TCR SAMPLE ANALYSIS

All Rights Reserved Alcatel-Lucent 2006, #####

TCR ANALYSIS

Weekly Progress Report #1

TCR Formulae :
100-ZTR304A: CELL_RATE_TCH_CALL_DROP_EXCLUDE_HO
ZTR304A = CM33/(K3013A+CH323+CH343-CH313-CH333)
Nom: CM33 Breakup

2 | Base Line Drive Report | Nov08-Dec08

All Rights Reserved Alcatel-Lucent 2008

Weekly
Progress Report
Sample
Mumbai
BSC #1
1 Call drop distribution

Report Extraction: M2000 - BSC6000- Call Measurement - Call Drop


Measurement per cell

Further Distribution for CDR in


stable state(ERROR INDICATION)

Further Distribution for CDR in


stable state(CONNECTION FAILURE)

Further Distribution for CDR in


stable state(RELEASE INDICATION)

All Rights Reserved Alcatel-Lucent 2008

Check List

Weekly Progress Report #1

CM330_Call Drops on Radio Interface in Stable State:


Calls released because of the ERR IND, CONN FAIL IND, and REL IND
messages received by the BSC after the MS seizes a traffic channel.

Probable reasons: 1. Hardware Issue


2. E1 Fluctuation
3. RF Environment Issue ( Coverage, Quality, High TA)
CM331_Call Drops on Radio Interface in Handover State:

This counter is pegged when a drop is pegged during handover


process.
Probable reasons: 1. In-correct Neighbor definitions including parameter
2. Hardware , RF Environment & fluctuation during
HO state.

4 | Base Line Drive Report | Nov08-Dec08

All Rights Reserved Alcatel-Lucent 2008

TRX LEVEL ANALYSIS


Weekly Progress Report #1

1. Radio Link Failure Measurement based on TA per TRX report:


TRX level reports like Radio Link Failure reports can be used to analyze the
CDR in the network.
These report can be used to analyze Radio link failures occurring due to High
TA. Sample report attached.
Report Extraction : M2000 BSC6000 - MR Measurement -- Radio Link
Failure Measurement based on TA per TRX.

2. Radio Link Failure Measurement per TRX report:


This report provides mean downlink level & quality , uplink level & quality &
TA value reported during radio link failure on full-rate TCH & half-rate
TCH.
Report Extraction: M2000 BSC6000 - MR Measurement -- Radio Link
Failure Measurement per TRX.

5 | Base Line Drive Report | Nov08-Dec08

All Rights Reserved Alcatel-Lucent 2008

Weekly Progress Report #1

THANK YOU

All Rights Reserved Alcatel-Lucent 2008