Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
OBRA: AMPLIACION DEL SUBSISTEMA DE DISTRIBUCION PRIMARIA, EN 10 KV, 3, PARA LA OBRA: CONSTRUCCIN E IMPLEMENTACIN
DEL LUGAR DE LA MEMORIA DE LA REGIN JUNN, CHILCA, HUANCAYO - JUNN
DISTRITO
: CHILCA
FECHA
: NOVIEMBRE - 2013
PROVINCIA : HUANCAYO
ITEM
DESCRIPCION
ESTRUCTURAS
UND.
1.00
2.00
COSTO S/.OBRA
3.00
P.PARC.
P.UNIT.
P.PARC.
1.00
POSTERIA Y ACCESORIOS
1.01
1.00
1.00
1.00
3.00
2,118.64
6,355.93
1,864.41
5,593.22
1.02
0.00
0.00
0.00
0.00
93.22
0.00
98.54
0.00
1.03
6.00
3.00
6.00
15.00
152.54
2,288.14
180.00
2,700.00
1.04
6.00
3.00
6.00
15.00
211.86
3,177.97
250.00
3,750.00
2.00
2.01
0.00
0.00
0.00
0.00
13.56
0.00
16.00
0.00
2.02
6.00
0.00
6.00
12.00
35.59
427.12
42.00
504.00
2.03
0.00
3.00
0.00
3.00
70.00
210.00
70.00
210.00
2.04
Espiga pin para concreto de 19mm. x 254 mm. c/t-ct, con cabeza de plomo
0.00
0.00
0.00
0.00
13.56
0.00
14.20
0.00
2.05
Espiga pin para bastidor de FG de 19mm. x 152 mm. c/t-ct, con cabeza de plomo
0.00
0.00
0.00
0.00
11.86
0.00
12.85
0.00
2.06
0.00
6.00
0.00
6.00
8.05
48.31
9.50
57.00
2.07
6.00
0.00
6.00
12.00
7.20
86.44
8.50
102.00
2.08
3.00
0.00
3.00
6.00
5.93
35.59
7.00
42.00
2.09
6.00
3.00
6.00
15.00
2.54
38.14
3.00
45.00
2.10
0.00
0.00
0.00
0.00
6.36
0.00
6.50
0.00
2.11
3.00
3.00
3.00
9.00
5.51
49.58
5.58
50.22
2.12
3.00
3.00
3.00
9.00
5.93
53.39
7.00
63.00
2.13
3.00
3.00
3.00
9.00
13.56
122.03
16.00
144.00
2.14
3.60
0.00
3.60
7.20
0.85
6.10
1.00
7.20
2.15
Varilla de armar simple de AL-AL para conductor de 35mm2 AAAC, segn req.
0.00
3.00
0.00
3.00
7.63
22.88
9.00
27.00
2.16
18.00
6.00
18.00
42.00
0.85
35.70
1.00
42.00
2.17
18.00
0.00
18.00
36.00
0.85
30.51
1.00
36.00
2.18
12.00
0.00
0.00
12.00
5.93
71.19
5.93
71.19
2.19
Gln
0.20
0.20
0.20
0.60
17.80
10.68
21.00
12.60
3.00
CONDUCTORES
3.01
0.00
101.66
91.65
193.31
1.61
311.26
1.99
384.68
3.02
6.00
7.50
6.00
99.50
0.85
84.32
1.00
99.50
4.00
PUESTA A TIERRA
4.01
Conductor de cobre desnudo temple blando, 7 hilos, de 25mm2 para bajada a tierra
9.50
9.50
9.50
28.50
6.95
198.05
7.80
222.30
4.02
3.00
3.00
3.00
9.00
4.24
38.14
5.20
46.80
4.03
2.00
2.00
2.00
6.00
3.39
20.34
3.45
20.70
S/.
15,452.79
RESUMEN S.S.D.P.
DESCRIPCION
COSTO
15,452.79
2,781.50
9,271.67
4,000.00
4,500.00
500.00
F. CONTINGENCIAS
S.S.D.P.
36,505.97
14,230.41