Sei sulla pagina 1di 1

CONSTRUCTORAL SAN PASCUAL SAC

PRESUPUESTO
PPTO

0301007
Costo al

Cliente

Item

8/26/2008

Descripcin

Und.

Metrado

Precio S/.

1.00

120.00

Parcial S/.

OBRAS PRELIMINARES

01

470.30

01.01

MOVILIZACION DE EQUIPO

est

120.00

01.02

LIMPIEZA DE TERRENO MANUAL

m2

9.12

2.50

22.80

01.03

TRAZO NIVELES Y REPLANTEO

m2

12.38

15.90

196.84

01.04

DEMOLICION

m3

3.66

35.70

130.66

60.95

307.19
209.25

MOVIMIENTO DE TIERRAS

02

3,115.74

02.01

EXCAVACION PARA CIMIENTOS HASTA 1.30 m, EN TERRENO NORMAL

m3

5.04

02.02

EXCAVACION PARA ZAPATAS HASTA 2.50M EN TERRENO NORMAL

m3

3.75

55.80

02.08

NIVELACION INTERIOR APISONADO MANUAL

m2

1.00

280.00

280.00

02.09

BASE COMPACTACION MANUAL PARA ACERAS DE 0.10 m

m2

9.12

180.00

1,641.60

02.10

RELLENO COMPACTADO

1.50

95.00

142.50

02.11

ELIMINACION CON TRANSPORTE (CARGUIO A MANO) R=25 m3/da

m3

4.46

120.00

535.20

CONCRETO SIMPLE

03

1,628.28

03.01

CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON 30% PIEDRA

m3

5.41

48.50

262.39

03.03

ENCOFRADO Y DESENCOFRADO NORMAL PARA SOBRECIMIENTO HASTA 0.40 m

m2

19.94

68.50

1,365.89

04

CONCRETO ARMADO

04.03

ZAPATAS

04.03.01

CONCRETO PARA ZAPATAS f'c=210 kg/cm2

5,686.74
18.75
m3

0.75

25.00

ESCALERAS

04.06
04.06.01

CONCRETO EN ESCALERAS f'c=210 kg/cm2

m3

1.60

680.00

04.06.03

ENCOFRADO Y DESENCOFRADO NORMAL EN ESCALERAS

m2

5.82

80.90

COLUMNETAS DE AMARRE

04.09

18.75
1,558.84
1,088.00
470.84
4,109.15

04.09.01

CONCRETO PARA COLUMNETAS f'c=210 kg/cm2

m3

0.38

690.00

262.20

04.09.02

ACERO ESTRUCTURAL PARA COLUMNAS

kg

100.00

30.50

3,050.00

04.09.03

ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNETAS

m2

9.90

80.50

796.95

m2

47.55

150.00

7,132.50

ALBAILERIA

05
05.01

MUROS DE LADRILLO KK CARAVISTA DE ARCILLA DE SOGA CON MEZCLA 1:4 X 1.5cm

7,132.50

REVOQUES Y ENLUCIDOS

06

1,793.90

06.02

TARRAJEO INTERIOR CON MORTERO 1:5 X1.5 cm (INCLUYE COLUMNAS EMPOTRADAS)

m2

1.40

80.00

112.00

06.04

VESTIDURA DE DERRAMES EN PUERTAS, VENTANAS Y VANOS

27.80

60.50

1,681.90

9.13

25.50

232.82

m2

4.56

160.00

729.60

m2

19.00

35.00

665.00

m2

12.36

60.00

741.60

m2

17.77

120.00

2,132.40

CIELORRASOS Y VIGAS

07
07.02

VESTIDURA DE VIGAS

232.82

PISOS Y PAVIMENTOS

08
08.03

VEREDA RIGIDA DE CONCRETO f'c=140 kg/cm2 E=10 cm PASTA 1:2

08.05

PISO DE PORCELLANATO BRILLANTE DE 40 X 40 TRANSITO MODERADO

1,394.60

ZOCALOS

10
10.01

ZOCALO DE CEMENTO PULIDO

10.02

ZOCALO DE PORCELLANATO 10 cm

2,874.00

REVESTIMIENTOS

11

1,648.25

11.01

FORJADO Y REVESTIMIENTO DE GRADAS Y ESCALERAS DE CEMENTO PULIDO

2.15

55.00

118.25

11.02

ENCHAPE DE LAJA DE PIEDRA AREQUIPEA

m2

8.50

180.00

1,530.00

m2

2.20

350.00

770.00

m2

2.52

550.00

1,386.00

pza

3.00

25.50

76.50

pza

1.00

250.00

250.00

p2

0.00

0.00

0.00

p2

0.00

0.00

0.00

CARPINTERIA DE MADERA

13
13.01

PUERTA CONTRAPLACADA 0.80 x 2.75 CON TRIPLAY 4 mm INCLUYE MARCO CEDRO 2"X3"
CARPINTERIA METALICA

14
14.01

770.00

PUERTA METALICA LAC 1/16" CON MARCO 2"X2"X1/4" Y REFUERZOS

1,386.00

CERRAJERIA

15
15.01

BISAGRA CAPUCHINA DE 3 1/2" X 3 1/2"

15.02

CERRADURA PARA PUERTA PRINCIPAL PESADA

326.50

VIDRIOS, CRISTALES Y SIMILARES

16
16.01

VIDRIOS TEMPLADOS EN MAMPARAS

16.02

VIDRIOS SEMIDOBLES INCOLORO CRUDO

0.00

PINTURA

17

3,742.20

17.01

PINTURA AL TEMPLE 2 MANOS EN CIELOS RASOS Y VIGAS

m2

29.50

48.00

1,416.00

17.02

PINTURA VINILICA EN MUROS INTERIORES 2 MANOS

m2

38.77

60.00

2,326.20

17.03

PINTURA VINILICA EN MUROS EXTERIORES 2 MANOS

m2

50.52

45.00

2,273.40

17.04

PINTURA EN PUERTAS CON BARNIZ 2 MANOS

m2

3.76

60.00

225.60

INSTALACIONES ELECTRICAS

19

2,900.93

19.01

SALIDA DE TECHO CON CABLE AWG TW 2.5 mm (14) + D PVC SEL 16 mm (5/8)

pto

1.00

250.50

250.50

19.02

SALIDA DE PARED CON CABLE AWG TW 4.0 mm (12) + D PVC SEL 19 mm (3/4)

pto

4.00

248.00

992.00

19.03

SALIDA PARA TOMACORRIENTE BIPOLAR DOBLE

pto

3.00

180.00

540.00

19.10

TUBERIAS PVC SAP (ELECTRICAS) D=3/4"

24.39

25.00

609.75

19.18

RED DE DISTRIBUCION TUBERIA DE 1" PVC-SAP

12.56

40.50

508.68

TOTAL COSTOS DIRECTO


MAS 20% DE GASTOS GENERALES
TOTAL GENENRAL

35,102.75
7,020.55
42,123.30