CONSULTANT : URS UKL In Association with RDC CONTRACTOR : BMG-KDAW JOINT VENTURE

From To Side
50+840 50+980 LHS Mr Roshan 8.00
51+180 51+350 LHS Mr Roshan 8.00
51+160 51+250 LHS Mr Rathnayaka 8.00
52+670 52+790 RHS Mr Liyanage 8.00
51+770 51+800 RHS Mr Nilanka 8.00
43+100 43+170 LHS Mr Madusanka
8.00
44+970 45+020 RHS Mr Gamini
8.00
52+890 52+990 LHS Mr Liyanage 8.00
52+780 52+880 LHS Mr Nilanka 8.00
52+770 52+800 LHS Mr Nilanka
8.00
Top layer
44+680 44+740 LHS Mr Madusanka
8.00
Top layer
44+870 44+970 LHS Mr Madusanka
8.00
Top layer
46+760 46+920 RHS Mr Jeewandra
8.00
First Layer 52+780 52+880 RHS Mr Nilanka 8.00
First Layer 51+950 51+970 LHS Mr Anuruddha 8.00
First Layer 53+090 53+150 LHS Mr Liyanage 8.00
Final 44+480 44+680 RHS Mr Madusanka
8.00
First layer 46+975 47+100 RHS Mr Gamini
8.00
Final 50+440 50+500 RHS Mr Bandarathilaka 8.00
5 50+500 50+680 LHS Mr Bandarathilaka 8.00
6 44+780 44+850 L/RHS Mr Lasantha 8.00
7 42+950 53+670 B/S Mr Amarasena 8.00
Submitted By Date Time Time
Name: N.S. Wickramasinghe
Signature:
1 Roadway Excavation for Edge Widening
2 Embankment Construction/ Rock filling
Sub Base
Construction
3
DGAB Laying 4
REHABILITATION/IMPROVEMENT TO B157(WEST)ROAD SECTION FROM ALUTHGAMA TO SOUTHERN EXPRESSWAY (42+600 KM-53+670KM)
Remarks
Location
Contractor's Site
Supervisor
A
c
k
n
o
w
l
a
d
g
e
d
D
o
n
e
O
r

N
o
t
D
o
n
e
CONTRACT NO: RDA/NHSP/ICB/ADB/CP-3
NOTICE FOR CONSTRUCTION - WORK SCHEDULE (SECTION A/B)
Start
Time
W
i
l
l
A
t
t
e
n
d
Item
No.
Description of Works
Backfilling of removed CEB post bore
Road Maintanance
07.10.2014 14.00
Received By
Contractor Engineer
Rock drilling & blasting
Date : 08/10/2014
CONSULTANT : URS UKL In Association with RDC CONTRACTOR : BMG-KDAW JOINT VENTURE
From To Side
160 mm UPVC-House
connection Providing
50+450 50+750 RHS Ms Nirosha 8.00
400mm DI 50+450 51+620 LHS Mr Cyril 8.00 pressure testing
400mm DI
52+360 52+400 RHS Mr Mujarick
8.00
Wall Concrete 51+070 51+090 RHS Mr Asoka 8.00
Wall Concrete 52+990 53+005 RHS Mr Asoka 8.00
Wall Concrete 43+627 43+649 RHS Mr Wathsara 8.00
Base Concrete 43+637 43+649 RHS Mr Wathsara 8.00
Base Concrete 47+130 47+142 RHS Mr P.Fronado 8.00
Base Concrete 44+700 44+730 RHS Mr Wathsara 8.00
Backfilling & Embankment
Construction
LHS Mr Viraj 8.00
Fabrication of r/f - M/End
Abutment
RHS Mr Dhaminda 8.00
Abutment wall Concrete 3nd
Step - M/End
LHS Mr Aruna 8.00
Cut off wallconcrete - M/End LHS Mr Aruna 8.00
Hand drail base cocreting LHS Mr Aruna 8.00
Formwork for Abutment wall-
A/End, De watering
LHS Mr Bandara 8.00
R/f & F/W for culvert wall LHS Mr Sandun 8.00
Submitted By Date Time Time
Name: N.S. Wickramasinghe
Signature:
Received By
Engineer
10
Bridge /
Culvert
Constructio
n
Contractor
43/7
43/7
43/5,6
8 Pipe laying
Lined Drain 9
07.10.2014 14.00
43/5,6
48/1
44/3
46/3
Remarks
REHABILITATION/IMPROVEMENT TO B157(WEST)ROAD SECTION FROM ALUTHGAMA TO SOUTHERN EXPRESSWAY (42+600 KM-53+670KM)
CONTRACT NO: RDA/NHSP/ICB/ADB/CP-3
NOTICE FOR CONSTRUCTION - WORK SCHEDULE (SECTION A/B)
Item
No.
Location
Contractor's Site
Supervisor
A
c
k
n
o
w
l
a
d
g
e
d
D
o
n
e

O
r

N
o
t

D
o
n
e
Description of Works
Start
Time
W
i
l
l

A
t
t
e
n
d
Date - 08/10/2014

Potrebbero piacerti anche