REGISTRO DE PRUEBAS DE PUESTA A TIERRA

Proyecto No.: Propietario: Reporte No.:


Preparado por: Ubicacin: Fecha:
Temp. de Tierra: Rango de Probador a Tierra: Marca de Equipo:
Plano No.:
PROBAR CADA VARILLA DE TIERRA Y PERNO DE ANCLAJE CON EL PROBADOR DE TIERRA Y REGISTRAR LA LECTURA EN LA TABLA
POZO No. RESISTENCIA DE TIERRA VARILLA DE RESISTENCIA DE TIERRA VARILLA DE RESISTENCIA DE TIERRA
o VARILLA No. EN OHMS TIERRA NO. EN OHMS TIERRA NO. EN OHMS
RESISTENCIA DE TODA LA ZONA (CON TODAS LAS VARILLAS INSTALLADAS Y CONECTADAS) OHMS
COMENTARIOS:
Contratista: Fecha:
Ingeniero del Proyecto: Fecha:
Representante del Propietario: Fecha:
F.C.Elctrico 01 Registro de Pruebas de Puesta a Tierra.XLS
NOTA: ETAPA P - PRELIMINAR
ETAPA I - INTERMEDIA
VERIFICACION DE PUESTA DE TIERRA
Proyecto No.: Propietario: Reporte No.:
Preparado por: Ubicacin: Fecha:
Area: Planos: Hoja No.:
ETAPA ITEM EXCEPCIONES
I VERIF. EQUIPO A TIERRA TAL
COMO SE ESPECIFICA
P VERIF. MANGAS DE PENETRACION
APROPIADAMENTE INSTALADAS
P VERIF. CONECTORES SOLDADOS
CON SEGURIDAD
P VERIF. CONECTORES ATORNILL.
CON SEGURIDAD
I VERIF. PUESTA A TIERRA FIJADA
CON SEGURIDAD
I VERIF. TAMAO CORRECTO DE
CONDUCTOR DE TIERRA
I VERIF. CABLE A TIERRA SIN
DETERIORO
I VERIF. CONEXION ELECTRICA
AL EQUIPO
I VERIF. CABLE DE TIERRA CONECT.
EN LA CAJA DEL MOTOR
I VERIF. VARILLAS DE TIERRA INST.
Y CONECT. EN LUGAR APROPIADO
I VERIF. PUNTOS DE TIERRA
IDENTIFICABLES
Comentarios:
Firma del Contratista: Fecha:
Firma del Ingeniero del Proyecto: Fecha:
Firma del Cliente: Fecha:
F.C.Elctrico 02 Verificacin de Puesta a Tierra.XLS
VERIFICACION CON MEGOMETRO Y
CONDUCTOR / CABLE DE 600 VOLTIOS
Proyecto No.: Propietario: Reporte No.:
Preparado por: Ubicacin: Fecha:
No. de Circuito No. Voltaje Cable De A Meghoms Verificacin
Descripcin Conductor No. Tamao F-F F/T *Visual
Nota: Megar todas las fases
Registrar la Lectura mnima
* Accesos cubiertos, sellos vaciados, montaje de conduit con seguridad, etc.
F= FASES T= TIERRA
APPROBACION: FECHA:
F.C.Elctrico 03 Verificacin con Megmetro y Conductor.XLS
INSPECCION DE CONDUCTOS ELECTRICOS SUBTERRANEOS
Proyecto No.: Propietario: Reporte No.:
Preparado By: Ubicacin: Fecha:
Unidades: Plano de Ref.: Coordenadas:
FUERZA CONTROL INSTRUMENTACION
VERIFICAR ELEVACION DE SALIDAS SEPARACION DE INSTRUMENTOS Y FUERZA DE
DUCTOS MANTENIDOS DE ACUERDO A PLANO.
BANCO DE DUCTOS ELECTRICOS REFORZADOS SEPARACION ENTRE CONDUCTOS
COMPLETAMENTE
BANCO DE DUCTOS ELECTRICOS REFORZADOS SEPARACION ENTRE CONDUCTOS Y EL DUCTO
PARCIALMENTE EXTERIOR
COBERTURA DE CONCRETO ROJO PROFUNDIDAD MINIMA HASTA EL TOPE DEL DUCTO
CONDUCTOS GALVANIZADOS DE ACERO COMPLETOS DUCTO EXTENDIDO 15 CMS. POR ENCIMA DEL PISO O
(EMT) COMO SE DETALLA EN EL PLANO
CONDUCTOS NO METALICOS PVC COMPLETOS SISTEMA DE CONDUCTOS LIMPIADOS Y PROBADOS
CONDUCTOS GALVANIZADOS DE SALIDA DE ACERO TERMINALES DE CONDUCTOS CONECTADOS O
CUBIERTOS CON GORRA
Contratista:
Cliente:
F.C.Elctrico 04 Inspeccin de Conductos Elctricos Subterrneos.XLS
NOTA: ETAPA P - PRELIMINAR
ETAPA I - INTERMEDIA
ETAPA F - FINAL
VERIFICACION DE CONDUCTOS EXPUESTOS
Proyecto No:. Propietario: Reporte No.:
Preparado por : Ubicacin: Fecha:
Area: Planos: Hoja No.:
ETAPA ITEM EXCEPCIONES
P VERIF. INSTALAC. DE ACUERDO
A PLANOS (TAMAO Y RUTA)
P VERIF. MATERIAL Y
CLASIFICACION ESPECIFICADA
P VERIF. COMPUESTOS PARA
ENROSCAR Y PINTURA
ANICORROSIVA
P VERIF. SOPORTES Y ANCLAJE
DE CONDUITS APROPIADOS
P VERIF. CONDUITS FLEXIBLES
INSTALADOS SIN ANCLAJE A
BOMBAS Y EQUIP. VIBRANTES
P VERFI. NO MAS DE 3 CODOS DE 90
ENTRE PUNTOS TIRANTES
P VERIF. UNIONES INSTALADAS EN
EQUIPOS REMOVIBLES
P VERIF. SEPARACIONES DE NIVELES
DE VOLTAJE
P VERIF. JUNTAS DE EXPANSION
INSTALADAS
I VERIF. JUNTAS Y EMPALMES SI
MANTIENEN CONTINUIDAD
ELECTRICA
PIF VERIF. CUBIERTAS Y EMPALMES
INSTALADOS CON SEGURIDAD
P VERIF. ABERTURAS ACCESIBLES
A CAJAS Y CONDUITS
P VERIF. INSTALACION CONDUITS
CON BUENA PRESENTACION
P VERIF. CONEXIONES BIEN
AJUSTADOS EN CONDUITS
P VERIF. UBIC.DE CONDUITS LEJOS
TUBERIAS Y EQUIPOS CALIENTES
Comentarios:
Firma del Contratista: Fecha:
Firma del Ingeniero del Proyecto: Fecha:
Firma del Cliente: Fecha:
F.C.Elctrico 05 Verificacin de Conductos Expuestos.XLS
NOTA: ETAPA P - PRELIMINAR
ETAPA I - INTERMEDIA
ETAPA F - FINAL
VERIFICACION DE ALUMBRADO
Proyecto No:. Propietario: Reporte No.:
Preparado por : Ubicacin: Fecha:
Area: Planos: Hoja No.:
ETAPA ITEM EXCEPCIONES
P VERIF. CORRECTA UBICACION
ACCESORIOS DE ALUMBRADO
P VERIF. MONTAJE DE LUMINARIAS
INSTALADAS CON SEGURIDAD
P VERIF. MONTAJ. FLEXIBLE LUMIN.
DONDE SE REQUIERAN
P VERIF. ALUMBRADO Y
CLASIFICACION ESPECIFICADA
P VERIF. PANELES DISTRIBUCION
SOPORTADOS ADECUADAMENTE
P VERIF. PANELES DISTRIBUCION
ANCLADOS CON SEGURIDAD
P VERIF. PANELES DISTRIBUCION
UBICADOS APROPIADAMENTE
P VERIF. MONTAJE APROPIADO
DE TRANSFORMADORES
P VERIF. ANCLAJE SEGURO
DE TRANSFORMADORES
I VERIF. CIRCUITOS DE CONEXION
A LUMINARIAS
P VERIF. RUTA DE CONDUITS
SEA LA CORRECTA
P VERIF. MATERIALES SIN
DEFECTOS NI DAOS
IF VERIF. ILUMINACION
UNIFORME
IF VERIF. DEL AJUSTE APROPIADO
DE TORNILLOS
IF VERIF. GUIA DE CIRCUITOS ESTE
COMPLETA EN EL PANEL
Comentarios:
Firma del Contratista: Fecha:
Firma del Ingeniero del Proyecto Fecha:
Firma del Cliente: Fecha:
F.C.Elctrico 06 Verificacin de Alumbrado.XLS
FIELD INSTALLATION CHECK LIST (STARTERS)
Project No.: Owner: Report No.:
Prepared by: Location: Date:
Equipment No.: P.O. No.: Spec. No.:
Service: Installed By:
Item to Check Contractor Remarks
OK
Overload relay type and size.
Contractor coil rated for operational voltage.
Reset button free and fuctional.
Contractor size.
Contract points clean and making contact.
Movable parts freely functional.
Visually clean (not corroded).
No moisture present.
Enclosure has breather and drain.
Covers on tight, all screws and bolts in place.
Seals filled.
Grounding.
Enclosure approved for area clasification.
If furnished with control transformes check size and rating.
Conductor connections and and identifications
Approval
Contractor Date:
Date:
F.C.Elctrico 07 Lista de Chequeo de Instalacin de Campo (Arrancadores).XLS
FIELD INSTALLATION CHECK LIST (SWITCHGEAR)
Project No.: Owner: Report No.:
Prepared by: Location: Date:
Equipment Name or Number:
Unit Name or Function:
Item to Check CONT. Remarks
Megger Readings - Bus to Bus
Megger Readings - Bus to GND
Megger Reading - Control Transformer Primary
Megger Reading - Potential Transformer Primary
Transformers - drawout operation
Control Transformer type -
size
Potential Transformer fuse type -
size
Grounding, case, neutral bar
Tagging
Cubicle clean
Instruments clean
Visual check of breaker
Manual Operation
Clearance
Contact Alignment
Electrically Operate (must be operated
manually first). Close and trip from all
devices so installed (pushbuttons, relays,
undervoltage trips, etc.)
Approval
Contractor Date:
Date:
F.C.Elctrico 08 Lista de Chequeo de Instalacin de Campo (Interruptores).XLS
FIELD INSTALLATION CHECK LIST (TRANSFORMES)
Project No.: Owner: Report No.:
Prepared by: Location: Date:
Equipment No.: P.O. No.: Spec. No.:
Service: Installed By:
Item to Check Contractor Remarks
OK
Protective grounding is correctly installed and connected
to main ground system.
Remove temporary shipping blocking porcelain protective
crating.
Inspect for cleanliness, bushing, control cabinet and other
operating accessories.
No chips, cracks or other apparent damage to porcelain
or bushings and lightning arresters.
No insulating oil leaks in tank, radiators, flange or piping
connections.
Lubrication and freedom of motion of tap changers and any
other operating accesories.
Lubrication and freedom of rotation of cooling fans.
Tank oil level is correct, taking into consideration
temperature of oil.
Determine dielectric strength of insulating oil.
Oil level, temperature and pressure sensing devices are
connected and functioning properly.
Approval
Contractor Date:
Date:
F.C.Elctrico 09 Lista de Chequeo de Instalacin de Campo (Transformadores).XLS
MEDIUM VOLTAGE MOTOR CONTROL CENTER TEST RECORD
Project No.: Owner: Report No.
Prepared by: Location: Date:
Manufacturer: Type: Serial No.:
Dwg No.: Voltage Class: Cubicle No.:
Voltage Class: Voltage Class: Cubicle No.:
CONSISTING OF AIR BREAKERS VACUUM BREAKERS RELAYS INSTRUMENTS MOLDED CASE
BREAKERS
MEGGER TEST RESULTS
TEST DESCRIPTION MEGOHMS
Remarks
Contractor Signature Date
Owner Date
F.C.Elctrico 10 Record de Pruebas de Voltaje Medio.XLS
FIELD INSTALLATION CHECK LIST (MOTOR CONTROL CENTERS)
Project No.: Owner: Report No.:
Prepared by: Location: Date:
Equipment No.: P.O. No.: Spec. No.:
Service: Installed By:
Item to Check Contractor Remarks
OK
Protective grounding is correctly installed and connected
to main ground system.
Remove all foreing material from switchgear, including any
shipping blocking.
Inspect for cleanliness, and remove all dirt dust, grease and
moisture.
Inspect main switchgear and auxiliary equipment for any
apparent damage or missing parts.
Inspect main bus and bus taps to switches and potential
transformes.
Each unit or cubicle is fumished complete with nameplate.
Nameplate spelling in accordance with approval drawings.
Determine that all terminal block connections are secure
and properly identified.
Manualy operate breakers.
Nameplate voltage, current and interrupting capacity ratings
of breaker.
Approval
Contractor Date:
S.P.C.C. Date:
F.C.Elctrico 11 Lista de Chequeo de Instalacin de Campo (Centros de Control Motor).XLS
DATOS DE BOMBA Y ACEPTACION
Proyecto No.: Propietario: Reporte No.
Preparado por: Ubicacin: Fecha:
Fabricante: Orden de Compra No.:
Numero de Bomba: Numero de Serie: Servicio:
Tipo: Tamao: Sello:
Rodamiento Axial: Rodamiento Radial: Empaque:
Tipo de Acoplamiento: Luz del acoplamiento: Fecha Verif. Rot. de Motor:
Aliniamiento Inicial:
Propietario
Aliniamiento Final:
Propietario
Base Nivelada Verif. de Alivio de Cargas en Tuberias de Tipo de Aceite
Succin y Descarga.
Fecha: Fecha: Fecha:
Grauteado de Bomba: Conexin de Tuberia/Verif. de Aliniamiento Acoplamiento/Engrasado y
Inicial en frio. Acoplado
Fecha: Fecha: Fecha:
Verif. Ajuste de Pernos de Anclaje Verif. Inst. sellos/Empaques Corrida de Bomba/ Verif. Rodamiento
Fecha: Fecha: Fecha:
Aliniamiento Iniciqal en Frio Puega de Rodamientos y Lubricacin Clavo de Fijacin
Fecha: Fecha: Fecha:
Remarks
Firma Contratista: Fecha
Firma Inspector: Fecha
Firma Propietario: Fecha
ALINIAMIENTO INICIAL ALINIAMIENTO FINAL
F.C.Elctrico 12 Datos de Bomba y Aceptacin.XLS

Potrebbero piacerti anche