1. With a neat PV and TS diagram explain how the reheating, regeneration and intercooling in gas
turbine power plant increase the efficiency of the cycle.
2. What are the advantages limitation and application of open and closed cycle gas turbine power
plant.
3. Discuss the working of a combined cycle gas turbine power plant
4. What are the methods of starting diesel engines? Explain.
5. Draw and explain the air intake system and exhaust system of a diesel power plant.






Dr.Sivanthi Aditanar College Of Engineering
Tiruchendur
ME2403 Power Plant Engineering
VII Semester
Department of Mechanical Engineering
Max Marks 50 Time 1.5Hrs Date 13/10/14

Answer Any Four(4*12.5=50)
1. With a neat PV and TS diagram explain how the reheating, regeneration and intercooling in gas
turbine power plant increase the efficiency of the cycle.
2. What are the advantages limitation and application of open and closed cycle gas turbine power
plant.
3. Discuss the working of a combined cycle gas turbine power plant
4. What are the methods of starting diesel engines? Explain.
5. Draw and explain the air intake system and exhaust system of a diesel power plant.