEYENDA
R CESEL
AO - OTROS
INGENIERA CLIENTE
OTRAS CAUSAS CLIENTE
15.00
3.00
18.00
CUMPLIMI
ENTO
HINALCO S.A.
1
1
1
0
1
1
1
1
ESTADISTICAS DE CAUSAS DE I
CAUSA DE INCUMPLIMIENTO
ING-CLN
OTR-CLN
0.00%
0.00
40.00%
18.00
0.00%
0.00
2.22%
1.00
17.78%
8.00
0.00%
0.00
33.33%
15.00
6.67%
3.00
100.00%
45.00
CAUSAS DE INCUMPLIMIENTO
PROG-CONT
OTR-CLN; 7%
LOG-CONT
EM-CONT
LOG-CONT; 40%
ING-CLN; 33%
MO-CONT
ACT-CONT
OTR-CONT
ING-CLN
MO-CONT; 2%
ACT-CONT; 18%
OTR-CLN
CAUSAS DE INCUMPLIMIENTO
ESTADISTICAS DE CAUSAS DE I
PROG-CONT
AREA / DEPARTAMENTO:
OFICINA
TECNICA / OFICNA DE
LOG-CONT
CAMPO - PRODUCCION
EM-CONT
ING-CLN; 33%
CAUSA DE INCUMPLIMIENTO
MO-CONT
ACT-CONT
OTR-CLN
ACT-CONT; 18%
ELABORADO POR:
NOMBRE:
CARGO:
FECHA:30/04/2011
FIRMA:
APROBADO POR:
NOMBRE:
CARGO:
FECHA: 24/04/2011
45.00
FIRMA:
PORCENTAJE DE CUMPLIMIENTO
PROYECTO:
CODIGO DE PROYECTO:
AREA / DEPARTAMENTO:
CONTRATISTA:
MES
SEMANA
SEM 01
SEM 02
Jan-11
SEM 03
SEM 04
SEM 05
SEM 06
Feb-11 SEM 07
SEM 08
SEM 09
SEM 10
SEM 11
Mar-11
SEM 12
SEM 13
SEM 14
SEM 15
Apr-11 SEM 16 (Avance Acum Ant.
Total - Solo viviendas)
SEM 17
SEM 18
ELABORADO POR:
PLANEAMIENTO
SUPERVISOR: CES
% PROGRAMADO
SEMANAL ACUMULADO
-
UBICACIN:
% EJECUTADO
SEMANAL
ACUMULADO
-
3/13/2011
3/20/2011
3/27/2011
4/3/2011
4/10/2011
4/17/2011
4/24/2011
5/1/2011
FIRMA:
1.36%
53.57%
54.93%
-
26.85%
1.50%
APROBADO POR:
PORCENTAJE DE CUMPLIMIENTO
PROYECTO:
CODIGO DE PROYECTO:
AREA / DEPARTAMENTO:
CONTRATISTA:
MES
NOMBRE:
CARGO:
FECHA:
SEMANA
PLANEAMIENTO
SUPERVISOR: CES
% PROGRAMADO
SEMANAL ACUMULADO
% EJECUTADO
SEMANAL
ACUMULADO
NOMBRE:
CARGO:
FECHA:
UBICACIN:
LIMIENTO
SUPERVISOR: CESEL
UBICACIN:
% CUMPLIMIENTO
SEMANAL
ACUMULADO
- 10 AL 16 ABRIL
110.29%
FIRMA:
50.12% 17 AL 24 ABRIL
- 24 AL 30 ABRIL
-
LIMIENTO
SUPERVISOR: CESEL
UBICACIN:
% CUMPLIMIENTO
SEMANAL
ACUMULADO
25 de26
2.0
DESCRIPCION
1.00
1.01
1.02
1.03
1.04
OBRAS PROVISIONALES
Movilizacin y Desmovilizacin de Equipos
Almacenes, talleres y Obras Provisionales
Mantenimiento de Accesos y Seguridad en Obra (Segn plazo de obra)
Campamento de Staff (incluye alojamiento y alimentacin)
2.00
2.01
3.00
3.01
3.01.01
3.02
3.02.01
4.00
4.01
5.00
6.00
7.00
UTILIDADES
9.00
26 de26
A
Unidad
Gbl
Gbl
Gbl
Gbl
Cantidad
P.U Total
1.00
1.00
1.00
1.00
155,520.00
1,674,713.98
516,860.00
551,838.00
und
253.00
46,032.68
und
42.00
46,596.39
und
2.00
47,760.13
und
95.00
56,541.22
Parcial S/.
2,898,931.98
155,520.00
1,674,713.98
516,860.00
551,838.00
11,646,268.04
11,646,268.04
2,052,568.64
1,957,048.38
1,957,048.38
95,520.26
95,520.26
5,371,415.90
5,371,415.90
21,969,184.56
-
S/. 21,969,184.56