Sei sulla pagina 1di 6

Scheduling/Leveling Report - 29-Oct-14 - PM.

exe
===============================================
Default Project..................................................PROJECT
Projects:
PROJECT.....................................................
Scheduling/Leveling Settings:
----------------------------General
------Scheduling ......................................................Yes
Leveling ........................................................No
Ignore relationships to and from other projects .................No
Make open-ended activities critical .............................Yes
Use Expected Finish Dates .......................................Yes
Schedule automatically when a change affects dates ..............No
Level resources during scheduling ...............................No
Recalculate assignment costs after scheduling ...................No
When scheduling progressed activities use .......................Retaine
d Logic
Calculate start-to-start lag from ...............................Early S
tart
Define critical activities as ...................................Longest
Path
Compute Total Float As ..........................................Finish
Float
Calendar for scheduling Relationship Lag ........................Predece
ssor Activity Calendar
Advanced
-------Calculate multiple float paths...................................Yes
Calculate multiple float paths using.............................Total F
loat
Number of paths to calculate.....................................10
Statistics:
----------# Projects.......................................................1
# Activities.....................................................149
# Not Started....................................................149
# In Progress....................................................0
# Completed......................................................0
# Relationships..................................................206
# Activities with Constraint.....................................11
Project:
PROJECT Activity:
1234PMS110
CONTRACT
COMPLETION DATE
Project:
PROJECT Activity:
1234PMS120
PLACEMEN
T OF ORDERS
Project:
PROJECT Activity:
1234PMS130
SITE MOB
ILIZATION
Project:
PROJECT Activity:
1234PMS140
SUBMISSI
ON & APPROVAL OF DRAWINGS AND PROCEDURES
Project:
PROJECT Activity:
1234PMS150
COMPLETI
ON OF CIVIL WORKS
Project:
PROJECT Activity:
1234PMS160
RECEIPT
OF MATERIALS AT FACTORY
Project:
PROJECT Activity:
1234PMS170
COMPLETI

ON OF FABRICATION WORKS
Project:
ON OF BLASTING & PAINTING
Project:
OF MATERIALS AT SITE
Project:
ON OF MECHANICAL WORKS
Project:
ONING

PROJECT Activity:

1234PMS180

COMPLETI

PROJECT Activity:

1234PMS190

RECEIPT

PROJECT Activity:

1234PMS200

COMPLETI

PROJECT Activity:

1234PMS210

COMMISSI

Errors:
------Warnings:
--------Activities without predecessors..................................1
Project:
PROJECT Activity:
1234PMS100
CONTRACT
COMMENCEMENT DATE
Activities without successors....................................12
Project:
PROJECT Activity:
1234HDG010
FINAL HA
NDING OVER TO M/S. CAIRN
Project:
PROJECT Activity:
1234PMS110
CONTRACT
COMPLETION DATE
Project:
PROJECT Activity:
1234PMS120
PLACEMEN
T OF ORDERS
Project:
PROJECT Activity:
1234PMS130
SITE MOB
ILIZATION
Project:
PROJECT Activity:
1234PMS140
SUBMISSI
ON & APPROVAL OF DRAWINGS AND PROCEDURES
Project:
PROJECT Activity:
1234PMS150
COMPLETI
ON OF CIVIL WORKS
Project:
PROJECT Activity:
1234PMS160
RECEIPT
OF MATERIALS AT FACTORY
Project:
PROJECT Activity:
1234PMS170
COMPLETI
ON OF FABRICATION WORKS
Project:
PROJECT Activity:
1234PMS180
COMPLETI
ON OF BLASTING & PAINTING
Project:
PROJECT Activity:
1234PMS190
RECEIPT
OF MATERIALS AT SITE
Project:
PROJECT Activity:
1234PMS200
COMPLETI
ON OF MECHANICAL WORKS
Project:
PROJECT Activity:
1234PMS210
COMMISSI
ONING
Out-of-sequence activities.......................................0
Activities with Actual Dates > Data Date.........................0
Milestone Activities with invalid relationships..................0
Exceptions:
----------Critical Activities..............................................1
Project:
PROJECT Activity:
1234PMS110
CONTRACT
COMPLETION DATE
Activities with unsatisfied constraints..........................1
Project:
PROJECT Activity:
1234PMS110
CONTRACT
COMPLETION DATE

Activities with unsatisfied relationships........................0


Activities with external dates...................................0
Activities that are not on any float paths.......................105
Project:
PROJECT Activity:
1234CC0010
SURVEYIN
G & TRANSFERRING OF BENCH MARK
Project:
PROJECT Activity:
1234CC0020
SOIL INV
ESTIGATION WORKS FOR SOIL RESISTIVITY TEST
Project:
PROJECT Activity:
1234CC0030
INITIAL
TEST PILE
Project:
PROJECT Activity:
1234CC0040
MARKING
OF TANK CENTER AS PER IFC DRAWINGS BY CIL
Project:
PROJECT Activity:
1234CC0050
DEMOLITI
ON OF EXISTING DYKE (PARTIAL)
Project:
PROJECT Activity:
1234CC0060
DEMOLITI
ON AND REMOVAL OF CONCRETE SLAB (INSIDE DYKE WALL)
Project:
PROJECT Activity:
1234CC0070
REINFORC
EMENT BINDING WORKS FOR TANKS & PIPE RACKS
Project:
PROJECT Activity:
1234CC0080
PILE BOR
ING WORKS FOR TANK
Project:
PROJECT Activity:
1234CC0090
POURING
OF CONCRETE (TANK PILES)
Project:
PROJECT Activity:
1234CC0100
PILE TES
TING
Project:
PROJECT Activity:
1234CC0110
CUT OFF
AND GROWING OF PILES
Project:
PROJECT Activity:
1234CC0120
BACKFILL
ING AND COMPACTION AROUND THE PILES
Project:
PROJECT Activity:
1234CC0130
PREPARAT
ION OF PILE CAP SHUTTERING, REINF AND CONCRETING
Project:
PROJECT Activity:
1234CC0140
BACKFILL
ING & COMPACTION
Project:
PROJECT Activity:
1234CC0150
INSTALLA
TION OF HDPE LINER
Project:
PROJECT Activity:
1234CC0160
BACKFILL
ING AND COMPACTION
Project:
PROJECT Activity:
1234CC0170
BACKFILL
ING AND TOPPING WITH BITUMEN TACK SAND
Project:
PROJECT Activity:
1234CC0180
TANK REL
EASE FOR MECHANICAL WORKS
Project:
PROJECT Activity:
1234CC9110
PILE BOR
ING WORKS FOR PIPE RACK
Project:
PROJECT Activity:
1234CC9120
POURING
OF CONCRETE (PR PILES)
Project:
PROJECT Activity:
1234CC9130
FOUNDATI
ON HANDING OVER FOR MECHANICAL WORKS
Project:
PROJECT Activity:
1234CC9140
INSTALLA
TION OF PEDESTALS, SLEEPERS, ETC
Project:
PROJECT Activity:
1234CC9150
BACKFILL
ING AND COMPACTION OF TANK AREA
Project:
PROJECT Activity:
1234CC9160
CONCRETI
NG WITHIN THE DYKE AREA
Project:
PROJECT Activity:
1234CC9170
DYKE WAL
L RECTIFICATION (LOCALISED AREA)
Project:
PROJECT Activity:
1234CCC010
INSTALLA
TION OF ANODES
Project:
PROJECT Activity:
1234CCC020
PRE-COMM
ISSIONING OF CP SYSTEM

Project:
PROJECT Activity:
OF MATERIALS AT SITE
Project:
PROJECT Activity:
TION OF CP SYSTEM (UNDERSIDE OF BOTTOM)
Project:
PROJECT Activity:
ION OF DETAIL DRAWINGS
Project:
PROJECT Activity:
ON OF MR & MTO FOR APPROVAL
Project:
PROJECT Activity:
OF PIPING ON PIPE RACK
Project:
PROJECT Activity:
WELDING OF PIPING WORKS
Project:
PROJECT Activity:
TING OF PIPING SYSTEM
Project:
PROJECT Activity:
& PAINTING OF PIPING
Project:
PROJECT Activity:
ON OF PIPING WORKS
Project:
PROJECT Activity:
HOOK UP WITH EXISTING FACILITIES
Project:
PROJECT Activity:
& ALIGNMENT OF PIPE RACK STRUCTURE
Project:
PROJECT Activity:
& ALIGNMENT OF OTHER STRUCTURES
Project:
PROJECT Activity:
OF STRUCTURES
Project:
PROJECT Activity:
PAINTING OF PR & ALLIED STRUCTURES
Project:
PROJECT Activity:
TION OF TANK JACKING SYSTEM
Project:
PROJECT Activity:
ZLES & MANWAYS FITUP, WELDING & INSPECTION
Project:
PROJECT Activity:
OF TANK JACKING SYSTEM
Project:
PROJECT Activity:
ASSEMBLY ERECTION & ALIGNMENT
Project:
PROJECT Activity:
ZZLES & MANHOLES FITUP, WELDING & INSPECTION
Project:
PROJECT Activity:
HAIR FITUP & WELDING
Project:
PROJECT Activity:
ROTESTING
Project:
PROJECT Activity:
OF SLUDGE IF ANY AND CLEANING
Project:
PROJECT Activity:
SCAFFOLDING FOR PAINTING WORKS
Project:
PROJECT Activity:
ION OF PAINT (INTERNAL)
Project:
PROJECT Activity:
ING OF SCAFFOLDING (EXTERNAL)
Project:
PROJECT Activity:
ING OF SCAFFOLDING (INTERNAL)
Project:
PROJECT Activity:
CLEANING & SUMP NOZZLE INSTALLATION
Project:
PROJECT Activity:
XUP OF TANK
Project:
PROJECT Activity:
ION OF PIPE SPOOLS FOR PIPING WORKS
Project:
PROJECT Activity:
ION OF PIPE SPOOLS FOR FIRE FIGHTING WORKS

1234CCP010

RECEIPT

1234CCP020

INSTALLA

1234CEN110

PREPARAT

1234CEN120

SUBMISSI

1234CEP010

ERECTION

1234CEP020

FITUP &

1234CEP025

HYDROTES

1234CEP030

TOUCH UP

1234CEP040

INSULATI

1234CEP050

TIE IN/

1234CES010

ERECTION

1234CES020

ERECTION

1234CES030

GROUTING

1234CES040

TOUCH UP

1234CET075

INSTALLA

1234CET110

ROOF NOZ

1234CET135

REMOVAL

1234CET150

STAIRWAY

1234CET160

SHELL NO

1234CET200

ANCHOR C

1234CET220

TANK HYD

1234CET230

REMOVAL

1234CET250

INTERNAL

1234CET270

APPLICAT

1234CET280

DISMANTL

1234CET290

DISMANTL

1234CET300

INTERNAL

1234CET310

FINAL BO

1234CFF010

FABRICAT

1234CFF020

FABRICAT

Project:
PROJECT Activity:
ION OF PIPE SUPPORTS FOR PIPING WORKS
Project:
PROJECT Activity:
& PRIMING OF PIPING SPOOLS & PIPE SUPPORTS
Project:
PROJECT Activity:
OF MATERIALS TO SITE
Project:
PROJECT Activity:
ION OF PIPE RACK STRUCTURE
Project:
PROJECT Activity:
ION OF MISC SUPPORT STRUCTURES
Project:
PROJECT Activity:
& PAINTING OF PR AND ALLIED SUPPORT STRUCTURES
Project:
PROJECT Activity:
OF MATERIALS TO SITE
Project:
PROJECT Activity:
ION OF ANNULAR PLATES & U/S PAINTING
Project:
PROJECT Activity:
ION AND ROLLING OF SHELL PLATES
Project:
PROJECT Activity:
ION OF ROOF STRUCTURE & GUSSETS
Project:
PROJECT Activity:
ION OF ROOF PLATES
Project:
PROJECT Activity:
ION OF ROOF NOZZLES AND MANWAYS
Project:
PROJECT Activity:
ION OF WIND GIRDER
Project:
PROJECT Activity:
ION OF SHELL NOZZLES AND MANWAYS
Project:
PROJECT Activity:
ION OF AC, NAME PLATE BRACKET, SM, EARTHING LUGS, ETC
Project:
PROJECT Activity:
ION OF HEATING COILS
Project:
PROJECT Activity:
ON & APPROVAL OF CP DESIGN BASIS
Project:
PROJECT Activity:
ON & APPROVAL OF DRAWINGS & MR
Project:
PROJECT Activity:
ON & APPROVAL OF FIRE FIGHTING DRAWINGS
Project:
PROJECT Activity:
ION & APPROVAL OF FFS DRAWINGS, MTO & MR
Project:
PROJECT Activity:
T OF ORDER FOR SUPPLY OF CP SYSTEM
Project:
PROJECT Activity:
OF CP MATERIALS AT
Project:
PROJECT Activity:
T OF ORDER FOR FF SYSTEM
Project:
PROJECT Activity:
OF BOUGHT OUT ITEMS MATERIALS AT
Project:
PROJECT Activity:
T OF ORDERS
Project:
PROJECT Activity:
ILIZATION
Project:
PROJECT Activity:
ON & APPROVAL OF DRAWINGS AND PROCEDURES
Project:
PROJECT Activity:
T OF ORDER FOR STRUCTURAL STEEL
Project:
PROJECT Activity:
T OF ORDER FOR FASTNERS
Project:
PROJECT Activity:
OF MATERIALS AT

1234CFF030

FABRICAT

1234CFF040

BLASTING

1234CFF050

DESPATCH

1234CFP010

FABRICAT

1234CFP020

FABRICAT

1234CFP030

BLASTING

1234CFP040

DESPATCH

1234CFT010

FABRICAT

1234CFT030

FABRICAT

1234CFT050

FABRICAT

1234CFT060

FABRICAT

1234CFT070

FABRICAT

1234CFT080

FABRICAT

1234CFT090

FABRICAT

1234CFT120

FABRICAT

1234CFT130

FABRICAT

1234CPS010

SUBMISSI

1234CPS020

SUBMISSI

1234FFS010

SUBMISSI

1234FFS020

SUBMISSS

1234PCP010

PLACEMEN

1234PCP020

RECEIPT

1234PFF010

PLACEMEN

1234PFF020

RECEIPT

1234PMS120

PLACEMEN

1234PMS130

SITE MOB

1234PMS140

SUBMISSI

1234PPR010

PLACEMEN

1234PPR020

PLACEMEN

1234PPR030

RECEIPT

Project:
PROJECT Activity:
T OF ORDER FOR TORR STEEL
Project:
PROJECT Activity:
T OF ORDER FOR CEMENT & AGGREGATES
Project:
PROJECT Activity:
OF TORR STEEL
Project:
PROJECT Activity:
OF CEMENT, AGGREGATES, ETC
Project:
PROJECT Activity:
ON & APPROVAL OF PIPE RACK STRUCTURE DRAWINGS
Project:
PROJECT Activity:
ON & APPROVAL OF DRAWINGS, MTO & MR
Project:
PROJECT Activity:
T OF ORDER FOR STRUCTURE MATERIALS
Project:
PROJECT Activity:
T OF ORDER FOR PIPES & FITTINGS
Project:
PROJECT Activity:
T OF ORDER FOR OTHER MISC ITEMS
Project:
PROJECT Activity:
T OF ORDER FOR PAINTS
Project:
PROJECT Activity:
OF STRUCTURE MATERIALS AT WORKS
Project:
PROJECT Activity:
OF PIPES & FITTINGS AT WORKS
Project:
PROJECT Activity:
OF OTHER MISC ITEMS AT WORKS
Project:
PROJECT Activity:
OF PAINTS AT WORKS
Project:
PROJECT Activity:
MOBILIZATION
Project:
PROJECT Activity:
EQUIPMENT MOBILIZATION
Project:
PROJECT Activity:
ON AND APPROVAL OF QA/QC DOCUMENTS & CONST PROCEDURES
Project:
PROJECT Activity:
ICE ESTABLISHMENT

1234PRC010

PLACEMEN

1234PRC020

PLACEMEN

1234PRC030

RECEIPT

1234PRC040

RECEIPT

1234PRS010

SUBMISSI

1234PRS020

SUBMISSI

1234PRT020

PLACEMEN

1234PRT030

PLACEMEN

1234PRT040

PLACEMEN

1234PRT050

PLACEMEN

1234PRT110

RECEIPT

1234PRT120

RECEIPT

1234PRT130

RECEIPT

1234PRT140

RECEIPT

1234PSA100

MANPOWER

1234PSA110

PLANT &

1234PSA120

SUBMISSI

1234PSA140

SITE OFF

Potrebbero piacerti anche