Sei sulla pagina 1di 2

CONSULTANT : URS UKL In Association with RDC CONTRACTOR : BMG-KDAW JOINT VENTURE

From To Side
51+790 51+840 LHS Mr Nilanka 8.00
52+000 52+640 RLH Mr Liyanage 8.00
51+620 51+640 LHS Mr Anuruddha 8.00
52+870 51+970 RHS Mr Nilanka
8.00
52+650 52+700 RLH Mr Liyanage
8.00
43+100 43+170 LHS Mr jeewandra
8.00
44+750 44+850 RLH Mr jeewandra
8.00
52+570 52+670 LHS Mr Anuruddha
8.00
First layer
44+750 44+800 RHS Mr Jeewendra
8.00
First layer
52+750 52+470 LHS Mr Nilanga
8.00
Top layer
44+870 45+020 RHS Mr Gamini
8.00
First layer
46+730 46+940 RHS Mr Jeewandra
8.00
43+670 43+800 RHS Mr Madusanka
8.00
46+870 46+970 RHS Mr Gamini
8.00
50+600 50+680 B/S Mr Bandarathilaka 8.00
44+480 44+740 RHS Mr Gamini 8.00
46+720 46+870 LHS Mr Gamini 8.00
6 50+440 50+690 RHS Mr Nilanga 10.00
7 42+950 53+670 B/S Mr Amarasena 8.00
Submitted By Date Time Time
Name: N.S. Wickramasinghe
Signature:
1 Roadway Excavation for Edge Widening
Sub Base
Construction
3
4 DGAB Laying
Embankment Construction/ Rock filling 2
Prime 5
Asphalt
REHABILITATION/IMPROVEMENT TO B157(WEST)ROAD SECTION FROM ALUTHGAMA TO SOUTHERN EXPRESSWAY (42+600 KM-53+670KM)
Remarks
Location
Contractor's Site
Supervisor
A
c
k
n
o
w
l
a
d
g
e
d
D
o
n
e
O
r

N
o
t
D
o
n
e
CONTRACT NO: RDA/NHSP/ICB/ADB/CP-3
NOTICE FOR CONSTRUCTION - WORK SCHEDULE (SECTION A/B)
Start
Time
W
i
l
l
A
t
t
e
n
d
Item
No.
Description of Works
Road Maintanance
30.10.2014 14.00
Received By
Contractor Engineer
Date : 31/10/2014
CONSULTANT : URS UKL In Association with RDC CONTRACTOR : BMG-KDAW JOINT VENTURE
From To Side
160 mm UPVC-House
connection Providing
50+450 50+750 RHS Ms Nirosha 8.00
500mm DI
50+965 51+100 RHS Mr Mujarick
8.00
Base Concrete 47+190 47+205 RHS Mr Chinthaka 8.00
Base Concrete 43+631 43+637 RHS Mr Wathsara 8.00
Wall Concrete 51+080 51+110 LHS Mr Ashoka 8.00
Wall Concrete 53+020 53+050 RHS Mr Ashoka 8.00
Backfilling & Embankment
Construction
LHS Mr Viraj 8.00
R/f,F/w & Concrete - M/End
(Abutment wall)
RHS Mr Dhaminda 8.00
Wing wall f/w, r/f & Concrete LHS Mr Chinthana 8.00
Excavation for Base
Construction
RHS Mr Aruna 8.00
Submitted By Date Time Time
Name: N.S. Wickramasinghe
Signature:
7 Pipe laying
Lined Drain 8
Received By
Engineer
9
Bridge /
Culvert
Constructio
n
Contractor
30.10.2014 14.00
43/5,6
46/3
43/5,6
48/1
Remarks
REHABILITATION/IMPROVEMENT TO B157(WEST)ROAD SECTION FROM ALUTHGAMA TO SOUTHERN EXPRESSWAY (42+600 KM-53+670KM)
CONTRACT NO: RDA/NHSP/ICB/ADB/CP-3
NOTICE FOR CONSTRUCTION - WORK SCHEDULE (SECTION A/B)
Item
No.
Location
Contractor's Site
Supervisor
A
c
k
n
o
w
l
a
d
g
e
d
D
o
n
e

O
r

N
o
t

D
o
n
e
Description of Works
Start
Time
W
i
l
l

A
t
t
e
n
d
Date - 31/10/2014