Sei sulla pagina 1di 1

EMPLOYER

ENGINEER

CONTRACTOR

MINISTRY OF TRANSPORT & COMMUNICATIONS


DIRECTORATE GENERAL OF ROADS & LAND
TRANSPORT
P.O.BOX27, P.C.114
SULTANATE OF OMAN

COWI & PARTNERS LLC


P.O.BOX2115, P.C.112
SULTANATE OF OMAN

KHALID BIN AHMED & SONS LLC CORSAN


CORVIAM JV
AL AZAIBA
P.O. BOX723, P.C.130
SULTANATE OF OMAN

Rev.:

ITEM

DESCRIPTION

1
2
3
4
5

Copy of Relevant Contract Specification


Stamped Compliance Statement (clause by clause)
Technical literature / Catalogue (highlighting selected models)
Test Certificates
Sketches/drawing reference indicating area where it is used
Copies of approvals/comments on related submittals (eg. colour
scheme)
Manufacturers dimensional drawings
Proof of Certification/Listings, as specified (eg.UL, FM etc.)
Sample/Colour Chart
Sequence of Operation
System Architecture
System Functional Description
Design Calculations, as specified
Manufacturer Endorsement of the Technical Solution
Written confirmation from manufacturer for spare parts
availability for specified number of years
Written confirmation of manufacturers for deputing their
technical personnel on site for commissioning of the system, as
specified
Preliminary Interface Control Documents with other systems
and packages as specified
Other documents, if any as per relevant specifications

6
7
8
9
10
11
12
13
14
15
16
17
18
19
20

Prepared by:
Signature:
Date:
Submitted by Project Director:
Signature:
Date:

Form No.: KAS-CC JV/BS2P2/OP/QA02.11 Rev.0

Attached

MATERIAL COMPLIANCE STATEMENT


Submittal No.:

SubmittedTo be

BS2P2 - DUALIZATION OF BIBBID-SUR ROAD, SECTION 2, PART 2


ApplicableNot

CONTRACT NO.: 95/2012

Reviewed for Submission by QA/QC Manager:


Signature:
Date:

PAGE 1 OF 1