Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
5 MW (KKK) REPLACEMENT
Documents to be released by Technical Services, with generic process modification schemes (not exhaustive list)
1. P&ID
2. Process Data Sheet of new equipment (PDS)
3. Instrument Process Data Sheet of new instruments (IPDS)
Evaluation of the amendments in existing infrastructure will be done by Technical Services along with all associated departments (CIVIL/ MECH./ HSE/ INST./ PROCESS
OWNER) as per FORMAT#1 following and signature with or without comments will be put in FORMAT #2
FORMAT#1
Product/ process
Environmental Load
(ISO 9001)
(UTILITY )
(ISO 14001)
Yield
Quality
Yes
No
Technique
adopted for
evaluation
Yes No
Technique
adopted for
evaluation
Impact
Yes
No
Technique
adopted for
evaluation
Page 1 of 4
Occupational risk
Food hazard
(UTILITY)
(UTILITY)
Management
(ISO 22000)
ISO 50001
(OHSAS 18001)
Energy
Effluent load
Yes
No
Technique
adopted for
evaluation
Yes
No
Technique
adopted for
evaluation
Yes
No
Synergistic
effect
Technique
adopted for
evaluation
FORMAT#2
DEPARTMENT
PARAMTERS
Quality
Yield
Quality
Yield
PROCESS OWNER
(POWER HOUSE)
PROCESS OWNER
(BOILER)
Page 2 of 4
SIGN
REMARKS, IF ANY
PROCESS OWNER
(INSTRUMENTATION)
Maintenance hindrance
PROCESS OWNER
(PROJECT)
Maintenance hindrance
Occupational Risk
PROCESS OWNER
(ENERGY)
TECHNICAL SERVICES
Page 3 of 4
Page 4 of 4