PILING ALL EQUIPMENT AND CONCRETE WORK STORAGE TANK (T0-0-5-
01) AND HEATER (EA-0-5-01) FOUNDATION (FF COOLER EXCL.) PROJECT : CL COAL TAR STORAGE TANK CLIENT : PT. CABOT INDONESIA LOCATION : CILEGON, BANTEN PT. RE Job No : 13-2404 PO No : 46926 OS Issued for Construction Issued for Construction Issued for Construction Issued for Review Issued for Review DESCRIPTION REVISION HISTORICAL SHEET Rev. No. Date Page Description of Changes No. A 04-Okt-13 Issued For Review B 08-Okt-13 Issued For Review 0 17-Okt-13 Issued For Construction 1 15-Nov-13 Issued For Construction 2 25-Nov-13 Issued For Construction ` MATERIAL TAKE OFF PILING ALL EQUIPMENT AND CONCRETE WORK STORAGE TANK (T0- 0-5-01) AND HEATER (EA-0-5-01) FOUNDATION (FF COOLER EXCL.) Job No. : 13-2404 PTCI REVIEW MATERIAL TAKE OFF PILING ALL EQUIPMENT AND CONCRETE WORK STORAGE TANK (T0- 0-5-01) AND HEATER (EA-0-5-01) FOUNDATION (FF COOLER EXCL.) Job No. : 13-2404 Doc No. : CTT04-000-BM-01-001R & 002R Date 25-Nov-13 Prep RTM Chkd WP/NNG REV. DATE PT RE PREPARED PT RE CHECK PT RE APVD IH A 04-Okt-13 RTM WP/NNG SW IH B 08-Okt-13 RTM WP/NNG SW IH 0 17-Okt-13 RTM WP/NNG SW IH 1 15-11-13 RTM WP/NNG SW Doc No. : CTT04-000-BM-01-001R & 002R Page No.: 1 of 4 Rev. 2 2 25-11-13 RTM WP/NNG SW IH NO DISCRIPTION UNIT QTY REF. DRAWING NO. TABLE OF CONTENT 1. MATERIAL TAKE OFF PILING ALL EQUIPMENT AND CONCRETE WORK STORAGE TANK (T0-0-5-01) AND HEATER (EA-0-5-01) FOUNDATION 4 MATERIAL TAKE OFF PILING ALL EQUIPMENT AND CONCRETE WORK, STORAGE TANK (T0-0-5-01) AND HEATER (EA-0-5-01) FOUNDATION CL COALTAR STORAGE TANK PROJECT (FF COOLER EXCL) JOB NO. : 13-2404 REV 2 DOC. NO. : CTT04-000-CE-01-001R & 002R DATE BY CHCKD APVD 25-11-13 RTM WP/NNG SW MATERIAL TAKE OFF PILING ALL EQUIPMENT AND CONCRETE WORK STORAGE TANK (T0- 0-5-01) AND HEATER (EA-0-5-01) FOUNDATION (FF COOLER EXCL.) Doc No. : CTT04-000-BM-01-001R & 002R Date 25-Nov-13 Prep RTM Chkd WP/NNG I. a. b. II. 1. 2. Bore Pile Bore Pile 1200 Bore on Soil 1200 mm Soil Disposal Concrete Fc' 300 kg/cm2 Plain Bar D10 Deform Bar D22 Bore Pile 600 Bore on Soil 600 mm Soil Disposal Concrete Fc' 300 kg/cm2 Plain Bar D10 Deform Bar D22 PDA Test CONCRETE WORK CL COAL TAR STORAGE TANK Soil Excavation Soil Back Fill Soil Disposal Compacted Sub Grade (95% Dry density) Pile Head Treatment (Pile Cut Off) Conventional formwork for foundation Leveling Concrete Fc' 135 kg/cm2 Concrete Fc' 300 kg/cm2 Deform Bar D13 Deform Bar D19 Deform Bar D22 Sand Compacted (97% Dry density) Sand 100 Thk Drain Pipe SCH40 Carbon Steel 1" Flexible Membrane liner Gravel Anchor Bolts 2", L = 1100, Membrane should coverall concrete wall FOUNDATION HEATER (EA-0-5-01) Soil Excavation Soil Back Fill Soil Disposal Pile Head Treatment (Pile Cut Off) Conventional formwork for foundation Leveling Concrete Fc' 135 kg/cm2 Concrete Fc' 300 kg/cm2 Plain Bar D10 mm Deform Bar D16 INSERT PLATE m' m3 m3 kg kg m' m3 m3 kg kg ea m3 m3 m3 m2 ea m2 m3 m3 kg kg kg m3 m3 m m2 M3 ea m2 m3 m3 m3 ea m2 m3 m3 kg kg kg 630.00 712.51 712.51 6,672.15 23,983.10 147.00 41.56 41.56 1,646.92 4,311.34 5.00 990.78 169.13 821.65 624.58 42.00 155.13 31.45 591.00 5,553.38 40,500.10 8,123.70 166.00 33.20 3.20 254.47 0.02 48.00 13.70 22.03 13.41 8.63 4.00 23.79 0.56 9.27 95.29 838.79 94.95 CTT04-073-CC-02-011 CTT04-073-CC-03-401 to CTT04-073-CC-03-402 CTT04-063-CC-03-501-B MATERIAL TAKE OFF PILING ALL EQUIPMENT AND CONCRETE WORK STORAGE TANK (T0-0-5- 01) AND HEATER (EA-0-5-01) FOUNDATION (FF COOLER EXCL.) PROJECT : CL COAL TAR STORAGE TANK CLIENT : PT. CABOT INDONESIA LOCATION : CILEGON, BANTEN PT. RE Job No : 13-2404 PO No : 46926 OS REVISION HISTORICAL SHEET Rev. No. Date Page Description of Changes No. A 04-Okt-13 Issued For Review B 08-Okt-13 Issued For Review 0 17-Okt-13 Issued For Construction 1 15-Nov-13 Issued For Construction 2 25-Nov-13 Issued For Construction ` Page 3 of 4 PTCI REVIEW Page 2 of 4 Rev 2 Apvd SW IH IH IH IH Rev. 2 IH REF. DRAWING NO. TABLE OF CONTENT 1. MATERIAL TAKE OFF PILING ALL EQUIPMENT AND CONCRETE WORK STORAGE TANK (T0-0-5-01) AND HEATER (EA-0-5-01) FOUNDATION 4 REV 2 APVD SW Rev 2 Apvd SW CTT04-073-CC-02-011 CTT04-073-CC-03-401 to CTT04-073-CC-03-402 CTT04-063-CC-03-501-B