Sei sulla pagina 1di 8

1.

CROQUI

Arquibancada

P1

P2

C1

C2

T2

T3

T1

T4

C4

C3
E1

P4

P3

Alambrado

LEGENDA
E1
C1
C2
C3
C4
T1
T2
T3
T4
P1
P2
P3
P4

Estao (Teodolito)
Canto do Campo (Escanteio)
Canto do Campo (Escanteio)
Canto do Campo (Escanteio)
Canto do Campo (Escanteio)
Trave
Trave
Trave
Trave
Poste
Poste
Poste
Poste

2. DADOS
2.1 CANTOS DO CAMPO (ESCANTEIO)
Pontos
Visados
E1-C1
E1-C2
E1-C3
E1-C4

ngulo
Vertical
90 40 42
90 15 55
90 23 48
98 46 29

ngulo
Horizontal
0 00 00
50 56 40
82 06 31
31 57 52

Fio
Superior
1,332 m
1,580 m
1,480 m
1,040 m

ngulo
Vertical
91 46 13
91 17 03
90 19 10
90 22 07

ngulo
Horizontal
08 11 55
05 29 57
6159 15
67 12 00

Fio
Superior
1,160 m
1,204 m
1,504 m
1,486 m

ngulo
Vertical
90 37 11
90 22 37
90 34 32
92 34 55

ngulo
Horizontal
15 57 59
43 42 46
82 22 55
75 31 58

Fio
Superior
1,360 m
1,500 m
1,370 m
1,120 m

Fio Mdio
1,166 m
1,290 m
1,240 m
1,020 m

Fio
Inferior
1,000 m
1,000 m
1,000 m
1,000 m

2.2 TRAVES
Pontos
Visados
E1-T1
E1-T2
E1-T3
E1-T4

Fio Mdio
1,080 m
1,102 m
1,252 m
1,243 m

Fio
Inferior
1,000 m
1,000 m
1,000 m
1,000 m

2.3 POSTES
Pontos
Visados
E1-P1
E1-P2
E1-P3
E1-P4

3. CLCULOS
3.1 DH
3.1.1 DH dos cantos do campo (Escanteio)
DHE1-C1 = (Fs Fi) * 100 * (sen Z)2
DHE1-C1 = (1.332 1, 000) * 100 * (sen 90 40 42)2
DHE1-C1 = 33, 195m

Fio Mdio
1,180 m
1,250 m
1,185 m
1,060 m

Fio
Inferior
1,000 m
1,000 m
1,000 m
1,000 m

DHE1-C2= (Fs Fi) * 100 * (sen Z)2


DHE1-C2= (1,580 1, 000) * 100 * (sen 90 15 55)2
DHE1-C2= 57, 999m

DHE1-C3= (Fs Fi) * 100 * (sen Z)2


DHE1-C3= (1, 480 1, 000) * 100 * (sen 90 23 48)2
DHE1-C3= 47, 998 m

DHE1-C4= (Fs Fi) * 100 * (sen Z)2


DHE1-C4= (1, 040 1, 000) * 100 * (sen 98 46 29)2
DHE1-C4= 3, 907 m

3.1.2 DH das Traves


DHE1-T1= (Fs Fi) * 100 * (sen Z)2
DHE1-T1= (1, 160 1, 000) * 100 * (sen 91 46 13)2
DHE1-T1= 15, 985 m

DHE1-T2= (Fs Fi) * 100 * (sen Z)2


DHE1-T2= (1, 204 1, 000) * 100 * (sen 91 17 03)2
DHE1-T2= 20, 390 m

DHE1-T3= (Fs Fi) * 100 * (sen Z)2


DHE1-T3= (1,504 1, 000) * 100* (sen 90 19 10)2
DHE1-T3= 50, 398 m

DHE1-T4= (Fs Fi) * 100 * (sen Z)2


DHE1-T4= (1,486 1, 000) * 100 * (sen 90 22 07)2
DHE1-T4= 48, 598 m

3.1.3 DH dos Postes


DHE1-P1= (Fs Fi) * 100 * (sen Z)2
DHE1-P1= (1, 360 1, 000) * 100 * (sen 90 37 11)2
DHE1-P1= 35, 996 m

DHE1-P2= (Fs Fi) * 100 * (sen Z)2


DHE1-P2= (1, 500 1, 000) * 100 * (sen 90 22 37)2
DHE1-P2= 49, 998 m

DHE1-P3= (Fs Fi) * 100 * (sen Z)2


DHE1-P3= (1,370 1, 000) * 100 * (sen 90 34 32)2
DHE1-P3= 36, 996 m

DHE1-P4= (Fs Fi) * 100 * (sen Z)2


DHE1-P4= (1,120 1, 000) * 100 * (sen 92 34 55)2
DHE1-P4= 11, 976 m

3.2 NGULOS
3.2.1 ngulos dos Cantos do Campo (Escanteio)
1 entre C1 e C2 = 50 56 40 0 00 00= 50 56 40
2 entre C2 e C3 = 82 06 31 50 56 40= 31 09 51
3 entre C3 e C4 = 82 06 31 31 57 52= 50 08 39

3.2.2 ngulos das Traves


4 entre T1 e T2 = 08 11 55 05 29 57= 2 41 58
5 entre T2 e T3 = 61 59 15 - 05 29 57= 56 29 18
6 entre T3 e T4 = 67 12 00 - 61 59 15= 05 12 45

3.2.3 ngulos dos Postes


7 entre P1 e P2 = 43 42 46 15 57 59= 27 44 47
8 entre P2 e P3 = 82 22 55 43 42 46= 38 40 09
9 entre P3 e P4 = 82 22 55 75 31 58= 06 50 57

4. TABELA DE RESULTADOS
PONTO
C1
C2
C3
C4
T1
T2
T3
T4
P1
P2
P3
P4

DINTANCIA ENTRE E1 E O PONTO VISADO


33, 195 m
57, 999 m
47, 998 m
3, 907 m
15, 985 m
20, 390 m
50, 398 m
48, 598 m
35, 996 m
49, 998 m
36, 996 m
11, 976 m

NGULO
1
2
3
4
5
6
7
8
9

NGULO FORMADO
C1 e C2= 50 56 40
C2 e C3= 31 09 51
C3 e C4 = 50 08 39
T1 e T2 = 2 41 58
T2 e T3 = 56 29 18
T3 e T4= 05 12 45
P1 e P2 = 27 44 47
P2 e P3 = 38 40 09
P3 e P4 = 06 50 57

5. REA DO CAMPO
Encontra-se junto planta.

INSTITUTO FEDERAL DO ESPIRITO SANTO


CURSO TCNICO EM EDIFICAES

Rafael Morais Dal Fior

LEVANTAMENTO TOPOGRFICO DO CAMPO DE FUTEBOL DO IFES


CAMPUS NOVA VENCIA TP02 CAMPO

NOVA VENCIA
2014

INSTITUTO FEDERAL DO ESPIRITO SANTO


CURSO TCNICO EM EDIFICAES

Aluno: Rafael Morais Dal Fior


Turma: N15
Equipe: Giliard Silva, Natlia Strelow

LEVANTAMENTO TOPOGRFICO DO CAMPO DE FUTEBOL DO IFES


CAMPUS NOVA VENCIA TP02 CAMPO

NOVA VENCIA
2014