Sei sulla pagina 1di 6

Value Unit

1 L/s
1 L/s
Value Unit
10 m
1 bar
0.5 bar
1.5 bar
PROJECT: 2B+G+22 RESIDENTIAL & COMMERCIAL BUILDING, DUBAI
CALCULATION FOR FOUL WATER SUMP PUMP CAPACITY
Calculation of Pump Flow Rate
Description
Pump Selection
Hence, two pumps with one duty and one duty-assist
Each Sump Pump capacity
Head Calculation
Assumed Flow
Quantity- 1 No (Ref: FWSP-01)
Total
Assumed Sump Pump Head - 1.50 Bar
Description
Vertical Lift
Hence, Vertical Lift Pr.Drop
Additional Line Pr.Drop,valves and fittings
Value Unit
1 L/s
1 L/s
Value Unit
10 m
1 bar
0.5 bar
1.5 bar
PROJECT: 2B+G+22 RESIDENTIAL & COMMERCIAL BUILDING, DUBAI
CALCULATION FOR SUMP PUMP CAPACITY
Calculation of Pump Flow Rate
Description
Pump Selection
Hence, two pumps with one duty and one duty-assist
Each Sump Pump capacity
Head Calculation
Assumed Flow
Quantity- 2 Nos (Ref: SP-01 to SP-02)
Assumed Sump Pump Head - 1.50 Bar
Total
Description
Vertical Lift
Hence, Vertical Lift Pr.Drop
Additional Line Pr.Drop,valves and fittings
Value Unit
47.25 L/s
45 Min
128 m3
47.25 L/s
5.00 L/s
5.00 L/s
Value Unit
95 m
9.5 bar
2 bar
7 bar
18.5 bar
Basis of Design: NFPA 14 2003 Edition
Transfer Time
Hence, Fire Reserve required
NFPA recommended Flow Rate for Fire pump
PROJECT: 2B+G+22 RESIDENTIAL & COMMERCIAL BUILDING,DUBAI
CALCULATION FOR FIRE PUMP CAPACITY
Calculation of Pump Flow Rate
Description
Hence, Vertical Lift Pr.Drop
Additional Line Pr.Drop
Pump Selection
Hence, two pumps with one duty and one standby are
selected, FP-01(Electric) and FP-02 (Diesel Driven)
Each Fire pump capacity
Head Calculation
Quantity- 1 No Electrical. 1 No. Diesel, 1 No Jockey
Capacity of Jockey Pump, FJP-01
Jockey pump capacity
Assumed Fire Pump Head - 18.5 Bar
Pressure required at the farthest landing valve
Total
Description
Vertical Lift
Value Unit
160 M3
4 Hrs
40.00 M3/Hr
11.15 L/s
5.58 L/s
Value Unit
95 m
9.5 bar
1.5 bar
11 bar
Description
Vertical Lift
Additional Line Pr.Drop
Hence, Vertical Lift Pr.Drop
Assumed Transfer Pump Head - 11 Bar
Total
Hence, Flow = 160 / 4
Total Flow
Each Transfer pump capacity
Pump Selection
Hence, two pumps with one duty and one stand-by are
selected.
Head Calculation
Description
Quantity of water to be transferred from B2 tank to Roof
tank
PROJECT: 2B+G+22 RESIDENTIAL & COMMERCIAL BUILDING, DUBAI
CALCULATION FOR TRANSFER PUMP CAPACITY
Calculation of Pump Flow Rate- CWTP-01,02,03
Transfer time
Area WC BIDET Bib Tap
Cold Cold Cold Hot Cold Hot Cold Hot Cold Hot Cold Hot Cold
Loading units per Application
Considered 2 2 2 2 3 3 3 3 10 10 3 3 10
PENTHOUSE ROOF FLOOR
Bib tap 6
PENTHOUSE FLOOR
PH1 3 2 3 3 1 1 1 1 2 2 1 1
PH2 5 4 5 5 1 1 1 1 3 3 1 1
PH3 5 4 5 5 1 1 1 1 3 3 1 1
Garbage Room 1
Window Cleaning Bib tap 6
21st FLOOR
Apartment B-1 3 2 3 3 1 1 1 1 2 2 1 1
Apartment B-2 3 2 3 3 1 1 1 1 2 2 1 1
Apartment E-1 4 3 4 4 1 1 1 1 3 3 1 1
Apartment E-2 4 3 4 4 1 1 1 1 3 3 1 1
Apartment F-1 4 3 4 4 1 1 1 1 3 3 1 1
Apartment F-2 4 3 4 4 1 1 1 1 3 3 1 1
Garbage Room 1
Window Cleaning Bib tap
20th FLOOR
Apartment B-1 3 2 3 3 1 1 1 1 2 2 1 1
Apartment B-2 3 2 3 3 1 1 1 1 2 2 1 1
Apartment E-1 4 3 4 4 1 1 1 1 3 3 1 1
Apartment E-2 4 3 4 4 1 1 1 1 3 3 1 1
Apartment F-1 4 3 4 4 1 1 1 1 3 3 1 1
Apartment F-2 4 3 4 4 1 1 1 1 3 3 1 1
Garbage Room 1
Window Cleaning Bib tap
19th FLOOR
Apartment B-1 3 2 3 3 1 1 1 1 2 2 1 1
Apartment B-2 3 2 3 3 1 1 1 1 2 2 1 1
Apartment E-1 4 3 4 4 1 1 1 1 3 3 1 1
Apartment E-2 4 3 4 4 1 1 1 1 3 3 1 1
Apartment F-1 4 3 4 4 1 1 1 1 3 3 1 1
Apartment F-2 4 3 4 4 1 1 1 1 3 3 1 1
Garbage Room 1
Window Cleaning Bib tap
18th FLOOR
Apartment B-1 3 2 3 3 1 1 1 1 2 2 1 1
Apartment B-2 3 2 3 3 1 1 1 1 2 2 1 1
Apartment E-1 4 3 4 4 1 1 1 1 3 3 1 1
Apartment E-2 4 3 4 4 1 1 1 1 3 3 1 1
Apartment F-1 4 3 4 4 1 1 1 1 3 3 1 1
Apartment F-2 4 3 4 4 1 1 1 1 3 3 1 1
Garbage Room 1
Window Cleaning Bib tap
17th FLOOR
Apartment B-1 3 2 3 3 1 1 1 1 2 2 1 1
Apartment B-2 3 2 3 3 1 1 1 1 2 2 1 1
Apartment E-1 4 3 4 4 1 1 1 1 3 3 1 1
Apartment E-2 4 3 4 4 1 1 1 1 3 3 1 1
Apartment F-1 4 3 4 4 1 1 1 1 3 3 1 1
Apartment F-2 4 3 4 4 1 1 1 1 3 3 1 1
Garbage Room 1
Swimming Pool 4 4 4 4 4 6
TOTAL 127 90 127 127 33 33 33 33 88 88 37 37 24
Dish Washer
PROJECT: 2B+G+22 RESIDENTIAL & COMMERCIAL BUILDING, DUBAI
LOADING UNITS FOR BOOSTER PUMP FLOW CALCULATION- CWBP-01,02
Shower Kitchen Sink Wash Basin Water Tub
Area WC BIDET Bib Tap
Cold Cold Cold Hot Cold Hot Cold Hot Cold Hot Cold Hot Cold
Loading units per Application
Considered 2 2 2 2 3 3 3 3 10 10 3 3 10
Dish Washer
PROJECT: 2B+G+22 RESIDENTIAL & COMMERCIAL BUILDING, DUBAI
LOADING UNITS FOR BOOSTER PUMP FLOW CALCULATION- CWBP-01,02
Shower Kitchen Sink Wash Basin Water Tub
Total Loading Units 877
Flow Rate From Chart (L/s) 7
Total Flowrate (L/s) 7
Flow Required For Pumpset
(L/s)
4
(One Duty+One Duty Assist)
Assumed Pump Head 3.5 Bar
Jockey Pump
Assumed Flow 1.6 L/s
Assumed Pump Head 3.5 Bar
Head Calculation
Value Unit
1.5 bar
1.5 bar
3.1 bar
Hence, Horizontal Pr.Drop (200 Pascals for 1
Meter)
Description
Assumed Transfer Pump Head - 3.5 Bar
50 m
0.1 bar
Horizontal Length from riser to the last connection.
Additional Line, Valves and Fittings Pr.Drop
Total
Pressure require at the farthest water supply point

Potrebbero piacerti anche