Sei sulla pagina 1di 8

MATERIAL TAKE OFF

PILING ALL EQUIPMENT AND CONCRETE WORK STORAGE TANK (T0-0-5-


01) AND HEATER (EA-0-5-01) FOUNDATION (FF COOLER EXCL.)
PROJECT : CL COAL TAR STORAGE TANK CLIENT : PT. CABOT INDONESIA LOCATION
: CILEGON, BANTEN
PT. RE Job No :
13-2404
PO No :
46926 OS
Issued for Construction
Issued for Construction
Issued for Construction
Issued for Review
Issued for Review
DESCRIPTION
REVISION HISTORICAL SHEET
Rev. No. Date Page Description of Changes
No.
A 04-Okt-13 Issued For Review
B 08-Okt-13 Issued For Review
0 17-Okt-13 Issued For Construction
1 15-Nov-13 Issued For Construction
2 25-Nov-13 Issued For Construction
`
MATERIAL TAKE OFF
PILING ALL EQUIPMENT AND CONCRETE WORK STORAGE TANK (T0-
0-5-01) AND HEATER (EA-0-5-01) FOUNDATION (FF COOLER EXCL.)
Job No. : 13-2404
PTCI REVIEW
MATERIAL TAKE OFF
PILING ALL EQUIPMENT AND CONCRETE WORK STORAGE TANK (T0-
0-5-01) AND HEATER (EA-0-5-01) FOUNDATION (FF COOLER EXCL.)
Job No. : 13-2404
Doc No. :
CTT04-000-BM-01-001R & 002R
Date 25-Nov-13 Prep RTM Chkd
WP/NNG
REV. DATE PT RE PREPARED PT RE CHECK PT RE APVD
IH
A 04-Okt-13 RTM WP/NNG SW IH
B 08-Okt-13 RTM WP/NNG SW
IH
0 17-Okt-13 RTM WP/NNG SW IH
1 15-11-13 RTM WP/NNG SW
Doc No. :
CTT04-000-BM-01-001R & 002R
Page No.:
1 of 4
Rev.
2
2 25-11-13 RTM WP/NNG SW IH
NO DISCRIPTION UNIT QTY REF. DRAWING NO.
TABLE OF CONTENT
1. MATERIAL TAKE OFF PILING ALL EQUIPMENT AND CONCRETE WORK STORAGE TANK (T0-0-5-01) AND
HEATER (EA-0-5-01) FOUNDATION 4
MATERIAL TAKE OFF
PILING ALL EQUIPMENT AND CONCRETE WORK, STORAGE TANK (T0-0-5-01) AND HEATER (EA-0-5-01)
FOUNDATION
CL COALTAR STORAGE TANK PROJECT
(FF COOLER EXCL)
JOB NO. : 13-2404 REV 2
DOC. NO. :
CTT04-000-CE-01-001R & 002R
DATE BY CHCKD APVD
25-11-13 RTM WP/NNG SW
MATERIAL TAKE OFF
PILING ALL EQUIPMENT AND CONCRETE WORK STORAGE TANK (T0-
0-5-01) AND HEATER (EA-0-5-01) FOUNDATION (FF COOLER EXCL.)
Doc No. :
CTT04-000-BM-01-001R & 002R
Date 25-Nov-13 Prep RTM Chkd
WP/NNG
I.
a.
b.
II.
1.
2.
Bore Pile
Bore Pile 1200
Bore on Soil 1200 mm Soil Disposal
Concrete Fc' 300 kg/cm2 Plain Bar D10
Deform Bar D22
Bore Pile 600
Bore on Soil 600 mm Soil Disposal
Concrete Fc' 300 kg/cm2 Plain Bar D10
Deform Bar D22 PDA Test
CONCRETE WORK
CL COAL TAR STORAGE TANK
Soil Excavation Soil Back Fill Soil Disposal
Compacted Sub Grade (95% Dry density) Pile Head Treatment (Pile Cut Off)
Conventional formwork for foundation Leveling Concrete Fc' 135 kg/cm2 Concrete
Fc' 300 kg/cm2
Deform Bar D13 Deform Bar D19 Deform Bar D22
Sand Compacted (97% Dry density) Sand 100 Thk
Drain Pipe SCH40 Carbon Steel 1" Flexible Membrane liner
Gravel
Anchor Bolts 2", L = 1100, Membrane should coverall concrete wall
FOUNDATION HEATER (EA-0-5-01)
Soil Excavation Soil Back Fill Soil Disposal
Pile Head Treatment (Pile Cut Off) Conventional formwork for foundation Leveling
Concrete Fc' 135 kg/cm2 Concrete Fc' 300 kg/cm2
Plain Bar D10 mm Deform Bar D16 INSERT PLATE
m' m3 m3 kg kg
m' m3 m3 kg kg
ea
m3 m3 m3 m2
ea m2 m3 m3
kg kg kg m3 m3
m m2 M3
ea m2
m3 m3 m3 ea
m2 m3 m3 kg
kg kg
630.00
712.51
712.51
6,672.15
23,983.10
147.00
41.56
41.56
1,646.92
4,311.34
5.00
990.78
169.13
821.65
624.58
42.00
155.13
31.45
591.00
5,553.38
40,500.10
8,123.70
166.00
33.20
3.20
254.47
0.02
48.00
13.70
22.03
13.41
8.63
4.00
23.79
0.56
9.27
95.29
838.79
94.95
CTT04-073-CC-02-011
CTT04-073-CC-03-401
to
CTT04-073-CC-03-402
CTT04-063-CC-03-501-B
MATERIAL TAKE OFF
PILING ALL EQUIPMENT AND CONCRETE WORK STORAGE TANK (T0-0-5-
01) AND HEATER (EA-0-5-01) FOUNDATION (FF COOLER EXCL.)
PROJECT : CL COAL TAR STORAGE TANK CLIENT : PT. CABOT INDONESIA LOCATION
: CILEGON, BANTEN
PT. RE Job No :
13-2404
PO No :
46926 OS
REVISION HISTORICAL SHEET
Rev. No. Date Page Description of Changes
No.
A 04-Okt-13 Issued For Review
B 08-Okt-13 Issued For Review
0 17-Okt-13 Issued For Construction
1 15-Nov-13 Issued For Construction
2 25-Nov-13 Issued For Construction
`
Page 3 of 4
PTCI REVIEW
Page 2 of 4
Rev
2
Apvd SW
IH
IH
IH
IH
Rev.
2
IH
REF. DRAWING NO.
TABLE OF CONTENT
1. MATERIAL TAKE OFF PILING ALL EQUIPMENT AND CONCRETE WORK STORAGE TANK (T0-0-5-01) AND
HEATER (EA-0-5-01) FOUNDATION 4
REV 2
APVD
SW
Rev
2
Apvd SW
CTT04-073-CC-02-011
CTT04-073-CC-03-401
to
CTT04-073-CC-03-402
CTT04-063-CC-03-501-B